Total ongoing projects: 88 |
||||||||
|---|---|---|---|---|---|---|---|---|
| Project Type | Project Name | Start Year End Year |
Approved Cost & Cumulative Expenditure (Lakh Tk.) |
District | Upazila | Constituency | Status | Download |
| OTHERS | Rehabilitation Polder's (No. 67/A, 67, 67/B & 68) along border river of Naf for Improving Bangladesh & Mayanmar Security at Ukhia & Teknaf Upazila in cox's Bazar District (2nd Revised) |
FEB-18 JUN-27 |
41,558.05 22,257.02 |
COX'S BAZAR | TEKNAF, UKHIA | Cox's Bazar-4 | On Going | Download |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Flood Control Drainage Improvement and Water Logging mitigation of Chittagong City (1st Revised) |
APR-19 JUN-27 |
150,838.01 145,326.98 |
CHATTOGRAM | HATHAZARI, KOTWALI | Chattogram-5, Chattogram-9, Women Seat-8 | On Going | Download |
| OTHERS | Small-scale watercraft procurement project to enhance the capacity of the Ministry of Water Resources and organizations (2nd revised) |
JUL-19 JUN-27 |
5,409.42 5,371.24 |
On Going | ||||
| LAND RECLAMATION | Madhumati-Navaganga Sub-Project Rehabilitation and Rejuvenation and Ecological Rebalancing of Navaganga River through Reclamation/Dredging Project (1st Revised) |
DEC-19 JUN-27 |
34,275.33 29,241.38 |
NARAIL | LOHAGARA | Narail-2 | On Going | Download |
| BANK PROTECTION | Bank Protective Work along the Both Bank of Kushiyara River in front of Bibiyana Power Plants in Habiganj District (1st Revised) |
JUN-20 JUN-27 |
54,173.64 45,045.34 |
HABIGANJ | BAHUBAL, BANIACHONG, LAKHAI, MADHABPUR, NABIGANJ | Habiganj-1, Habiganj-2, Habiganj-3, Habiganj-4 | On Going | Download |
| BANK PROTECTION | River Bank Protection work along the Right and Left Bank of Dharla River with Flood Control in Kurigram Sadar, Rajarhat & Fulbari Upazila in Kurigram District. (1st Revised) |
JUN-20 DEC-27 |
62,945.28 47,280.88 |
KURIGRAM | KURIGRAM SADAR, PHULBARI, RAJARHAT | Kurigram-2 | On Going | Download |
| BANK PROTECTION | Protection Project at Moulvibazar sadar, Rajnagar and Kulaura upazilla from erosion of Monu River. |
JUL-20 JUN-28 |
99,628.00 56,657.97 |
MOULVIBAZAR | KULAURA, MAULVIBAZAR SADAR, RAJNAGAR | Moulvibazar-2, Moulvibazar-3 | On Going | Download |
| OTHERS | Char Development and Settlement Project-Bridging (Additional Financing) (BWDB Part) (1st Revised) |
AUG-20 JUN-27 |
31,159.18 18,469.54 |
NOAKHALI | COMPANIGANJ, HATIYA, KABIRHAT, SUBARNACHAR | Noakhali-4, Noakhali-5, Noakhali-6 | On Going | Download |
| BANK PROTECTION | Removal of Drainage Congestion from Kopotakkho River Basin (Phase-2) (1st Revised) |
SEP-20 JUN-27 |
50,158.51 36,982.94 |
JASHORE, JHENAIDAH, KHULNA, SATKHIRA | ASSASUNI, CHAUGACHHA, JHIKARGACHHA, KALAROA, KESHABPUR, KOTCHANDPUR, KOYRA, MAHESHPUR, MANIRAMPUR, PAIKGACHHA, TALA | Jashore-2, Jashore-5, Jashore-6, Jhenaidah-3, Khulna-6, Satkhira-1, Satkhira-3, Women Seat-14 | On Going | Download |
| BANK PROTECTION | Protection of Dhulia launchghat, Baupal Upazilla, Patuakhali District to Durgapasha of Bakergonj Upazilla in Barisal District from erosion of Tetulia river. (1st Revised) |
SEP-20 JUN-27 |
74,802.63 66,860.63 |
BARISHAL, PATUAKHALI | BAKERGANJ, BAUPHAL | Barishal-6, Patuakhali-2 | On Going | Download |
| DRAINAGE | Bhairob River Re-excavation Project (2nd Phase) (1st Revised) |
NOV-20 JUN-27 |
27,307.35 25,402.50 |
CHUADANGA, MEHERPUR | CHUADANGA SADAR, DAMURHUDA, MUJIB NAGAR | Chuadanga-1, Chuadanga-2, Meherpur-1 | On Going | Download |
| BANK PROTECTION | Protection of Katlamari area at Fulchari Upazila, Gobindi &Holdia area at Saghata Upazila from erosion of Jamuna River in Gaibandha District (1st Revised) |
JAN-21 DEC-26 |
83,096.76 68,162.45 |
GAIBANDHA | FULCHHARI, SAGHATA | Gaibandha-5 | On Going | Download |
| BANK PROTECTION | Protection of Daulatkhan Pouroshova, Chokighat and other more valuable area from the erosion of the Meghna River in Bhola District (1st Revised) |
APR-21 JUN-27 |
55,738.69 49,813.81 |
BHOLA | BURHANUDDIN, DAULAT KHAN | Bhola-2 | On Going | Download |
| OTHERS | Command Area Development and extension of Teesta Irrigation Project |
JUN-21 DEC-26 |
145,233.00 86,685.36 |
DINAJPUR, NILPHAMARI, RANGPUR | BADARGANJ, CHIRIRBANDAR, DIMLA, GANGACHARA, JALDHAKA, KHANSAMA, KISHOREGANJ, NILPHAMARI SADAR, PARBATIPUR, RANGPUR SADAR, SAIDPUR, TARAGANJ | Dinajpur-4, Dinajpur-5, Nilphamari-1, Nilphamari-2, Nilphamari-3, Nilphamari-4, Rangpur-1, Rangpur-2, Rangpur-3, Women Seat-36, Women Seat-7 | On Going | Download |
| BANK PROTECTION | Protection work at the bank of Meghna river at Borokheri, Ludhuabazar and kader ponditer hat areas in Ramgoti and Kamal Nagar upazila under Lakshmipur District |
JUL-21 DEC-26 |
308,996.99 184,728.79 |
LAKSHMIPUR | KAMALNAGAR, RAMGATI | Lakshmipur-4, Women Seat-24 | On Going | Download |
| OTHERS | Rehabilitation of Tangoan Barage, Buri Bundh and Bhully Bundh Irrigation Projects, River Bank Protection and Construction of Combined Water Control Structure at Thakurgaon District (1st Revised) |
JUL-21 DEC-26 |
33,625.13 25,783.75 |
THAKURGAON | THAKURGAON SADAR | Thakurgaon-1 | On Going | Download |
| BANK PROTECTION | Flood control, Drainage and Irrigation Project in Patiya Upazilla in Chittagong District |
AUG-21 JUN-27 |
115,836.00 53,837.05 |
CHATTOGRAM | PATIYA | Chattogram-12 | On Going | Download |
| BANK PROTECTION | Bank Protective Work along the Left Bank of Padma River down of Padma Multipurpose Bridge in Louhajong and Tongibari Upazila at Munshigonj District (2nd Revised) |
OCT-21 SEP-26 |
52,750.00 45,490.66 |
MUNSHIGANJ | LOHAJANG, TONGIBARI | Munshiganj-2 | On Going | Download |
| OTHERS | Management and Improvement of Dudhkumar River Flowing through the Kurigram District |
OCT-21 JUN-27 |
69,214.59 49,701.78 |
KURIGRAM | BHURUNGAMARI, KURIGRAM SADAR, NAGESHWARI | Kurigram-1, Kurigram-2 | On Going | Download |
| OTHERS | Rehabilitation of Polder No. 15 in Satkhira District (1st Revised) |
OCT-21 JUN-27 |
102,017.00 65,008.01 |
SATKHIRA | SHYAMNAGAR | Satkhira-4 | On Going | Download |
| BANK PROTECTION | Disaster Risk Management Extension Project (Component-I, BWDB Part) (1st Revised) |
DEC-21 JUN-27 |
89,675.22 67,113.18 |
BAGERHAT, KHULNA, SATKHIRA | ASSASUNI, BAGERHAT SADAR, BATIAGHATA, DACOPE, DIGHALIA, KALIGANJ, KHALISHPUR, KOYRA, MORRELGANJ, PAIKGACHHA, SHYAMNAGAR | Bagerhat-2, Bagerhat-4, Khulna-1, Khulna-3, Khulna-4, Khulna-6, Satkhira-3, Satkhira-4 | On Going | Download |
| LAND RECLAMATION | Climate Smart Agriculture and Water Management Project (BWDB part) |
DEC-21 JUN-27 |
118,255.00 27,355.14 |
On Going | Download | |||
| BANK PROTECTION | Rehabilitation of Polders 43/1 and 44B under Barguna District and Protection of Vulnerable Area from Payra River Erosion Project (1st Revised) |
JAN-22 JUN-27 |
71,225.00 36,985.17 |
BARGUNA | AMTALI | Barguna-1 | On Going | Download |
| OTHERS | Rehabilitation Project of Polder No-14/1 of Khulna District |
JAN-22 DEC-26 |
117,231.25 49,184.39 |
KHULNA | KOYRA | Khulna-6 | On Going | Download |
| REHABILATATION | Rehabilitation of Coastal Embankment, Development of Drainage System and Bank Conservation at Mujib Nagar and Manpura in Bhola District (Phase 1) (1st Revisrd) |
APR-22 JUN-27 |
111,700.00 82,930.20 |
BHOLA | CHAR FASSON, MANPURA | Bhola-4 | On Going | Download |
| BANK PROTECTION | Rehabilitation of Polder No. 41/6A and 41/6B and 41/7A under Barguna District and protection of other vulnerable areas including Bishkhali and Payra River from erosion of Betagi town. |
APR-22 MAR-28 |
82,649.25 30,961.33 |
BARGUNA | BARGUNA SADAR, BETAGI | Barguna-1, Barguna-2 | On Going | Download |
| BANK PROTECTION | Riverside protection works, wave protection and canal re-excavation projects in 10 upazilas of Kishoreganj district (1st Revised) |
JUN-22 DEC-26 |
64,185.22 55,799.07 |
KISHOREGANJ | KISHOREGANJ SADAR | Kishoreganj-1 | On Going | Download |
| BANK PROTECTION | Rehabilitation of Coastal Embankments, Development of Drainage System and Conservation of Banks in Tajumuddin and Lalmohan Upazilas (Phase 1) (1st Revised) |
JUN-22 JUN-27 |
110,000.00 83,105.65 |
BHOLA | LALMOHAN, TAZUMUDDIN | Bhola-3 | On Going | Download |
| BANK PROTECTION | Conservation of Morelganj Upazila Sadar and adjacent areas of Bagerhat District from Panguchi River break and Bishkhali River Re-Dredging Project |
JUL-22 JUN-27 |
65,883.18 30,434.91 |
BAGERHAT | MORRELGANJ | Bagerhat-4 | On Going | Download |
| BANK PROTECTION | Irrigation and Drainage Development Project of Purbadhala Upazila of Netrakona District |
JUL-22 JUN-27 |
17,631.50 13,716.28 |
NETROKONA | PURBADHALA | Netrokona-5, Women Seat-26 | On Going | Download |
| BANK PROTECTION | Protection of Khagrachari city and adjacent infrastructure from river erosion. |
AUG-22 JUN-28 |
62,216.75 28,634.91 |
KHAGRACHHARI, RANGAMATI | DIGHINALA, GUIMARA, KHAGRACHHARI SADAR, LANGADU, MAHALCHHARI, NANIARCHAR, PANCHHARI | Khagrachhari, Rangamati | On Going | Download |
| BANK PROTECTION | Barisal Cantonment Area Protection Project from Erosion of Factories, Bighai and Payra Rivers in Barisal District (Phase 1) |
APR-23 DEC-26 |
67,600.00 33,694.60 |
BARISHAL | BARISHAL SADAR (KOTWALI) | Barishal-5 | On Going | Download |
| BANK PROTECTION | Construction of Multipurpose Hydraulic Elevator DAM in Shrimai Canal of Patia Upazila of Chittagong District. |
APR-23 JUN-27 |
13,303.00 5,496.35 |
CHATTOGRAM | PATIYA | Chattogram-12 | On Going | Download |
| IRRIGATION | Rehabilitation of Meghna-Dhangoda Irrigation Scheme and conservation of river banks. |
APR-23 JUN-27 |
34,765.69 21,559.30 |
CHANDPUR | MATLAB UTTAR | Chandpur-2 | On Going | Download |
| FLOOD CONTROL | Flood Reconstruction Emergency Assistance project (FREAP) (1st Revised) |
JUN-23 JUN-27 |
74,826.35 53,736.34 |
SUNAMGANJ, SYLHET | BALAGANJ, BEANI BAZAR, BISHWAMBARPUR, BISHWANATH, CHHATAK, COMPANIGANJ, DERAI, DHARAMPASHA, DOWARABAZAR, FENCHUGANJ, GOLAPGANJ, GOWAINGHAT, JAGANNATHPUR, JAINTIAPUR, JAMALGANJ, KANAIGHAT, SHANTIGANJ (DAKSHIN SUNAMGANJ), SULLA, SUNAMGANJ SADAR, SYLHET SADAR, TAHIRPUR, ZAKIGANJ | Sunamganj-1, Sunamganj-2, Sunamganj-3, Sunamganj-4, Sunamganj-5, Sylhet-1, Sylhet-2, Sylhet-3, Sylhet-4, Sylhet-5, Sylhet-6 | On Going | Download |
| BANK PROTECTION | Conservation and dredging of Shaheed Birshrestha Munshi Abdur Rauf Memorial Museum and other areas including road connection from the left bank of Madhumati river in Faridpur district. |
JUN-23 JUN-27 |
48,675.64 37,966.33 |
FARIDPUR | ALFADANGA, MADHUKHALI | Faridpur-1 | On Going | Download |
| BANK PROTECTION | Charkaua, Chandmari, Jagua, Lamchari and Charmonai areas in Sadar Upazila of Barisal District against Kirtankhola River Erosion Protection Project (1st Phase) |
JUN-23 JUN-27 |
51,292.00 39,996.15 |
BARISHAL | BARISHAL SADAR (KOTWALI) | Barishal-5 | On Going | Download |
| BANK PROTECTION | Project to protect the Mazhirghat zero point area from the breach of the right bank of Padma river in Jazira upazila of Shariatpur district. |
SEP-23 JUN-27 |
120,243.53 58,028.96 |
SHARIATPUR | ZANJIRA | Shariatpur-1 | On Going | Download |
| OTHERS | Conservation of slope with permanent rehabilitation of damaged dam of Polder No. 72 in Sandwip Upazila of Chittagong District |
SEP-23 JUN-27 |
56,221.00 5,306.75 |
CHATTOGRAM | SANDWIP | Chattogram-3 | On Going | Download |
| OTHERS | Uri Char-Noakhali Cross Dam construction project aimed at land reclamation |
SEP-23 JUN-27 |
58,894.00 24,082.18 |
NOAKHALI | COMPANIGANJ, SUBARNACHAR | Noakhali-4, Noakhali-5 | On Going | Download |
| BANK PROTECTION | Implementation of protective works to protect infrastructures built on canals in Hatia Upazila of Noakhali District from the Meghna River breach. |
OCT-23 JUN-27 |
37,804.54 26,665.19 |
NOAKHALI | HATIYA | Noakhali-6 | On Going | Download |
| BANK PROTECTION | Aymon river reclamation and riverbank conservation in Muktagachha upazila of Mymensingh district |
OCT-23 JUN-27 |
4,000.42 3,728.28 |
MYMENSINGH | FULBARIA, MUKTAGACHHA | Mymensingh-5, Mymensingh-6, Women Seat-39 | On Going | Download |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Integrated water resource management implementation project for Tungipara-Kotalipara upazila of Gopalganj district |
OCT-23 DEC-28 |
89,355.05 10,745.53 |
BARISHAL, GOPALGANJ, MADARIPUR | AGAILJHARA, GOPALGANJ SADAR, KOTALIPARA, RAJOIR, TUNGIPARA | Barishal-1, Gopalganj-2, Gopalganj-3, Madaripur-2 | On Going | Download |
| BANK PROTECTION | Rehabilitation of Flood Control Dam (Jiwan Raksha Dam) in Raipur Union of Sadar and Barhatta Upazila of Netrokona District and implementation of defense works to prevent erosion of Kangs river. |
NOV-23 JUN-27 |
4,770.00 3,534.92 |
NETROKONA | BARHATTA, NETROKONA SADAR | Netrokona-2 | On Going | Download |
| BANK PROTECTION | Project to protect the old Hijla, Baushia and Harinathpur areas under Hijla upazila from the collapse of Meghna branch river. |
NOV-23 JUN-27 |
62,886.00 32,185.93 |
BARISHAL | HIZLA | Barishal-4 | On Going | Download |
| BANK PROTECTION | Protection of Talbaria under Mirpur upazila of Kushtia district and Komarkandi area of Shilaidah union under Kumarkhali upazila from the breach of Padma river. |
NOV-23 JUN-28 |
164,936.97 87,328.35 |
KUSHTIA | KUMARKHALI, MIRPUR | Kushtia-2, Kushtia-4 | On Going | Download |
| REHABILATATION | Rejuvenation of Ichamati River in Pabna District |
DEC-23 JUN-28 |
158,515.50 12,424.60 |
PABNA | ATGHARIA, BERA, ISHWARDI, PABNA SADAR, SANTHIA | Pabna-1, Pabna-4, Pabna-5 | On Going | Download |
| BANK PROTECTION | Re-excavation of Shubhadha Canal under Keraniganj Upazila of Dhaka District and Development and Protection Project of both banks of the canal (1st Phase) |
DEC-23 JUN-27 |
35,337.00 16,552.37 |
DHAKA | KERANIGANJ | Dhaka-3, Women Seat-11 | On Going | Download |
| FLOOD CONTROL AND DRAINAGE | Implementation of protective works to protect various places of Feni River and Chhota Feni River under Sonagazi and Daganbhuiya Upazilas of Feni District from bank erosion. |
DEC-23 JUN-27 |
5,306.19 2,989.11 |
FENI | DAGANBHUIYAN, SONAGAZI | Feni-3 | On Going | Download |
| BANK PROTECTION | Conservation Rehabilitation of Chadmpur City |
DEC-23 JUN-27 |
81,565.00 34,518.44 |
CHANDPUR | CHANDPUR SADAR | Chandpur-3, Women Seat-3 | On Going | Download |
| BANK PROTECTION | Protection of various areas of Sadar Upazila and Nalchiti Upazila of Jhalkathi District from the erosion of Sugandha River |
JAN-24 JUN-27 |
71,476.00 25,922.02 |
JHALOKATHI | JHALOKATI SADAR, NALCHITY | Jhalokathi-2, Women Seat-12 | On Going | Download |
| BANK PROTECTION | Bhola Sadar Upazila Protection Project from Meghna River Eruption |
JAN-24 JUN-27 |
68,910.00 33,701.97 |
BHOLA | BHOLA SADAR | Bhola-1 | On Going | Download |
| BANK PROTECTION | Implementation of permanent river bank protection works on the right and left banks of the transboundary Someshwari river in Durgapur upazila in Netrakona district. |
APR-24 JUN-27 |
4,588.00 3,013.18 |
NETROKONA | DURGAPUR | Netrokona-1 | On Going | Download |
| BANK PROTECTION | Mansoor Ahmed Women's College, Ispinjapur and Gopalpur markets in Barhatta upazila of Netrakona district, conservation of Kangsh river banks |
JUN-24 JUN-27 |
4,400.00 2,682.01 |
NETROKONA | BARHATTA | Netrokona-2 | On Going | Download |
| RIVER DREDGING | Protection of Rasulpur village and re-dredging of the river from Kachamatia river breach in Nandail upazila in Mymensingh district. |
JUN-24 JUN-27 |
4,881.00 2,986.15 |
MYMENSINGH | NANDAIL | Mymensingh-9 | On Going | Download |
| LAND RECLAMATION | Sustainable Water Management Project in Banshkhali and Anwara Upazilas of South Chittagong (1st Phase) |
JUL-24 JUN-27 |
87,457.00 38,362.33 |
CHATTOGRAM | BANSHKHALI | Chattogram-16 | On Going | Download |
| OTHERS | Feasibility study update of North Rajshahi Irrigation Project and feasibility study of rehabilitation work of existing light irrigation projects in Dinajpur, Thakurgaon and Panchagarh districts |
JUL-24 JUN-27 |
968.80 315.28 |
On Going | ||||
| OTHERS | Feasibility study of basin-based water management project for rivers in Barisal region |
JUL-24 JUN-27 |
999.00 348.49 |
On Going | ||||
| BANK PROTECTION | Bank conservation work to prevent the erosion of Karnaphuli river and connected canals under Boalkhali upazila of Chittagong district. |
JUL-24 DEC-26 |
13,409.00 9,007.74 |
CHATTOGRAM | BOALKHALI | Chattogram-8 | On Going | Download |
| BANK PROTECTION | Jamuna River Sustainable Management Project-1: River Bank Protection and River Management (Component-1) |
OCT-24 DEC-27 |
87,328.00 2,787.89 |
GAIBANDHA, TANGAIL | FULCHHARI, KALIHATI | Gaibandha-5, Tangail-4 | On Going | Download |
| BANK PROTECTION | Implementation of defense work on the Matamuhuri River to protect Lamabazar in Lama Upazila of Bandarban district |
JAN-25 JUN-27 |
3,277.38 2,811.83 |
BANDARBAN | LAMA | Bandarban | On Going | Download |
| TOWN PROTECTION | Protection of launch ghat, ferry ghat and adjacent areas adjacent to Indurhat Port on the right bank of Sandhya River under Nesarabad (Swarupkathi) Upazila of Pirojpur District |
JAN-25 DEC-26 |
4,726.00 2,580.84 |
PIROJPUR | NESARABAD (SWARUPKATI) | Pirojpur-1 | On Going | Download |
| OTHERS | Bangladesh Sustainable Recovery, Emergency Preparednee and Response Project (B-Strong) (BWDB Part) |
JUL-25 JUN-29 |
59,972.23 721.93 |
BRAHMANBARIA, CUMILLA, FENI, LAKSHMIPUR, NOAKHALI | AKHAURA, BURICHANG, CHHAGALNAIYA, COMPANIGANJ, CUMILLA ADARSHA SADAR, DAGANBHUIYAN, DAUDKANDI, FENI SADAR, FULGAZI, HATIYA, LAKSHMIPUR SADAR, MURADNAGAR, PARSHURAM, RAMGATI, ROYPUR, SONAGAZI, SUBARNACHAR, TITAS | Brahmanbaria-4, Cumilla-1, Cumilla-2, Cumilla-3, Cumilla-5, Cumilla-6, Feni-1, Feni-2, Feni-3, Lakshmipur-2, Lakshmipur-3, Lakshmipur-4, Noakhali-4, Noakhali-5, Noakhali-6, Women Seat-24, Women Seat-38, Women Seat-4 | On Going | Download |
| OTHERS | Expansion of irrigation facilities by quickly resolving waterlogging in Bhabadah and adjacent beel areas |
JUL-25 JUN-27 |
4,541.00 23.97 |
JASHORE | JASHORE SADAR | Jashore-3 | On Going | |
| BANK PROTECTION | Re-excavation of Dhaleshwari and Lauhajang rivers under Tangail district and river bank protection work in Tangail municipal area |
OCT-25 JUN-27 |
4,795.30 51.50 |
TANGAIL | TANGAIL SADAR | Tangail-5 | On Going | |
| BANK PROTECTION | Development of flood management and drainage system in Bamni River Basin of Noakhali District |
OCT-25 JUN-27 |
4,799.54 1,475.24 |
NOAKHALI | NOAKHALI SADAR | Noakhali-4 | On Going | |
| BANK PROTECTION | Defense of the right bank of the Dholbhanga River in Bancharampur Upazila of Brahmanbaria District and the right bank of the Lower Titas River in Ujanchar Union |
OCT-25 JUN-27 |
4,212.98 4.41 |
BRAHMANBARIA | BANCHHARAMPUR | Brahmanbaria-6 | On Going | |
| DRAINAGE | Waterlogging relief through excavation/re-excavation of Nawab Canal, Nayagola Canal and Railway Borough Pit in the municipal area of Chapainawabganj district |
OCT-25 JUN-27 |
4,846.70 315.51 |
CHAPAI NAWABGANJ | CHAPAI NABABGANJ SADAR | Chapainawabganj-3 | On Going | |
| OTHERS | Magra River Revitalization Project under Netrakona District |
NOV-25 JUN-27 |
4,849.70 9.29 |
On Going | ||||
| REHABILATATION | Revitalization and depollution of Sutang River in Habiganj District |
NOV-25 DEC-27 |
4,774.62 49.40 |
On Going | ||||
| OTHERS | Salta River Revitalization, Pollution-Free and Encroachment-Free Project in Khulna District |
DEC-25 JUN-27 |
2,273.62 482.00 |
On Going | ||||
| BANK PROTECTION | Protecting various areas of Mehendiganj Upazila of Barisal district from erosion of Tentulia River |
JAN-26 JUN-29 |
73,988.00 1,499.40 |
BARISHAL | MEHENDIGANJ | Barishal-4 | On Going | |
| OTHERS | Waterlogging and irrigation system development through re-drainage of Hisna and Sagarkhali rivers in Kushtia district |
JAN-26 DEC-27 |
4,884.00 449.89 |
On Going | ||||
| OTHERS | Emergency maintenance and rehabilitation of Ganga Kapotaksha Irrigation Project |
JAN-26 JUN-29 |
129,996.91 105.57 |
On Going | ||||
| OTHERS | Surma-Kushiyara River Basin Development and Flood and Integrated Water Resources Management Project |
JAN-26 JUN-28 |
127,377.03 113.20 |
On Going | ||||
| OTHERS | Waterlogging of beels and residential areas adjacent to the Sholmari River in Dumuria and Batiaghata upazilas of Khulna district |
JAN-26 JUN-28 |
4,826.65 173.65 |
KHULNA | BATIAGHATA, DUMURIA | Khulna-1, Khulna-5 | On Going | |
| LAND RECLAMATION | Protection of coastal polder No. 39/2D from erosion of Baleshwar River in Boro Machua Rocketghat area of Mathbaria upazila of Pirojpur district |
JAN-26 JUN-28 |
4,644.58 99.69 |
PIROJPUR | MATHBARIA | Pirojpur-3 | On Going | |
| OTHERS | Feasibility study project on sustainable management of rivers in Dinajpur district |
JAN-26 APR-28 |
441.61 2.31 |
On Going | ||||
| BANK PROTECTION | Bank protection and Nagda canal re-excavation to protect both banks of Turag River in Gazipur district from erosion |
JAN-26 DEC-28 |
3,900.61 40.80 |
On Going | ||||
| OTHERS | Sustainable Water Management Project of Karnaphuli and Associated Rivers (Kachalong, Raikhyang and Shalak Rivers) in Rangamati Hill District |
JAN-26 JUN-30 |
68,739.00 475.25 |
On Going | ||||
| OTHERS | Re-excavation, pollution-free and encroachment-free of the Baronai River in Rajshahi and Natore districts |
JAN-26 JUN-28 |
4,650.12 33.80 |
On Going | ||||
| OTHERS | Rejuvenating, encroaching and pollution-free Bankkhali River in Cox's Bazar district |
JAN-26 JUN-28 |
4,750.80 18.49 |
On Going | ||||
| OTHERS | Rejuvenation of Alaikuri River in Rangpur District |
JAN-26 JUN-28 |
3,180.11 49.27 |
On Going | ||||
| LAND RECLAMATION | Integrated management of water and land resources to improve the quality of life in the Arial Beel area (BWDB section) |
JAN-26 JUN-30 |
34,084.96 25.14 |
On Going | ||||
| BANK PROTECTION | Conservation of both banks of the Padma River in Chapainawabganj district (Part 1) |
FEB-26 DEC-29 |
74,806.00 12.50 |
On Going | ||||
| OTHERS | Sustainable management of rivers in Panchagarh and Thakurgaon districts (Part 1) |
FEB-26 DEC-29 |
67,880.00 0.00 |
On Going | ||||
| OTHERS | Project Preparatory Study for Metro Dhaka Water Security and Resilience Program (Turag, Tongi Canal, Balu and Shitalakshya Rivers) (Bapaubo Component) |
JUL-26 JUN-27 |
1,544.00 |
On Going | ||||
| BANK PROTECTION | Padma Barrage (1st Phase) |
JUL-26 JUN-33 |
34,347.25 |
BAGERHAT, CHAPAI NAWABGANJ, CHUADANGA, FARIDPUR, GOPALGANJ, JASHORE, JHENAIDAH, KHULNA, KUSHTIA, MAGURA, MEHERPUR, NAOGAON, NARAIL, NATORE, PABNA, PIROJPUR, RAJBARI, RAJSHAHI, SATKHIRA | ABHAYNAGAR, ALAMDANGA, ALFADANGA, ASSASUNI, ATGHARIA, BAGATIPARA, BAGERHAT SADAR, BAGHA, BAGHER PARA, BAGHMARA, BALIAKANDI, BARAIGRAM, BATIAGHATA, BERA, BHANDARIA, BHANGA, BHANGURA, BHERAMARA, BHOLAHAT, BOALIA, BOALMARI, CHAPAI NABABGANJ SADAR, CHAR BHADRASAN, CHARGHAT, CHATMOHAR, CHAUGACHHA, CHITALMARI, CHUADANGA SADAR, DACOPE, DAMURHUDA, DAULATPUR, DEBHATA, DIGHALIA, DUMURIA, DURGAPUR, FAKIRHAT, FARIDPUR, FARIDPUR SADAR, GANGNI, GOALANDA, GODAGARI, GOMASTAPUR, GOPALGANJ SADAR, GURUDASPUR, HARINAKUNDA, ISHWARDI, JASHORE SADAR, JHENAIDAH SADAR, JHIKARGACHHA, JIBAN NAGAR, KACHUA, KALAROA, KALIA, KALIGANJ, KASHIANI, KAWKHALI, KESHABPUR, KHALISHPUR, KHAN JAHAN ALI, KHOKSA, KHULNA SADAR, KOTALIPARA, KOTCHANDPUR, KOYRA, KUMARKHALI, KUSHTIA SADAR, LALPUR, LOHAGARA, MADHUKHALI, MAGURA SADAR, MAHESHPUR, MANIRAMPUR, MATHBARIA, MATIHAR, MEHERPUR SADAR, MIRPUR, MOHAMMADPUR, MOHANPUR, MOLLAHAT, MONGLA, MORRELGANJ, MUJIB NAGAR, MUKSUDPUR, NACHOLE, NAGARKANDA, NARAIL SADAR, NATORE SADAR, NAZIRPUR, NESARABAD (SWARUPKATI), NIAMATPUR, PABNA SADAR, PAIKGACHHA, PANGSHA, PHULTALA, PIROJPUR SADAR, PORSHA, PUTHIA, RAJBARI SADAR, RAJPARA, RAMPAL, RUPSA, SADARPUR, SALTHA, SAPAHAR, SARANKHOLA, SATKHIRA SADAR, SHAILKUPA, SHALIKHA, SHARSHA, SHIBGANJ, SHYAMNAGAR, SONADANGA, SREEPUR, SUJANAGAR, TALA, TANORE, TEROKHADA, TUNGIPARA | Bagerhat-1, Bagerhat-2, Bagerhat-3, Bagerhat-4, Chapainawabganj-1, Chapainawabganj-2, Chapainawabganj-3, Chuadanga-1, Chuadanga-2, Faridpur-1, Faridpur-2, Faridpur-3, Faridpur-4, Gopalganj-1, Gopalganj-2, Gopalganj-3, Jashore-1, Jashore-2, Jashore-3, Jashore-4, Jashore-5, Jashore-6, Jhenaidah-1, Jhenaidah-2, Jhenaidah-3, Jhenaidah-4, Khulna-1, Khulna-2, Khulna-3, Khulna-4, Khulna-5, Khulna-6, Kushtia-1, Kushtia-2, Kushtia-3, Kushtia-4, Magura-1, Magura-2, Meherpur-1, Meherpur-2, Naogaon-1, Narail-1, Narail-2, Natore-1, Natore-2, Natore-4, Pabna-1, Pabna-2, Pabna-3, Pabna-4, Pabna-5, Pirojpur-1, Pirojpur-2, Pirojpur-3, Rajbari-1, Rajbari-2, Rajshahi-1, Rajshahi-2, Rajshahi-3, Rajshahi-4, Rajshahi-5, Rajshahi-6, Satkhira-1, Satkhira-2, Satkhira-3, Satkhira-4, Women Seat-13, Women Seat-14, Women Seat-19, Women Seat-20, Women Seat-30, Women Seat-31, Women Seat-37, Women Seat-49, Women Seat-5, Women Seat-50, Women Seat-6 | On Going | |