Total Completed Projects are: 1053 |
||||||||
|---|---|---|---|---|---|---|---|---|
| Project Type | Project Name | Start Year End Year |
Project Cost Exp ( Lakh Tk ) |
District | Upazila | Constituency | Status | Download |
| DRAINAGE | Re-excav. of Brahmandia khal | JUL-43 JUN-45 | 0.14 0.14 | BARISHAL | BABUGANJ | Barishal-3 | Completed | |
| DRAINAGE | Re-excav.of Kaladaha khal | JUL-44 JUN-45 | 0.78 0.74 | JHALOKATHI | NALCHITY | Jhalokathi-2 | Completed | |
| DRAINAGE | Re-ex.ofNabagram Kachabalia kh | JUL-43 JUN-45 | 0.47 0.47 | JHALOKATHI | JHALOKATI SADAR | Jhalokathi-2 | Completed | |
| DRAINAGE | Re-ex.of Basail Khal | JUL-43 JUN-45 | 0.65 0.65 | BARISHAL | GAURNADI | Barishal-1 | Completed | |
| DRAINAGE | Re-ex.of Biskhali | JUL-44 JUN-46 | 0.64 0.64 | BARISHAL | BAKERGANJ | Barishal-6 | Completed | |
| DRAINAGE | Re-ex.of Natullabad khal | JUL-44 JUN-46 | 0.24 0.24 | JHALOKATHI | NALCHITY | Jhalokathi-2 | Completed | |
| DRAINAGE | Re-ex.of Pansaharan khal | JUL-44 JUN-46 | 0.29 0.29 | BARISHAL | WAZIRPUR | Barishal-2 | Completed | |
| DRAINAGE | Re-ex.ofHashemdia-Mutukchar kh | JUL-45 JUN-47 | 2.11 0.01 | FARIDPUR | BHANGA, SADARPUR | Faridpur-4 | Completed | |
| DRAINAGE | Re-ex.of Narayanpur khal | JUL-45 JUN-47 | 0.28 0.28 | BARISHAL | WAZIRPUR | Barishal-2 | Completed | |
| DRAINAGE | Kaolar Beel Project | JUL-49 JUN-50 | 0.77 0.77 | GAIBANDHA | SADULLAPUR | Gaibandha-3 | Completed | |
| DRAINAGE | Nuruler Beel Project | JUL-45 JUN-50 | 0.82 0.99 | GAIBANDHA | GOBINDAGANJ | Gaibandha-4 | Completed | |
| DRAINAGE | Kashadaha Beel Project | JUL-48 JUN-51 | 0.63 0.63 | GAIBANDHA | SUNDARGANJ | Gaibandha-1 | Completed | |
| DRAINAGE | Bapmara Loknath Mitra Project | JUL-51 JUN-54 | 2.19 1.88 | RAJSHAHI | DURGAPUR, PUTHIA | Rajshahi-5 | Completed | |
| FLOOD CONTROL | Emb.along Hangarbhanga-Dattapr | JUL-54 JUN-55 | 2.20 1.57 | HABIGANJ | BANIACHONG | Habiganj-2 | Completed | |
| DRAINAGE | Anup Nagar Beel Dr. Project | JUL-54 JUN-56 | 3.00 3.00 | CHUADANGA | ALAMDANGA | Chuadanga-1 | Completed | |
| DRAINAGE | Re-ex.of Chatra Nadi | JUL-51 JUN-56 | 4.00 3.21 | RAJBARI | PANGSHA | Rajbari-2 | Completed | |
| DRAINAGE | Raisa Beel Drainage Project | JUL-55 JUN-56 | 0.00 0.00 | CHUADANGA | DAMURHUDA | Chuadanga-2 | Completed | |
| DRAINAGE | Banatkhali Khal under G.K.Area | JUL-55 JUN-56 | 2.50 2.50 | CHUADANGA | ALAMDANGA | Chuadanga-1 | Completed | |
| DRAINAGE | Bishkhali Khal Drainage Proj. | JUL-56 JUN-57 | 8.95 8.95 | BAGERHAT | KACHUA, MORRELGANJ | Bagerhat-2, Bagerhat-4 | Completed | |
| DRAINAGE | Con.of sluice at Kanchikata kh | JUL-54 JUN-57 | 0.40 0.33 | NARSINGDI | MANOHARDI | Narsingdi-4 | Completed | |
| IRRIGATION | Bulli bundh Irrign.Proj.Ph-1 | JUN-57 | 3.70 3.70 | THAKURGAON | THAKURGAON SADAR | Thakurgaon-1 | Completed | |
| IRRIGATION | Buri bundh Irrigation Project | JUN-57 | 100.57 100.57 | THAKURGAON | THAKURGAON SADAR | Thakurgaon-1 | Completed | |
| DRAINAGE | Re-ex.of Niamatkhali khal | JUL-56 JUN-58 | 2.27 2.26 | NATORE | SINGRA | Natore-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Dr.sc.ofRatanpur Kaderpur Beel | JUL-56 JUN-58 | 0.58 0.57 | KUSHTIA | KHOKSA | Kushtia-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Dr.sc.of Bhutiar Beel(Dutch) | JUL-49 JUN-58 | 3.79 3.79 | KHULNA | TEROKHADA | Khulna-4 | Completed | |
| TOWN PROTECTION | Protection of Feni River bank | JUL-56 JUN-58 | 0.57 0.57 | KHAGRACHHARI | RAMGARH | Khagrachhari | Completed | |
| DRAINAGE | Re-ex.ofKuchiamara KathiarBeel | JUL-56 JUN-59 | 3.27 1.95 | FARIDPUR | FARIDPUR SADAR, NAGARKANDA | Faridpur-2, Faridpur-3 | Completed | |
| DRAINAGE | Re-ex.of Chinidanga SatoilBeel | JUL-53 JUN-59 | 2.54 2.57 | NATORE, PABNA | BARAIGRAM, CHATMOHAR | Natore-4, Pabna-3 | Completed | |
| DRAINAGE | Re-ex.of Fallibara khal | JUL-56 JUN-59 | 2.47 0.59 | FARIDPUR | BHANGA | Faridpur-4 | Completed | |
| FLOOD CONTROL | Embankment along Sutki River | JUL-56 JUN-59 | 22.02 21.13 | HABIGANJ | BANIACHONG | Habiganj-2 | Completed | |
| DRAINAGE | Re-ex.of Tamakpatti Khal | JUL-55 JUN-59 | 0.56 0.56 | JHALOKATHI | NALCHITY | Jhalokathi-2 | Completed | |
| FLOOD CONTROL | Constn. of Ghoramara Sluice | JUL-57 JUN-59 | 0.26 0.26 | MYMENSINGH | MYMENSINGH SADAR | Mymensingh-4 | Completed | |
| DRAINAGE | Loop cutting of Ghagat River | JUN-59 | 0.20 0.20 | GAIBANDHA | SADULLAPUR | Gaibandha-3 | Completed | |
| DRAINAGE | Re-excav.of Kumarkhali Canal | JUL-57 JUN-60 | 1.61 1.73 | PATUAKHALI | BAUPHAL | Patuakhali-2 | Completed | |
| IRRIGATION | Pathraj Embkt. Irrign. Project | JUL-54 JUN-60 | 7.06 7.42 | PANCHAGARH | BODA | Panchagarh-2 | Completed | |
| DRAINAGE | Drainage of Saradagiri Beel | JUL-56 JUN-60 | 0.76 1.35 | GAIBANDHA | PALASHBARI | Gaibandha-3 | Completed | |
| DRAINAGE | Dr.of Deolia Dudhkhoa Beel | JUN-60 | 0.00 0.00 | KURIGRAM, LALMONIRHAT | KURIGRAM SADAR, LALMONIRHAT SADAR, ULIPUR | Kurigram-2, Kurigram-3, Lalmonirhat-3 | Completed | |
| DRAINAGE | Regulator overKinu Sarker Jola | JUL-57 JUN-60 | 3.50 2.79 | PABNA | CHATMOHAR | Pabna-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Kumarnai Embkt. Project | JUN-61 | 2.56 2.56 | GAIBANDHA | GAIBANDHA SADAR | Gaibandha-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Bridge& Reg.over Kumirdaha | JUL-57 JUN-61 | 0.64 0.64 | CHAPAI NAWABGANJ | SHIBGANJ | Chapainawabganj-1 | Completed | |
| DRAINAGE | Re-ex.of Ghugudaha & Baragram | JUL-53 JUN-61 | 2.22 2.63 | PABNA | SANTHIA | Pabna-1 | Completed | |
| DRAINAGE | Re-ex. from Taltala to Kumar R | JUL-59 JUN-61 | 2.96 1.72 | FARIDPUR | NAGARKANDA | Faridpur-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Yarpur Danra Project | JUL-56 JUN-62 | 2.03 2.15 | NATORE | NATORE SADAR | Natore-2 | Completed | |
| DRAINAGE | Reclamation of Nimaichara Beel | JUL-53 JUN-62 | 11.71 16.76 | NATORE, PABNA | BARAIGRAM, CHATMOHAR | Natore-4, Pabna-3 | Completed | |
| DRAINAGE | Re-ex.of Fatiker khal | JUL-56 JUN-62 | 2.87 1.14 | FARIDPUR | NAGARKANDA | Faridpur-2 | Completed | |
| DRAINAGE AND IRRIGATION | Umakhali Rajarkul Dr. Scheme | JUL-56 JUN-63 | 4.48 4.48 | COX'S BAZAR | RAMU | Cox's Bazar-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Bhatia Beel Drainage Project | JUL-53 JUN-63 | 6.10 5.34 | CHAPAI NAWABGANJ | SHIBGANJ | Chapainawabganj-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Lamargari Baniakhola Dr.scheme | JUL-56 JUN-63 | 3.23 4.71 | NATORE | NATORE SADAR | Natore-2 | Completed | |
| DRAINAGE | Re-excav.of Jafar Khal | JUL-59 JUN-63 | 13.86 8.70 | BRAHMANBARIA | SARAIL | Brahmanbaria-2 | Completed | |
| FLOOD CONTROL | Strengthen.of R&L bank, GumtiR | JUL-56 JUN-63 | 32.61 37.62 | CUMILLA | BURICHANG, CUMILLA ADARSHA SADAR | Cumilla-5, Cumilla-6 | Completed | |
| DRAINAGE | Re-ex.of Dikshi Beel Project | JUL-59 JUN-63 | 2.83 2.86 | PABNA | CHATMOHAR | Pabna-3 | Completed | |
| IRRIGATION | Dhurang Irrigation Project | JUL-53 JUN-63 | 14.96 14.64 | CHATTOGRAM | FATIKCHHARI | Chattogram-2 | Completed | |
| IRRIGATION | GW Dev.& Low Lift Pump | JUL-60 JUN-63 | 37.51 37.51 | CHAPAI NAWABGANJ, NATORE, RAJSHAHI | BAGATIPARA, BARAIGRAM, CHAPAI NABABGANJ SADAR, GODAGARI, GOMASTAPUR, GURUDASPUR, NACHOLE, PABA, SHIBGANJ | Chapainawabganj-1, Chapainawabganj-2, Chapainawabganj-3, Natore-1, Natore-4, Rajshahi-1, Rajshahi-3 | Completed | |
| DRAINAGE AND IRRIGATION | Re-ex.ofGhungurShalda&Burinadi | JUL-57 JUN-64 | 68.05 52.30 | BRAHMANBARIA, CUMILLA | BRAHMANBARIA SADAR, BURICHANG, KASBA | Brahmanbaria-3, Brahmanbaria-4, Cumilla-5 | Completed | |
| IRRIGATION | Golabari Irr.& Navigation Proj | JUN-64 | 0.00 0.00 | GOPALGANJ | GOPALGANJ SADAR | Gopalganj-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Re-ex.of Chakal Tanmari& Laxmi | JUL-58 JUN-64 | 3.53 2.12 | NATORE | GURUDASPUR | Natore-4 | Completed | |
| DRAINAGE | Improvement of Nalia River | JUL-51 JUN-64 | 5.40 8.61 | GAIBANDHA | PALASHBARI | Gaibandha-3 | Completed | |
| DRAINAGE | Re-ex.of Beduria khal | JUL-52 JUN-65 | 2.29 2.21 | BARISHAL | BARISHAL SADAR (KOTWALI) | Barishal-5 | Completed | |
| DRAINAGE | Sonapatalia Beel Drainage | JUL-59 JUN-65 | 0.74 0.36 | KUSHTIA | KUSHTIA SADAR | Kushtia-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Lock cum Reg. over Salna River | JUL-56 JUN-65 | 2.72 2.22 | RAJBARI | PANGSHA | Rajbari-2 | Completed | |
| IRRIGATION | 10 nos LLP in Rangpur&Kurigram | JUL-61 JUN-65 | 208.75 208.75 | LALMONIRHAT, NILPHAMARI | KALIGANJ, SAIDPUR | Lalmonirhat-2, Nilphamari-4 | Completed | |
| IRRIGATION | LLP in Bogra,Dinajpur,Joypurht | JUL-62 JUN-65 | 30.24 30.24 | BOGURA, DINAJPUR, GAIBANDHA, JOYPURHAT | AKKELPUR, GABTALI, GHORAGHAT, GOBINDAGANJ, KHETLAL, PANCHBIBI, SUNDARGANJ | Bogura-7, Dinajpur-6, Gaibandha-1, Gaibandha-4, Joypurhat-1, Joypurhat-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder No.63/1A | JUN-65 | 268.22 268.22 | CHATTOGRAM | ANOWARA | Chattogram-13 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-4 | JUN-65 | 148.59 148.59 | SATKHIRA | ASSASUNI, KALIGANJ | Satkhira-3, Satkhira-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-1 | JUN-65 | 542.90 542.90 | SATKHIRA | ASSASUNI, DEBHATA | Satkhira-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-2 | JUN-65 | 162.87 162.87 | SATKHIRA | ASSASUNI, SATKHIRA SADAR | Satkhira-2, Satkhira-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-23 | JUN-65 | 56.39 56.39 | KHULNA | PAIKGACHHA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-34/1 | JUN-65 | 45.18 45.18 | BAGERHAT | BAGERHAT SADAR | Bagerhat-2 | Completed | |
| DRAINAGE | Re-ex.of Kodaldaha Canal | JUL-55 JUN-66 | 0.76 0.54 | BARISHAL | GAURNADI | Barishal-1 | Completed | |
| DRAINAGE | Re-ex.of Pinglakati Canal | JUL-55 JUN-66 | 1.68 1.16 | BARISHAL | GAURNADI | Barishal-1 | Completed | |
| DRAINAGE | Dredging of Gumti River | JUL-55 JUN-66 | 116.19 165.70 | CUMILLA | BURICHANG, CUMILLA ADARSHA SADAR | Cumilla-5, Cumilla-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-27/1 | JUN-66 | 103.60 103.60 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-15 | JUN-66 | 65.64 65.64 | SATKHIRA | SHYAMNAGAR | Satkhira-4 | Completed | |
| FLOOD CONTROL | Polder-14/1 | JUN-66 | 78.90 78.90 | KHULNA | KOYRA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-47/1 | JUN-66 | 62.00 62.00 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-47/2 | JUN-66 | 30.56 30.56 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-41/7 | JUN-66 | 13.46 13.46 | BARGUNA | BARGUNA SADAR | Barguna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-41/5 | JUN-66 | 33.94 33.94 | BARGUNA | BARGUNA SADAR | Barguna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-42 | JUN-66 | 49.46 49.46 | BARGUNA | BARGUNA SADAR | Barguna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-40/1 | JUN-66 | 81.77 81.77 | BARGUNA | PATHARGHATA | Barguna-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-40/2 | JUN-66 | 114.97 114.97 | BARGUNA | PATHARGHATA | Barguna-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-41/2 | JUN-66 | 134.49 134.49 | BARGUNA | BARGUNA SADAR | Barguna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-41/3 | JUN-66 | 20.39 20.39 | BARGUNA | BARGUNA SADAR | Barguna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-69 | JUN-66 | 32.75 32.75 | COX'S BAZAR | MAHESHKHALI | Cox's Bazar-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-70 | JUN-66 | 101.28 101.28 | COX'S BAZAR | CHAKARIA | Cox's Bazar-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-71 | JUN-66 | 104.23 104.23 | COX'S BAZAR | KUTUBDIA | Cox's Bazar-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-32 | JUN-66 | 131.05 131.05 | KHULNA | DACOPE | Khulna-1 | Completed | |
| FLOOD CONTROL | Polder-47/3 | JUN-66 | 41.83 41.83 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-47/5 | JUN-66 | 84.95 84.95 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-47/4 | JUN-66 | 134.14 134.14 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-46 | JUN-66 | 119.42 119.42 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-64/2B | JUN-66 | 159.88 159.88 | COX'S BAZAR | CHAKARIA | Cox's Bazar-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-65(Dutch) | JUN-66 | 77.34 77.34 | COX'S BAZAR | CHAKARIA | Cox's Bazar-1 | Completed | |
| DRAINAGE | Compre.Dr.sc.for Faridpur Dist | JUL-56 JUN-67 | 435.00 418.73 | FARIDPUR, GOPALGANJ, RAJBARI | ALFADANGA, BALIAKANDI, BHANGA, BOALMARI, FARIDPUR SADAR, GOPALGANJ SADAR, KASHIANI, PANGSHA | Faridpur-1, Faridpur-3, Faridpur-4, Gopalganj-2, Rajbari-2 | Completed | |
| DRAINAGE | Re-ex.of Gabbaria canal | JUL-60 JUN-67 | 0.45 0.56 | BARISHAL | WAZIRPUR | Barishal-2 | Completed | |
| DRAINAGE | Re-ex.of Sachia-Mithakur canal | JUL-55 JUN-67 | 2.40 1.66 | PIROJPUR | NAZIRPUR | Pirojpur-1 | Completed | |
| DRAINAGE | Re-ex.of Chakhar-Chaulakathi | JUL-57 JUN-67 | 1.58 1.59 | BARISHAL | BANARIPARA, WAZIRPUR | Barishal-2 | Completed | |
| DRAINAGE | Re-ex.of Bamrail Canal | JUL-57 JUN-67 | 1.40 1.46 | BARISHAL | WAZIRPUR | Barishal-2 | Completed | |
| DRAINAGE | Re-ex.of Katipara Kowklim canl | JUL-55 JUN-67 | 0.81 0.73 | JHALOKATHI | NALCHITY | Jhalokathi-2 | Completed | |
| DRAINAGE | Re-ex.of Rakudia canal | JUL-59 JUN-67 | 0.42 0.68 | BARISHAL | BABUGANJ | Barishal-3 | Completed | |
| DRAINAGE | Re-ex.of Chatrakanda canal | JUL-59 JUN-67 | 1.19 1.76 | JHALOKATHI | JHALOKATI SADAR | Jhalokathi-2 | Completed | |
| DRAINAGE | Re-ex.of Chatalbari canal | JUL-59 JUN-67 | 0.49 0.39 | BARISHAL | WAZIRPUR | Barishal-2 | Completed | |
| DRAINAGE | Re-ex.of Manpasha Latimshar | JUL-55 JUN-67 | 3.57 4.21 | JHALOKATHI | JHALOKATI SADAR | Jhalokathi-2 | Completed | |
| DRAINAGE | Re-ex.of Doarika canal | JUL-59 JUN-67 | 2.69 1.97 | BARISHAL | BARISHAL SADAR (KOTWALI) | Barishal-5 | Completed | |
| DRAINAGE | Re-ex.of Rajapur Gopalpur canl | JUL-56 JUN-67 | 0.99 1.13 | JHALOKATHI | RAJAPUR | Jhalokathi-1 | Completed | |
| DRAINAGE | Re-ex.of Charmuddin canal | JUL-57 JUN-67 | 1.23 1.05 | BARISHAL | BARISHAL SADAR (KOTWALI) | Barishal-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-3 | JUN-67 | 233.73 233.73 | SATKHIRA | DEBHATA, KALIGANJ | Satkhira-3, Satkhira-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-64/1A | JUN-67 | 345.73 345.73 | CHATTOGRAM | BANSHKHALI | Chattogram-16 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-64/1B | JUN-67 | 253.77 253.77 | CHATTOGRAM | BANSHKHALI | Chattogram-16 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-64/1C | JUN-67 | 111.66 111.66 | CHATTOGRAM | BANSHKHALI | Chattogram-16 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-16 | JUN-67 | 113.90 113.90 | KHULNA | PAIKGACHHA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-64/2A | JUN-67 | 100.00 100.00 | COX'S BAZAR | CHAKARIA | Cox's Bazar-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-45 | JUN-67 | 80.86 80.86 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-48 | JUN-67 | 134.14 134.14 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-35/1 | JUN-67 | 537.19 537.19 | BAGERHAT | MORRELGANJ, SARANKHOLA | Bagerhat-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-41/1 | JUN-67 | 59.70 59.70 | BARGUNA | PATHARGHATA | Barguna-2 | Completed | |
| IRRIGATION | GWD & LLP in Northern District | JUL-60 JUN-68 | 1,346.38 1,623.50 | DINAJPUR, PANCHAGARH, THAKURGAON | BALIADANGI, BIRAL, BIRGANJ, BODA, CHIRIRBANDAR, DINAJPUR SADAR, KAHAROLE, TENTULIA, THAKURGAON SADAR | Dinajpur-1, Dinajpur-2, Dinajpur-3, Dinajpur-4, Panchagarh-1, Panchagarh-2, Thakurgaon-1, Thakurgaon-2 | Completed | |
| DRAINAGE AND IRRIGATION | Improv.of Gazaria Ichamati Riv | JUL-61 JUN-68 | 43.18 39.97 | BOGURA | GABTALI | Bogura-7 | Completed | |
| DRAINAGE AND IRRIGATION | Imp.of Old Dakatia&Little Feni | JUL-57 JUN-68 | 297.00 318.59 | CUMILLA, FENI | CHAUDDAGRAM, SONAGAZI | Cumilla-11, Feni-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Dhaka-Narayanganj-Demra (DND) Irrigation Project | JUL-61 JUN-68 | 229.21 276.88 | DHAKA, NARAYANGANJ | DEMRA, NARAYANGANJ SADAR | Dhaka-5, Narayanganj-5 | Completed | Download |
| DRAINAGE | Excav.of Jalkachtra Beel Proj. | JUL-57 JUN-68 | 3.36 4.68 | PABNA | ATGHARIA | Pabna-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-72 | JUN-68 | 450.59 450.59 | CHATTOGRAM | SANDWIP | Chattogram-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-18/19 | JUN-68 | 61.45 61.45 | KHULNA | PAIKGACHHA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-77/1 | JUN-68 | 107.21 107.21 | SATKHIRA | ASSASUNI, SHYAMNAGAR | Satkhira-3, Satkhira-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-66/1 | JUN-68 | 47.75 47.75 | COX'S BAZAR | RAMU | Cox's Bazar-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-66/2 | JUN-68 | 27.85 27.85 | COX'S BAZAR | COX'S BAZAR SADAR | Cox's Bazar-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-25 | JUN-68 | 174.70 174.70 | KHULNA | DAULATPUR, DUMURIA | Khulna-3, Khulna-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Constn.of Bhatiapara Reg.& Emb | JUL-55 JUN-69 | 6.91 0.09 | GOPALGANJ | KASHIANI | Gopalganj-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-66/3 | JUN-69 | 48.55 48.55 | COX'S BAZAR | COX'S BAZAR SADAR | Cox's Bazar-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-67 | JUN-69 | 42.59 42.59 | COX'S BAZAR | TEKNAF | Cox's Bazar-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-68 | JUN-69 | 89.62 89.62 | COX'S BAZAR | TEKNAF | Cox's Bazar-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-10/12 | JUN-69 | 112.20 112.20 | KHULNA | DACOPE, KOYRA | Khulna-1, Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-61/1 | JUN-69 | 249.60 249.60 | CHATTOGRAM | SITAKUNDA | Chattogram-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Fld.Emb.on R/B of Brahmaputra | JUL-63 JUN-70 | 638.34 789.54 | BOGURA, GAIBANDHA, SIRAJGANJ | BOGURA SADAR, GABTALI, GAIBANDHA SADAR, GOBINDAGANJ, ROYGANJ, SARIAKANDI, SHERPUR, SIRAJGANJ SADAR, SUNDARGANJ | Bogura-1, Bogura-5, Bogura-6, Bogura-7, Gaibandha-1, Gaibandha-2, Gaibandha-4, Sirajganj-2, Sirajganj-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-7/2 | JUN-70 | 98.07 98.07 | SATKHIRA | ASSASUNI, SHYAMNAGAR | Satkhira-3, Satkhira-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-29 | JUN-71 | 160.43 160.43 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-59/1A | JUN-71 | 138.76 138.76 | NOAKHALI | COMPANIGANJ, NOAKHALI SADAR | Noakhali-4, Noakhali-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-59/1B | JUN-71 | 89.51 89.51 | NOAKHALI | NOAKHALI SADAR | Noakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-59/2 | JUN-71 | 0.00 0.00 | LAKSHMIPUR | LAKSHMIPUR SADAR, RAMGATI | Lakshmipur-3, Lakshmipur-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-60 | JUN-71 | 125.38 125.38 | FENI | SONAGAZI | Feni-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-73/1A and 73/1B | JUN-71 | 603.42 603.42 | NOAKHALI | HATIYA | Noakhali-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-73/2 | JUN-71 | 76.79 76.79 | NOAKHALI | HATIYA | Noakhali-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-28/1 | JUN-71 | 44.19 44.19 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-36/1 | JUN-71 | 376.20 376.20 | BAGERHAT, KHULNA | CHITALMARI, FAKIRHAT, MOLLAHAT, RUPSA | Bagerhat-1, Khulna-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-21 | JUN-72 | 37.61 37.61 | KHULNA | PAIKGACHHA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-9 | JUN-72 | 20.87 20.87 | KHULNA | PAIKGACHHA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-30 | JUN-72 | 122.56 122.56 | KHULNA | BATIAGHATA | Khulna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-17/1 | JUN-72 | 120.34 120.34 | KHULNA | DUMURIA, PAIKGACHHA | Khulna-5, Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-20 | JUN-72 | 75.88 75.88 | KHULNA | PAIKGACHHA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-33 | JUN-72 | 125.47 125.47 | KHULNA | DACOPE | Khulna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-31 | JUN-72 | 173.65 173.65 | KHULNA | BATIAGHATA | Khulna-1 | Completed | |
| FLOOD CONTROL | Mobarak Bundh | JUL-71 JUN-72 | 4.36 4.36 | KUSHTIA | MIRPUR | Kushtia-2 | Completed | |
| DRAINAGE | Re-ex.of Mouza Banal khal | JUL-56 JUN-73 | 2.64 2.64 | DHAKA | DHAMRAI | Dhaka-20 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-13-14/2 | JUN-73 | 184.08 184.08 | KHULNA | KOYRA | Khulna-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-6-8 | JUN-74 | 155.01 155.01 | SATKHIRA | ASSASUNI, SATKHIRA SADAR, TALA | Satkhira-1, Satkhira-2, Satkhira-3 | Completed | |
| DRAINAGE | Re-ex.of Puinta Araibaki khals | JUL-69 JUN-75 | 6.84 12.79 | BARISHAL | BAKERGANJ | Barishal-6 | Completed | |
| FLOOD CONTROL | Donamata Closure (Dutch) | JUL-74 JUN-76 | 4.67 4.67 | KHULNA | PAIKGACHHA | Khulna-6 | Completed | |
| IRRIGATION | Sundalpur Irrigation Project | JUL-72 JUN-76 | 8.54 17.45 | CUMILLA | DAUDKANDI | Cumilla-1 | Completed | |
| DRAINAGE | Re-ex.from Gopalganj to Ghagor | JUL-61 JUN-76 | 10.50 3.11 | BARISHAL, GOPALGANJ | GAURNADI, GOPALGANJ SADAR, KOTALIPARA | Barishal-1, Gopalganj-2, Gopalganj-3 | Completed | |
| DRAINAGE | Re-ex.of Barai khali khal | JUL-74 JUN-76 | 32.90 27.04 | KISHOREGANJ, MYMENSINGH | HOSSAINPUR, NANDAIL | Kishoreganj-1, Mymensingh-9 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-28/2 | JUN-76 | 115.30 115.30 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL | Emb.along the W/B ofPunarbhaba | JUL-73 JUN-77 | 42.00 16.40 | DINAJPUR | BIRAL | Dinajpur-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Flood emb. & Reg. at Jotebazar | JUL-70 JUN-77 | 9.75 9.75 | NAOGAON | MANDA | Naogaon-4 | Completed | |
| IRRIGATION | Chandana Barashia(Dutch) | JUN-77 | 70.50 70.50 | Completed | ||||
| DRAINAGE | Imp.of GoriadahaBeel Dr Scheme | JUL-56 JUN-77 | 20.12 7.03 | FARIDPUR | MADHUKHALI | Faridpur-1 | Completed | |
| DRAINAGE | Re-ex.of Dewankhali khal | JUL-53 JUN-77 | 22.99 3.06 | NARSINGDI | SHIBPUR | Narsingdi-3 | Completed | |
| DRAINAGE | Imp.of Beel Baghil & Other | JUL-74 JUN-77 | 5.87 5.48 | DHAKA | SAVAR | Dhaka-19 | Completed | |
| IRRIGATION | Marichar Dhanra Irrgn.Project | JUL-69 JUN-77 | 45.99 45.99 | CHAPAI NAWABGANJ | CHAPAI NABABGANJ SADAR, SHIBGANJ | Chapainawabganj-1, Chapainawabganj-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Dev.of Karnahar Bara Beel | JUL-63 JUN-77 | 80.53 62.16 | RAJSHAHI | PABA, TANORE | Rajshahi-1, Rajshahi-3 | Completed | |
| DRAINAGE | Re-ex.from Mustafapur-Ghagor | JUL-61 JUN-77 | 36.48 6.34 | BARISHAL, GOPALGANJ, MADARIPUR | GAURNADI, KALKINI, KOTALIPARA, MADARIPUR SADAR, RAJOIR | Barishal-1, Gopalganj-3, Madaripur-2, Madaripur-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Constn.of Regulator at Bisha | JUL-69 JUN-77 | 6.95 7.23 | NAOGAON | ATRAI | Naogaon-6 | Completed | |
| DRAINAGE | Improvement of Naragati khal | JUL-57 JUN-77 | 12.70 13.36 | NARAIL | KALIA | Narail-1 | Completed | |
| DRAINAGE | Dredging of Gumti River | JUL-73 JUN-77 | 46.50 7.06 | CUMILLA | DAUDKANDI | Cumilla-1 | Completed | |
| FLOOD CONTROL | Imp.of mar.dyke along Kankri R | JUL-57 JUN-77 | 44.68 42.32 | CUMILLA | CHAUDDAGRAM | Cumilla-11 | Completed | |
| DRAINAGE | Comp.Dr.Sc.for Noakhali Sadar | JUL-60 JUN-77 | 533.20 533.20 | LAKSHMIPUR, NOAKHALI | BEGUMGANJ, LAKSHMIPUR SADAR | Lakshmipur-3, Noakhali-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-27/2 | JUN-77 | 83.23 83.23 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-55/1 | JUN-77 | 278.80 278.80 | PATUAKHALI | GALACHIPA | Patuakhali-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-54 | JUN-78 | 191.59 191.59 | PATUAKHALI | KALAPARA | Patuakhali-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-17/2 | JUN-78 | 118.06 118.06 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-44 | JUN-78 | 243.21 243.21 | BARGUNA | AMTALI | Barguna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-34 | JUN-78 | 96.46 96.46 | JASHORE | ABHAYNAGAR, KESHABPUR, MANIRAMPUR | Jashore-4, Jashore-5, Jashore-6 | Completed | |
| DRAINAGE AND IRRIGATION | Re-ex.of Jhingri River | JUL-74 JUN-78 | 11.72 52.75 | HABIGANJ | AJMIRIGANJ, BANIACHONG | Habiganj-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Sub-merged weir at Tangapara | JUL-76 JUN-78 | 46.63 38.77 | NETROKONA | MOHANGANJ | Netrokona-4 | Completed | |
| DRAINAGE | Imp.of Madhukhali Roypur Beel | JUL-72 JUN-78 | 15.66 7.22 | FARIDPUR | BOALMARI | Faridpur-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | FC Emb.at Alfadanga & Boalmari | JUL-61 JUN-78 | 66.89 20.88 | FARIDPUR | ALFADANGA, BOALMARI | Faridpur-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Dhankunia Haor | JUL-63 JUN-78 | 7.26 10.57 | SUNAMGANJ | DHARAMPASHA | Sunamganj-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Halir Haor | JUL-71 JUN-78 | 49.26 49.26 | SUNAMGANJ | JAMALGANJ | Sunamganj-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Paganer Haor | JUL-76 JUN-78 | 17.98 17.98 | SUNAMGANJ | JAMALGANJ | Sunamganj-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Karchar Haor | JUL-62 JUN-78 | 12.50 28.77 | SUNAMGANJ | SUNAMGANJ SADAR | Sunamganj-4 | Completed | |
| DRAINAGE | Re-ex.of Rijna & Sonai River | JUL-73 JUN-78 | 64.35 30.83 | BRAHMANBARIA | KASBA | Brahmanbaria-4 | Completed | |
| DRAINAGE | Re-ex.of Khirai River&Branches | JUL-73 JUN-78 | 48.56 67.35 | CUMILLA | DAUDKANDI | Cumilla-1 | Completed | |
| DRAINAGE | Imp.of Gograjala & Bail khal | JUL-75 JUN-78 | 81.57 13.00 | CHANDPUR, CUMILLA | CHANDINA, DAUDKANDI, KACHUA | Chandpur-1, Cumilla-1, Cumilla-7 | Completed | |
| DRAINAGE | Re-ex.of Rajar Khal | JUL-73 JUN-78 | 43.80 29.96 | BRAHMANBARIA | KASBA | Brahmanbaria-4 | Completed | |
| DRAINAGE | Imp.of Sapla & Akashi Beel | JUL-73 JUN-78 | 13.77 7.44 | BRAHMANBARIA | NASIRNAGAR, SARAIL | Brahmanbaria-1, Brahmanbaria-2 | Completed | |
| DRAINAGE | Re-ex.of Roachala& Archi River | JUL-75 JUN-78 | 59.87 57.78 | CUMILLA | MURADNAGAR | Cumilla-3 | Completed | |
| IRRIGATION | Bulli Bundh Irrigation Project | JUL-73 JUN-78 | 38.22 17.17 | THAKURGAON | THAKURGAON SADAR | Thakurgaon-1 | Completed | |
| DRAINAGE | Re-ex.from Somespur to Chiknai | JUL-74 JUN-78 | 39.84 42.00 | PABNA | ATGHARIA, PABNA SADAR | Pabna-4, Pabna-5 | Completed | |
| IRRIGATION | Imp.of Nabinagar Dattakhola Kh | JUL-73 JUN-78 | 24.48 15.19 | BRAHMANBARIA | BRAHMANBARIA SADAR | Brahmanbaria-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Sonamukhi Banmandar Dr.scheme | JUL-70 JUN-78 | 148.03 139.83 | JASHORE | JHIKARGACHHA, SHARSHA | Jashore-1, Jashore-2 | Completed | |
| DRAINAGE | Re-ex.of Batkazal khal | JUL-75 JUN-78 | 28.68 26.80 | PATUAKHALI | BAUPHAL | Patuakhali-2 | Completed | |
| IRRIGATION | Pratappur Irrigation Project | JUL-74 JUN-78 | 43.39 43.97 | BOGURA | KAHALOO | Bogura-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Repairing of Hizla Embankment | JUL-74 JUN-79 | 62.31 62.15 | BARISHAL | HIZLA | Barishal-4 | Completed | |
| DRAINAGE | Re-ex.of Harin Khola khal | JUL-78 JUN-79 | 1.31 1.20 | SATKHIRA | TALA | Satkhira-1 | Completed | |
| DRAINAGE | Re-ex.of Singua River | JUL-76 JUN-79 | 49.26 49.26 | KISHOREGANJ | KATIADI, PAKUNDIA | Kishoreganj-2 | Completed | |
| DRAINAGE | Re-ex.ofLashghata Nalgora khal | JUL-76 JUN-79 | 57.39 56.20 | BARISHAL | BABUGANJ, GAURNADI | Barishal-1, Barishal-3 | Completed | |
| DRAINAGE | Re-ex.of Pangsi River | JUL-78 JUN-79 | 1.56 0.23 | KUSHTIA | MIRPUR | Kushtia-2 | Completed | |
| IRRIGATION | Re-ex.of Singua River | JUL-73 JUN-79 | 46.14 46.14 | KISHOREGANJ | KATIADI | Kishoreganj-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Chaptir Haor | JUN-79 | 34.99 34.99 | SUNAMGANJ | DERAI | Sunamganj-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Kalnar Haor | JUN-79 | 33.88 33.88 | SUNAMGANJ | SUNAMGANJ SADAR | Sunamganj-4 | Completed | |
| FLOOD CONTROL | Pathakhali Konai beel scheme | JUL-77 JUN-79 | 40.26 40.26 | TANGAIL | MIRZAPUR | Tangail-7 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Matin Haor | JUN-79 | 10.89 10.89 | SUNAMGANJ | TAHIRPUR | Sunamganj-1 | Completed | |
| DRAINAGE | Re-ex.of Barisal khal | JUL-77 JUN-79 | 5.46 4.05 | KUSHTIA | KUSHTIA SADAR | Kushtia-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Re-ex.of Dardaria khal | JUL-62 JUN-79 | 40.68 39.35 | GAZIPUR | KAPASIA | Gazipur-4 | Completed | |
| IRRIGATION | Con.of Reg.over Gobakhali khal | JUL-76 JUN-79 | 24.05 24.05 | JAMALPUR | JAMALPUR SADAR | Jamalpur-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-56/57 | JUN-79 | 1,135.58 1,135.58 | BHOLA | BHOLA SADAR, CHAR FASSON, DAULAT KHAN, LALMOHAN | Bhola-1, Bhola-2, Bhola-3, Bhola-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-39/1 | JUN-79 | 328.14 328.14 | BARGUNA | PATHARGHATA | Barguna-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Sanir Haor | JUN-80 | 85.72 85.72 | SUNAMGANJ | JAMALGANJ, TAHIRPUR | Sunamganj-1 | Completed | |
| IRRIGATION | Re-ex.of Sautikanda Dr. khal | JUL-75 JUN-80 | 37.57 9.84 | FARIDPUR | BHANGA | Faridpur-4 | Completed | |
| IRRIGATION | Barisal Irrign.Proj. Phase-1 | JUL-75 JUN-80 | 3,752.00 3,752.00 | BARISHAL | BARISHAL SADAR (KOTWALI) | Barishal-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-26 (Dutch) | JUL-77 JUN-80 | 46.49 45.37 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Raktadaha Lohachura beel | JUL-70 JUN-80 | 193.40 189.13 | BOGURA, NAOGAON | ADAMDIGHI, ATRAI, RANINAGAR | Bogura-3, Naogaon-6 | Completed | |
| DRAINAGE | Re-ex.of Kalaya Nehalganj khal | JUL-78 JUN-80 | 63.60 65.41 | PATUAKHALI | BAUPHAL | Patuakhali-2 | Completed | |
| DRAINAGE | Re-ex.of Padri Sibpur khal | JUL-78 JUN-80 | 41.68 41.67 | BARISHAL | BAKERGANJ | Barishal-6 | Completed | |
| DRAINAGE | Putia & other beel Dr. scheme | JUL-78 JUN-80 | 18.00 13.63 | JHENAIDAH | JHENAIDAH SADAR | Jhenaidah-2 | Completed | |
| DRAINAGE | Madia & other beel Dr. scheme | JUL-77 JUN-80 | 13.32 9.61 | JASHORE | JASHORE SADAR | Jashore-3 | Completed | |
| DRAINAGE | Regulator over Noakhali khal | JUL-78 JUN-80 | 18.07 9.28 | SATKHIRA | KALAROA | Satkhira-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Sarigoyan Project | JUL-72 JUN-80 | 365.99 270.64 | SYLHET | JAINTIAPUR | Sylhet-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Regulator over Betna River | JUL-78 JUN-80 | 31.50 27.50 | JASHORE | SHARSHA | Jashore-1 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Chandpur Irrigation Project | JUL-62 JUN-80 | 5,430.00 5,419.34 | CHANDPUR, LAKSHMIPUR | CHANDPUR SADAR, FARIDGANJ, HAIM CHAR, LAKSHMIPUR SADAR, RAMGANJ, ROYPUR | Chandpur-3, Chandpur-4, Lakshmipur-1, Lakshmipur-2, Lakshmipur-3 | Completed | |
| DRAINAGE | Regulator over Bhangra khal | JUL-77 JUN-80 | 9.35 9.19 | SATKHIRA | SATKHIRA SADAR | Satkhira-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Drainage of Tala beel | JUL-78 JUN-80 | 43.18 57.98 | SATKHIRA | TALA | Satkhira-1 | Completed | |
| FLOOD CONTROL | Imp.of Bhitabari Damoah beel | JUL-78 JUN-80 | 66.48 70.60 | CHAPAI NAWABGANJ | GOMASTAPUR, NACHOLE | Chapainawabganj-2 | Completed | |
| DRAINAGE | Dev.of Gangnai River | JUL-77 JUN-80 | 36.07 49.37 | BOGURA | SHIBGANJ | Bogura-2 | Completed | |
| DRAINAGE | Chiknai-Ghechua bundh | JUL-71 JUN-80 | 90.21 85.94 | PABNA | FARIDPUR | Pabna-3 | Completed | |
| DRAINAGE | Re-ex.of D-7 G.K. khal | JUL-77 JUN-80 | 17.24 11.36 | KUSHTIA | BHERAMARA, MIRPUR | Kushtia-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Kulia Patharghata Dr. scheme | JUL-78 JUN-80 | 29.27 23.86 | NARAIL | NARAIL SADAR | Narail-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Garalia Beel Regulator | JUL-78 JUN-80 | 18.00 23.44 | JASHORE | KESHABPUR | Jashore-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-43/1 | JUN-80 | 169.07 169.07 | BARGUNA | AMTALI | Barguna-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Reg.over Dhalgram Bara khal | JUL-79 JUN-81 | 26.66 21.83 | JASHORE | BAGHER PARA | Jashore-4 | Completed | |
| DRAINAGE | Re-excav.of Sikder Mallick Kh. | JUL-74 JUN-81 | 31.11 31.09 | PIROJPUR | PIROJPUR SADAR | Pirojpur-1 | Completed | |
| DRAINAGE | Kapatakhi Salikha Scheme | JUL-79 JUN-81 | 77.11 84.04 | SATKHIRA | TALA | Satkhira-1 | Completed | |
| DRAINAGE | Regulato at Hashemdia | JUL-70 JUN-81 | 68.89 47.93 | FARIDPUR | BHANGA | Faridpur-4 | Completed | |
| DRAINAGE | Re-ex.of Tulbaria Khal | JUL-78 JUN-81 | 16.80 6.16 | KUSHTIA | DAULATPUR | Kushtia-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Imp.of Kushiyara Bardal | JUL-70 JUN-81 | 42.80 34.29 | SYLHET | BEANI BAZAR | Sylhet-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Reg.over Bara Khudra khal | JUL-79 JUN-81 | 8.34 11.85 | JASHORE | BAGHER PARA | Jashore-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Dr.Scheme Makla & Other beels | JUL-78 JUN-81 | 13.52 14.15 | JASHORE | SHARSHA | Jashore-1 | Completed | |
| IRRIGATION | Re-constn. of Buri Bundh | JUL-75 JUN-81 | 111.17 103.46 | THAKURGAON | THAKURGAON SADAR | Thakurgaon-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Tarail Pachuria Project | JUL-74 JUN-81 | 802.21 243.23 | GOPALGANJ | GOPALGANJ SADAR | Gopalganj-2 | Completed | |
| FLOOD CONTROL | Chakamaya Panchakurulia closur | JUL-80 JUN-81 | 108.57 108.57 | BARGUNA, PATUAKHALI | AMTALI, KALAPARA | Barguna-1, Patuakhali-4 | Completed | |
| IRRIGATION | Kazipur bridge over Subil khal | JUL-80 JUN-81 | 0.67 0.65 | BOGURA | BOGURA SADAR | Bogura-6 | Completed | |
| IRRIGATION | Over Batkamari Khalider khal | JUL-80 JUN-81 | 0.43 0.43 | BOGURA | SHIBGANJ | Bogura-2 | Completed | |
| IRRIGATION | At Belahati over Iramatikhari | JUL-80 JUN-81 | 3.89 3.40 | BOGURA | DHUPCHANCHIA | Bogura-3 | Completed | |
| IRRIGATION | At Sonakania over Dublagari | JUL-80 JUN-81 | 2.78 2.70 | BOGURA | SHERPUR | Bogura-5 | Completed | |
| IRRIGATION | At Rathuabari | JUL-80 JUN-81 | 3.07 2.95 | BOGURA | DHUNAT | Bogura-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | At sibbati over Subil canal | JUL-80 JUN-81 | 2.44 2.41 | BOGURA | BOGURA SADAR | Bogura-6 | Completed | |
| IRRIGATION | Slope over Dasbhanga canal | JUL-80 JUN-81 | 7.41 7.41 | PABNA | ISHWARDI | Pabna-4 | Completed | |
| IRRIGATION | Over StuartCanal atSindurkanta | JUL-80 JUN-81 | 5.18 4.34 | MEHERPUR | GANGNI | Meherpur-2 | Completed | |
| IRRIGATION | At Bharati over Sastioari | JUL-80 JUN-81 | 2.28 2.46 | MEHERPUR | GANGNI | Meherpur-2 | Completed | |
| IRRIGATION | At Pirtala over Pirtala canal | JUN-81 | 5.18 4.11 | MEHERPUR | GANGNI | Meherpur-2 | Completed | |
| IRRIGATION | At Taltala over Taltala canal | JUL-80 JUN-81 | 5.18 2.46 | MEHERPUR | GANGNI | Meherpur-2 | Completed | |
| IRRIGATION | At Kazipur over Kazipur canal | JUL-80 JUN-81 | 5.18 4.65 | MEHERPUR | GANGNI | Meherpur-2 | Completed | |
| IRRIGATION | At Pirpurghat overBhaimara can | JUL-80 JUN-81 | 1.59 1.42 | CHUADANGA | DAMURHUDA | Chuadanga-2 | Completed | |
| IRRIGATION | At Duliarpurghat over Bhaimara | JUL-80 JUN-81 | 1.59 1.59 | CHUADANGA | DAMURHUDA | Chuadanga-2 | Completed | |
| IRRIGATION | Over Jhapuachar | JUL-80 JUN-81 | 3.99 3.99 | COX'S BAZAR | MAHESHKHALI | Cox's Bazar-2 | Completed | |
| IRRIGATION | Over Khalaiar char | JUL-80 JUN-81 | 4.23 2.98 | COX'S BAZAR | MAHESHKHALI | Cox's Bazar-2 | Completed | |
| IRRIGATION | Over Zoaria Nala | JUL-80 JUN-81 | 13.89 9.85 | COX'S BAZAR | RAMU | Cox's Bazar-3 | Completed | |
| IRRIGATION | Over Guptachara | JUL-80 JUN-81 | 2.35 2.35 | CHATTOGRAM | SITAKUNDA | Chattogram-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Joydona Haor | JUN-82 | 0.00 0.00 | SUNAMGANJ | DHARAMPASHA | Sunamganj-1 | Completed | |
| DRAINAGE | Loop cutting of Gumti River | JUL-81 JUN-82 | 13.29 13.29 | CUMILLA | CUMILLA ADARSHA SADAR | Cumilla-6 | Completed | |
| DRAINAGE | Re-ex.of Naya Dakatia River | JUL-81 JUN-82 | 19.74 19.74 | CUMILLA | LAKSAM | Cumilla-9 | Completed | |
| DRAINAGE | Remov.of waterlogging at Rouha | JUL-77 JUN-82 | 105.52 105.52 | JAMALPUR | JAMALPUR SADAR | Jamalpur-5 | Completed | |
| FLOOD CONTROL | Embk.both bank of Selonia Rvr. | JUL-81 JUN-82 | 9.76 9.76 | FENI | PARSHURAM | Feni-1 | Completed | |
| FLOOD CONTROL | Embk.both bank of Kahua&Muhuri | JUL-81 JUN-82 | 51.40 51.40 | FENI | PARSHURAM | Feni-1 | Completed | |
| DRAINAGE | Padma beel Haor khali scheme | JUL-78 JUN-82 | 6.93 4.60 | MAGURA | MAGURA SADAR | Magura-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Nurania Detagram Beel | JUL-79 JUN-82 | 36.30 43.35 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| IRRIGATION | Batakandi Irrigation Project | JUL-73 JUN-82 | 116.87 96.03 | CUMILLA | DAUDKANDI | Cumilla-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Regulator over Janakipur khal | JUL-79 JUN-82 | 37.82 37.82 | SHERPUR | NAKLA | Sherpur-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of Boro of Lohalia Haor | JUL-80 JUN-82 | 19.00 19.00 | SUNAMGANJ | JAMALGANJ, TAHIRPUR | Sunamganj-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Prot.of Boro ofChandrasunar kh | JUN-82 | 18.83 18.83 | SUNAMGANJ | DHARAMPASHA | Sunamganj-1 | Completed | |
| DRAINAGE | Re-ex.of Archi River | JUL-81 JUN-82 | 17.99 17.99 | CUMILLA | MURADNAGAR | Cumilla-3 | Completed | |
| DRAINAGE | Re-ex.of Joytal Lopara khal | JUL-81 JUN-82 | 10.66 10.66 | BRAHMANBARIA | SARAIL | Brahmanbaria-2 | Completed | |
| IRRIGATION | Re-ex.of Ghagutia khal (Dutch) | JUL-77 JUN-82 | 27.78 17.34 | FARIDPUR | BHANGA, NAGARKANDA | Faridpur-2, Faridpur-4 | Completed | |
| IRRIGATION | Re-ex.of Jamuna from Aytala | JUL-78 JUN-82 | 161.28 140.36 | BRAHMANBARIA | NABINAGAR | Brahmanbaria-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Dev.of Faliar Beel(Dutch) | JUL-78 JUN-82 | 86.20 86.20 | RAJSHAHI | PABA | Rajshahi-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Sati Nadi Scheme | JUL-78 JUN-82 | 245.00 252.66 | LALMONIRHAT | KALIGANJ, LALMONIRHAT SADAR | Lalmonirhat-2, Lalmonirhat-3 | Completed | |
| FLOOD CONTROL | Teesta Right Flood Embankment | JUL-78 JUN-82 | 230.30 261.44 | NILPHAMARI, RANGPUR | DIMLA, GANGACHARA, JALDHAKA | Nilphamari-1, Nilphamari-3, Rangpur-1 | Completed | |
| FLOOD CONTROL | Road cum embkt.at Saheberhat | JUL-80 JUN-82 | 31.16 31.16 | LAKSHMIPUR, NOAKHALI | LAKSHMIPUR SADAR, NOAKHALI SADAR | Lakshmipur-3, Noakhali-4 | Completed | |
| FLOOD CONTROL | X-dam cum Embkt.at Kakashipur | JUL-80 JUN-82 | 20.57 20.57 | NOAKHALI | NOAKHALI SADAR | Noakhali-4 | Completed | |
| DRAINAGE | Re-ex.of Damudia River | JUL-81 JUN-82 | 19.74 19.74 | BRAHMANBARIA | NASIRNAGAR, SARAIL | Brahmanbaria-1, Brahmanbaria-2 | Completed | |
| DRAINAGE | Re-ex.of Salua & Satdona | JUL-81 JUN-82 | 6.83 6.83 | BRAHMANBARIA | BANCHHARAMPUR | Brahmanbaria-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Madaripur Beel Route | JUL-74 JUN-82 | 733.45 733.45 | GOPALGANJ, MADARIPUR | GOPALGANJ SADAR, KOTALIPARA, MUKSUDPUR, RAJOIR | Gopalganj-1, Gopalganj-2, Gopalganj-3, Madaripur-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder 34/3 (Dutch EIP) | JUL-78 JUN-82 | 107.61 135.63 | BAGERHAT | BAGERHAT SADAR | Bagerhat-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder-5 | JUN-82 | 680.71 680.71 | SATKHIRA | KALIGANJ, SHYAMNAGAR | Satkhira-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Outfall of Gachpara canal | JUL-80 JUN-82 | 6.29 0.00 | PABNA | ATGHARIA | Pabna-4 | Completed | |
| IRRIGATION | At Dibigram | JUL-81 JUN-82 | 6.51 6.51 | PABNA | CHATMOHAR | Pabna-3 | Completed | |
| IRRIGATION | Ratnai River near Garuri Bazar | JUL-80 JUN-82 | 19.30 19.30 | PABNA | CHATMOHAR | Pabna-3 | Completed | |
| IRRIGATION | At Bishan River | JUL-81 JUN-82 | 5.77 4.03 | KUSHTIA | DAULATPUR | Kushtia-1 | Completed | |
| IRRIGATION | Water Control Structures | JUL-80 JUN-82 | 126.13 152.44 | DINAJPUR, PANCHAGARH, THAKURGAON | BIRAL, BIRGANJ, CHIRIRBANDAR, HARIPUR, KAHAROLE, PANCHAGARH SADAR, PIRGANJ, THAKURGAON SADAR | Dinajpur-1, Dinajpur-2, Dinajpur-4, Panchagarh-1, Thakurgaon-1, Thakurgaon-2, Thakurgaon-3 | Completed | |
| IRRIGATION | At Rasikpur over Bhairab River | JUL-81 JUN-82 | 7.20 9.49 | MEHERPUR | MEHERPUR SADAR | Meherpur-1 | Completed | |
| IRRIGATION | At Rajnagar over Kajla River | JUL-81 JUN-82 | 4.26 5.55 | MEHERPUR | MEHERPUR SADAR | Meherpur-1 | Completed | |
| IRRIGATION | Over Muchikhali Canal | JUL-80 JUN-82 | 1.46 2.05 | MAGURA | MAGURA SADAR | Magura-1 | Completed | |
| IRRIGATION | Over Dariapur Canal | JUL-80 JUN-82 | 2.10 2.15 | MAGURA | MAGURA SADAR | Magura-1 | Completed | |
| IRRIGATION | Over Shirishkat Canal | JUL-81 JUN-82 | 1.81 1.58 | JHENAIDAH | JHENAIDAH SADAR | Jhenaidah-2 | Completed | |
| IRRIGATION | Over Sonaichara char | JUL-80 JUN-82 | 11.24 11.24 | KHAGRACHHARI | RAMGARH | Khagrachhari | Completed | |
| IRRIGATION | Over Dungichara | JUL-80 JUN-82 | 10.36 10.46 | CHATTOGRAM | RANGUNIA | Chattogram-7 | Completed | |
| IRRIGATION | Over Haor khali Canal | JUN-82 | 5.00 5.00 | MAGURA | MAGURA SADAR | Magura-1 | Completed | |
| IRRIGATION | Over Monaipara Canal | JUL-80 JUN-82 | 7.22 7.16 | RANGAMATI | KAWKHALI (BETBUNIA) | Rangamati | Completed | |
| IRRIGATION | Over Baramasi Modhuchara Canal | JUN-82 | 8.24 5.22 | FENI | CHHAGALNAIYA | Feni-1 | Completed | |
| DRAINAGE | Re-ex.of Kachua Anispur khal | JUL-81 JUN-83 | 10.17 10.17 | LAKSHMIPUR | RAMGANJ | Lakshmipur-1 | Completed | |
| DRAINAGE | Re-ex.of Farashganj khal | JUL-81 JUN-83 | 3.25 3.25 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| DRAINAGE | Re-ex.of Choumuhani Sattar Pia | JUL-81 JUN-83 | 3.21 3.21 | NOAKHALI | BEGUMGANJ | Noakhali-3 | Completed | |
| DRAINAGE | Re-ex.of Neamatpur khal | JUL-81 JUN-83 | 6.41 6.41 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| DRAINAGE | Re-ex.of Parbatinagar khal | JUL-81 JUN-83 | 6.57 6.57 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| DRAINAGE | Re-ex.of Noakhali khal,P-59/1B | JUL-82 JUN-83 | 95.55 95.55 | NOAKHALI | BEGUMGANJ, NOAKHALI SADAR | Noakhali-3, Noakhali-4 | Completed | |
| DRAINAGE | Re-ex.of JaksinDarbeshpur khal | JUL-81 JUN-83 | 23.07 23.07 | LAKSHMIPUR, NOAKHALI | CHATKHIL, LAKSHMIPUR SADAR | Lakshmipur-3, Noakhali-1 | Completed | |
| IRRIGATION | Brdg.cum Reg.over Bailgabakhal | JUL-81 JUN-83 | 25.48 25.48 | TANGAIL | GHATAIL | Tangail-3 | Completed | |
| IRRIGATION | Buri Teesta Irrigation Project | JUL-78 JUN-83 | 141.55 220.00 | NILPHAMARI | DIMLA, JALDHAKA, KISHOREGANJ | Nilphamari-1, Nilphamari-3, Nilphamari-4 | Completed | |
| DRAINAGE | Ramnagar Dr. & W.C.scheme | JUL-80 JUN-83 | 40.88 40.90 | RAJBARI | RAJBARI SADAR | Rajbari-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Jangal Beel Dr. & W.C.scheme | JUL-80 JUN-83 | 45.67 42.38 | RAJBARI | BALIAKANDI | Rajbari-2 | Completed | |
| DRAINAGE | Konagram Beel Dr. & W.C.scheme | JUN-83 | 19.09 19.09 | RAJBARI | BALIAKANDI | Rajbari-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Barnai salimpur Kolabasukhali | JUL-60 JUN-83 | 930.00 953.44 | KHULNA, NARAIL | DAULATPUR, KALIA, NARAIL SADAR, TEROKHADA | Khulna-3, Khulna-4, Khulna-5, Narail-1, Narail-2 | Completed | |
| FLOOD CONTROL | Gangrail Closure(Dutch) | JUL-81 JUN-83 | 106.44 95.46 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| FLOOD CONTROL | Embkt.from Ilsha to Bazipur | JUN-83 | 62.70 62.70 | BHOLA | BHOLA SADAR | Bhola-1 | Completed | |
| FLOOD CONTROL | Consn.of Konapara Embankment | JUL-80 JUN-83 | 94.59 83.11 | MYMENSINGH | HALUAGHAT | Mymensingh-1 | Completed | |
| IRRIGATION | Water Retn.stru.at Bangaonchar | JUL-81 JUN-83 | 9.06 9.06 | SUNAMGANJ | SUNAMGANJ SADAR | Sunamganj-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Bridge&Reg.over Katakhali khal | JUL-80 JUN-83 | 83.60 83.60 | JAMALPUR | SARISHABARI | Jamalpur-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Bridge&Reg.on Salimpur Karatia | JUL-82 JUN-83 | 63.58 63.58 | TANGAIL | TANGAIL SADAR | Tangail-5 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Manu River Project (Kuwait) | JUL-75 JUN-83 | 7,258.00 6,888.97 | MOULVIBAZAR | MAULVIBAZAR SADAR | Moulvibazar-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | G.K.Project (Phase-I & II) | JUL-60 JUN-83 | 5,088.90 8,280.00 | CHUADANGA, JHENAIDAH, KUSHTIA | ALAMDANGA, BHERAMARA, CHUADANGA SADAR, HARINAKUNDA, JHENAIDAH SADAR, KUMARKHALI, KUSHTIA SADAR, SHAILKUPA | Chuadanga-1, Jhenaidah-1, Jhenaidah-2, Kushtia-2, Kushtia-3, Kushtia-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Closure dam over Marapadma | JUL-82 JUN-83 | 54.58 54.58 | RAJBARI | GOALANDA | Rajbari-1 | Completed | |
| DRAINAGE | Re-ex.of Mrigi khal | JUN-83 | 29.11 29.11 | RAJBARI | BALIAKANDI, PANGSHA | Rajbari-2 | Completed | |
| TOWN PROTECTION | Prot.Goalundo Daulatdia ferry | JUL-82 JUN-83 | 54.58 24.12 | RAJBARI | GOALANDA | Rajbari-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Bridge cum Reg.over Noakhal | JUL-81 JUN-83 | 25.74 25.74 | TANGAIL | MADHUPUR | Tangail-1 | Completed | |
| FLOOD CONTROL | Regulator over Alalia Bahadia | JUL-81 JUN-83 | 21.77 21.77 | KISHOREGANJ | PAKUNDIA | Kishoreganj-2 | Completed | |
| IRRIGATION | IR&FC of Purulia Charbhatpara | JUL-81 JUN-83 | 89.57 48.89 | GOPALGANJ | KASHIANI | Gopalganj-2 | Completed | |
| DRAINAGE | Re-ex.of Bulbola khal | JUL-81 JUN-83 | 6.62 6.62 | FENI | DAGANBHUIYAN | Feni-3 | Completed | |
| FLOOD CONTROL | Extn.of Pathakhali Konai Beel | JUL-81 JUN-83 | 94.64 81.26 | TANGAIL | MIRZAPUR | Tangail-7 | Completed | |
| IRRIGATION | Over Ichamati Keshabpur | JUL-81 JUN-83 | 3.81 3.85 | CHATTOGRAM | SITAKUNDA | Chattogram-4 | Completed | |
| IRRIGATION | Khutakhali | JUL-81 JUN-83 | 19.24 19.24 | COX'S BAZAR | CHAKARIA | Cox's Bazar-1 | Completed | |
| IRRIGATION | At Barahaty over Harabati | JUL-81 JUN-83 | 3.50 3.11 | JOYPURHAT | PANCHBIBI | Joypurhat-1 | Completed | |
| IRRIGATION | Over NaogolaKhari atCharbakhra | JUL-81 JUN-83 | 4.72 2.45 | JOYPURHAT | KHETLAL | Joypurhat-2 | Completed | |
| IRRIGATION | Over Ramshala Khal | JUL-81 JUN-83 | 0.96 1.91 | BOGURA | ADAMDIGHI | Bogura-3 | Completed | |
| IRRIGATION | Over Ichamati Shitalpur | JUL-81 JUN-83 | 3.61 4.64 | CHATTOGRAM | SITAKUNDA | Chattogram-4 | Completed | |
| TOWN PROTECTION | Over Ambagan ghat, Kishoreganj | JUL-81 JUN-83 | 4.00 2.35 | GAIBANDHA | PALASHBARI | Gaibandha-3 | Completed | |
| TOWN PROTECTION | Over Bhaticbara at Sadullapur | JUL-81 JUN-83 | 3.50 1.38 | GAIBANDHA | SADULLAPUR | Gaibandha-3 | Completed | |
| TOWN PROTECTION | Over Chilgacha khal, Chilgacha | JUL-81 JUN-83 | 2.58 2.44 | SIRAJGANJ | KAZIPUR | Sirajganj-1 | Completed | |
| TOWN PROTECTION | Over Chadan Baisha, East Delua | JUL-80 JUN-83 | 0.98 9.35 | SIRAJGANJ | ULLAH PARA | Sirajganj-4 | Completed | |
| IRRIGATION | At Hajrakhali & Bahadurpur | JUL-82 JUN-83 | 10.44 10.44 | RAJBARI | BALIAKANDI, RAJBARI SADAR | Rajbari-1, Rajbari-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Ilisha,Banglabazar & Golakpur | JUL-80 JUN-83 | 28.64 20.73 | BHOLA | BHOLA SADAR | Bhola-1 | Completed | |
| IRRIGATION | 10 ft W.C.structure at Laljuri | JUL-82 JUN-83 | 15.76 15.76 | SYLHET | GOWAINGHAT | Sylhet-4 | Completed | |
| IRRIGATION | 10ft WC structure,Baranayaganj | JUL-81 JUN-83 | 14.19 14.19 | SYLHET | JAINTIAPUR | Sylhet-4 | Completed | |
| IRRIGATION | Brick matress.str.at Mollar kh | JUL-81 JUN-83 | 2.62 2.62 | SYLHET | SYLHET SADAR | Sylhet-1 | Completed | |
| IRRIGATION | 10ft W.C.structure,Khirainalya | JUL-81 JUN-83 | 5.26 5.26 | MOULVIBAZAR | KAMALGANJ | Moulvibazar-2 | Completed | |
| IRRIGATION | Over Bhulua Khal | JUL-81 JUN-83 | 7.44 7.44 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| IRRIGATION | Over Neamatpur D.C. canal | JUL-81 JUN-83 | 7.33 7.33 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| IRRIGATION | Baniagan River at Gazaria | JUL-81 JUN-83 | 0.68 0.30 | SIRAJGANJ | SIRAJGANJ SADAR | Sirajganj-2 | Completed | |
| IRRIGATION | Over Rajapur Debinagar canal | JUL-81 JUN-83 | 7.42 7.42 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| IRRIGATION | Over Parbati Nagar canal | JUL-81 JUN-83 | 7.41 7.41 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| IRRIGATION | Over Gokuler canal | JUL-81 JUN-83 | 7.33 7.33 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| IRRIGATION | Over Khil Baicha canal | JUL-81 JUN-83 | 4.08 4.08 | LAKSHMIPUR | LAKSHMIPUR SADAR | Lakshmipur-3 | Completed | |
| IRRIGATION | Over Bulbula canal | JUL-81 JUN-83 | 5.20 5.22 | FENI | DAGANBHUIYAN | Feni-3 | Completed | |
| IRRIGATION | At Fulbari over Sukdah canal | JUL-80 JUN-83 | 6.43 5.45 | BOGURA | GABTALI | Bogura-7 | Completed | |
| IRRIGATION | At Baithabhanga overSukdah can | JUL-80 JUN-83 | 12.77 8.60 | BOGURA | GABTALI | Bogura-7 | Completed | |
| IRRIGATION | At Jugibhita overMandaharkhari | JUL-81 JUN-83 | 3.85 4.19 | JOYPURHAT | AKKELPUR | Joypurhat-2 | Completed | |
| IRRIGATION | Over Mandakini canal | JUL-81 JUN-83 | 65.79 31.79 | CHATTOGRAM | HATHAZARI | Chattogram-5 | Completed | |
| IRRIGATION | Over Mallika canal | JUL-82 JUN-84 | 8.22 6.00 | MAGURA | MAGURA SADAR | Magura-1 | Completed | |
| DRAINAGE | Imp.of Laxmibhasa Charam beel | JUL-81 JUN-84 | 63.58 63.58 | TANGAIL | KALIHATI | Tangail-4 | Completed | |
| DRAINAGE | Loop cutting of Surma river | JUL-80 JUN-84 | 334.74 192.35 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Sanghair Haor scheme (Dutch) | JUL-80 JUN-84 | 107.85 93.34 | Completed | ||||
| FLOOD CONTROL | Bhola North East Embankment | JUL-80 JUN-84 | 569.70 399.65 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Dublakuri FC&Irr. Scheme | JUL-82 JUN-84 | 113.40 68.56 | MYMENSINGH | MUKTAGACHHA | Mymensingh-5 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Extension of Polder 66\3 (IDA) | JUL-80 JUN-84 | 143.29 137.43 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Polder 65\A-3 (Dutch) | JUL-81 JUN-84 | 127.30 94.48 | Completed | ||||
| DRAINAGE | Re-ex.of Bardal khal | JUL-79 JUN-84 | 116.60 101.00 | KISHOREGANJ | BAJITPUR, KULIAR CHAR | Kishoreganj-5, Kishoreganj-6 | Completed | |
| FLOOD CONTROL | Amtali closure in Pol-43/1 | JUL-79 JUN-84 | 155.14 163.62 | BARGUNA | AMTALI | Barguna-1 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Karnafuli Irrigation Project | JUL-75 JUN-84 | 4,805.17 4,805.17 | CHATTOGRAM | HATHAZARI, RANGUNIA, RAOZAN | Chattogram-5, Chattogram-6, Chattogram-7 | Completed | |
| IRRIGATION | Narayanganj Narsingdi Irrigation (Demonestration) Project (NND Agrani Project) | JUL-81 JUN-84 | 991.80 972.00 | NARAYANGANJ, NARSINGDI | NARSINGDI SADAR, RUPGANJ | Narayanganj-1, Narsingdi-1 | Completed | Download |
| DRAINAGE | Extension of Polder 6-8(Dutch) | JUL-79 JUN-84 | 268.02 141.64 | SATKHIRA | SATKHIRA SADAR | Satkhira-2 | Completed | |
| DRAINAGE | RCC Bridge over Narabangali R | JUL-82 JUN-84 | 20.83 20.83 | BOGURA | SARIAKANDI | Bogura-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Contn.of Appurtenant structure | JUN-84 | 173.00 173.00 | BHOLA | CHAR FASSON | Bhola-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Bridge cum Reg.over Konai Riv. | JUL-81 JUN-84 | 18.54 28.54 | TANGAIL | MIRZAPUR | Tangail-7 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Brahmaputra Right Flood Embkt. | JUL-74 JUN-85 | 3,632.50 3,957.72 | BOGURA, GAIBANDHA, GOPALGANJ, PABNA, RANGPUR, SHERPUR, SIRAJGANJ | BERA, BOGURA SADAR, FULCHHARI, GABTALI, KAMARKHANDA, KASHIANI, MITHA PUKUR, PIRGANJ, SADULLAPUR, SHERPUR SADAR | Bogura-6, Bogura-7, Gaibandha-3, Gaibandha-5, Gopalganj-2, Pabna-1, Rangpur-5, Rangpur-6, Sherpur-1, Sirajganj-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Angur Ali Haor (Dutch) | JUL-81 JUN-85 | 110.36 102.74 | SUNAMGANJ | BISHWAMBARPUR, TAHIRPUR | Sunamganj-1, Sunamganj-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Sakunia beel IR DR&FC scheme | JUL-81 JUN-85 | 196.00 121.12 | FARIDPUR | FARIDPUR SADAR, NAGARKANDA | Faridpur-2, Faridpur-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Barakpur Dighulia(Dutch) | JUL-82 JUN-85 | 283.20 280.14 | KHULNA | DAULATPUR | Khulna-3, Khulna-5 | Completed | |
| DRAINAGE | Re-ex.of Mukteswari Teka nadi | JUL-78 JUN-85 | 367.57 382.89 | JASHORE | JASHORE SADAR, KESHABPUR, MANIRAMPUR | Jashore-3, Jashore-5, Jashore-6 | Completed | |
| IRRIGATION | Barisal Irrign.Proj.Phase-II | JUL-80 JUN-85 | 3,029.19 3,012.56 | BARISHAL, JHALOKATHI, PIROJPUR | BAKERGANJ, KAWKHALI, RAJAPUR | Barishal-6, Jhalokathi-1, Pirojpur-2 | Completed | |
| FLOOD CONTROL | Polder 58/3 Char Faizuddin | JUL-80 JUN-85 | 264.15 253.86 | BHOLA | MANPURA | Bhola-4 | Completed | |
| FLOOD CONTROL | Lohagara FC Embankment Proj. | JUL-70 JUN-85 | 223.07 208.55 | NARAIL | LOHAGARA | Narail-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Singua Nebugati& other beel Dr | JUL-79 JUN-85 | 354.52 353.28 | NARAIL | LOHAGARA | Narail-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Baramanikdi Drainage&Irrigatn. | JUL-83 JUN-86 | 156.88 100.63 | FARIDPUR | FARIDPUR SADAR, NAGARKANDA | Faridpur-2, Faridpur-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Masajan Lohajan(Dutch EIP) | JUL-82 JUN-86 | 150.51 147.71 | TANGAIL | MIRZAPUR | Tangail-7 | Completed | |
| FLOOD CONTROL | FC Embankment along Left bank of Manu River | JUL-82 JUN-86 | 404.28 436.78 | MOULVIBAZAR | MAULVIBAZAR SADAR | Moulvibazar-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Fakirhati Chatlar beel Dr.sch. | JUL-83 JUN-86 | 25.62 3.77 | FARIDPUR | BHANGA, SADARPUR | Faridpur-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Damrir Haor | JUL-84 JUN-86 | 197.00 159.29 | SYLHET | FENCHUGANJ, GOLAPGANJ, SYLHET SADAR | Sylhet-1, Sylhet-3, Sylhet-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder 35/3(Dutch) | JUL-81 JUN-86 | 477.27 559.21 | BAGERHAT | BAGERHAT SADAR, RAMPAL | Bagerhat-2, Bagerhat-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Gazaria Beel Scheme | JUL-81 JUN-86 | 113.06 113.06 | KISHOREGANJ | KARIMGANJ | Kishoreganj-3 | Completed | |
| DRAINAGE | Kalaroa Drainage scheme | JUL-84 JUN-87 | 390.98 340.35 | SATKHIRA | KALAROA | Satkhira-1 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Sandwip Embankment | JUL-79 JUN-87 | 868.75 877.59 | CHATTOGRAM | SANDWIP | Chattogram-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Nagar Vally Project(Dutch EIP) | JUL-84 JUN-87 | 967.13 932.18 | BOGURA, NAOGAON | ADAMDIGHI, ATRAI, RANINAGAR | Bogura-3, Naogaon-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Chenchuri Beel Dr.Sc.(DFC-II) | JUL-72 JUN-87 | 1,110.00 1,168.91 | NARAIL | KALIA, LOHAGARA, NARAIL SADAR | Narail-1, Narail-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Meghna Dhonagoda Project (ADB) | JUL-73 JUN-88 | 14,662.49 14,319.22 | CHANDPUR | MATLAB UTTAR | Chandpur-2 | Completed | |
| FLOOD CONTROL | Sonail Embankment (Dutch EIP) | JUL-86 JUN-88 | 230.41 222.24 | GAIBANDHA | FULCHHARI | Gaibandha-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Pathakhali Konai beel(Dut.EIP) | JUL-85 JUN-88 | 229.73 229.73 | TANGAIL | MIRZAPUR | Tangail-7 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Sanghair Haor (Dutch) | JUL-86 JUN-88 | 130.58 130.58 | SUNAMGANJ | SUNAMGANJ SADAR | Sunamganj-4 | Completed | |
| IRRIGATION | Hangar khal Irrigatn(ADB EEC) | JUL-82 JUN-88 | 112.00 107.10 | CHATTOGRAM | SATKANIA | Chattogram-14 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Muhuri Irrigation Project | JUL-77 JUN-88 | 15,873.30 15,686.24 | CHATTOGRAM, FENI | CHHAGALNAIYA, FENI SADAR, MIRSHARAI, SONAGAZI | Chattogram-1, Feni-1, Feni-2, Feni-3 | Completed | |
| FLOOD CONTROL | Bighainadi Fl & Salinity contr | JUL-84 JUN-88 | 508.60 508.60 | PATUAKHALI | MIRZAGANJ | Patuakhali-1 | Completed | |
| DRAINAGE | Hamodar beel (Dutch) | JUL-83 JUN-88 | 261.00 135.55 | JHENAIDAH | JHENAIDAH SADAR | Jhenaidah-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Nagarnadi sub-proj.(Dutch,Swe) | JUL-83 JUN-88 | 446.55 446.00 | BOGURA, NAOGAON, NATORE | NANDIGRAM, RANINAGAR, SINGRA | Bogura-4, Naogaon-6, Natore-3 | Completed | |
| FLOOD CONTROL | Polder 43/2C | JUL-83 JUN-88 | 400.00 400.00 | PATUAKHALI | GALACHIPA | Patuakhali-3 | Completed | |
| DRAINAGE | Shaora beel (Dutch-Swedish) | JUL-83 JUN-88 | 135.55 135.55 | BOGURA | BOGURA SADAR | Bogura-6 | Completed | |
| IRRIGATION | North Bangladesh TW Proj(Inst) | JUL-80 JUN-89 | 8,855.00 8,509.04 | DINAJPUR, PANCHAGARH, THAKURGAON | BALIADANGI, BIRGANJ, BODA, HARIPUR, KAHAROLE, PANCHAGARH SADAR, PIRGANJ, RANISANKAIL, THAKURGAON SADAR | Dinajpur-1, Panchagarh-1, Panchagarh-2, Thakurgaon-1, Thakurgaon-2, Thakurgaon-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Chalan Beel Polder-D (IDA) | JUL-81 JUN-89 | 3,732.26 3,691.94 | NAOGAON, RAJSHAHI | BAGHMARA, MANDA, MOHANPUR, TANORE | Naogaon-4, Rajshahi-1, Rajshahi-3, Rajshahi-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Kalkini North (IFAD-EIP) | JUL-84 JUN-89 | 281.11 281.11 | MADARIPUR | KALKINI | Madaripur-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Dhuldi beel (IFAD IDA) | JUL-85 JUN-89 | 271.91 271.91 | FARIDPUR | FARIDPUR SADAR | Faridpur-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder 39/1C (IDA) | JUL-85 JUN-89 | 327.00 260.60 | BARGUNA | BARGUNA SADAR | Barguna-1 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Polder 56/57 Extension IDA EIP | JUL-86 JUN-89 | 528.08 528.08 | BHOLA | CHAR FASSON | Bhola-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Rahimpur khal (IDA EIP) | JUL-86 JUN-89 | 106.66 106.66 | SYLHET | ZAKIGANJ | Sylhet-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Naotana khal | JUL-85 JUN-89 | 107.31 103.61 | NETROKONA | KHALIAJURI | Netrokona-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Satla Bagda Pro.DFC-II,IDA EIP | JUL-72 JUN-89 | 3,855.95 3,855.95 | BARISHAL, GOPALGANJ, PIROJPUR | AGAILJHARA, BAKERGANJ, BANARIPARA, GAURNADI, KOTALIPARA, NAZIRPUR, TUNGIPARA, WAZIRPUR | Barishal-1, Barishal-2, Barishal-6, Gopalganj-3, Pirojpur-1 | Completed | |
| TOWN PROTECTION | Const. of Jetty at Gorakghata | JUL-87 JUN-89 | 331.58 331.58 | COX'S BAZAR | MAHESHKHALI | Cox's Bazar-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Surjamoni khal (Dutch Swedish) | JUL-87 JUN-89 | 198.54 198.54 | PATUAKHALI | BAUPHAL | Patuakhali-2 | Completed | |
| FLOOD CONTROL | Satla Bagda O&M Polder-3 | JUL-87 JUN-89 | 159.19 75.99 | BARISHAL | WAZIRPUR | Barishal-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Pathar Chauli Haor (Dutch-Swedish) | JUL-83 JUN-89 | 378.90 362.80 | SUNAMGANJ, SYLHET | CHHATAK, COMPANIGANJ, SYLHET SADAR | Sunamganj-5, Sylhet-1, Sylhet-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Hail Haor (IDA) | JUL-81 JUN-89 | 629.70 629.70 | MOULVIBAZAR | SREEMANGAL | Moulvibazar-4 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Satla Bagda(Main Proj.), IDA | JUL-72 JUN-89 | 2,876.13 2,876.13 | BARISHAL, GOPALGANJ | GAURNADI, KOTALIPARA, TUNGIPARA, WAZIRPUR | Barishal-1, Barishal-2, Gopalganj-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | North Rupganj Water Conservency Project (China) | JUL-84 JUN-90 | 3,613.11 3,414.40 | NARAYANGANJ | RUPGANJ | Narayanganj-1 | Completed | Download |
| FLOOD CONTROL AND DRAINAGE | Polder 55/2C (ADB) | JUL-86 JUN-90 | 806.33 629.70 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Arol Beel (IDA) | JUL-86 JUN-90 | 659.65 332.45 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | IFAD Aided FDR | JUL-88 JUN-90 | 260.00 224.01 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Rehabilitation of Narayanganj Narsingdi Irrigation Project | JUL-88 JUN-90 | 1,571.18 1,571.18 | NARAYANGANJ | RUPGANJ, SONARGAON | Narayanganj-1, Narayanganj-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Zilkar Haor (Dutch) | JUL-83 JUN-90 | 498.56 446.34 | SYLHET | SYLHET SADAR | Sylhet-1 | Completed | |
| IRRIGATION | Tubewell Proj(Electrification | JUL-86 JUN-90 | 7,098.73 6,008.17 | DINAJPUR, PANCHAGARH, THAKURGAON | ATWARI, BALIADANGI, BIRGANJ, BODA, HARIPUR, KAHAROLE, PIRGANJ, RANISANKAIL, TENTULIA, THAKURGAON SADAR | Dinajpur-1, Panchagarh-1, Panchagarh-2, Thakurgaon-1, Thakurgaon-2, Thakurgaon-3 | Completed | |
| IRRIGATION | Tube Well Pr.(comm.Area Dev) | JUL-84 JUN-90 | 3,378.88 3,146.57 | DINAJPUR, PANCHAGARH, THAKURGAON | ATWARI, BALIADANGI, BIRGANJ, BODA, HARIPUR, KAHAROLE, PIRGANJ, RANISANKAIL, TENTULIA, THAKURGAON SADAR | Dinajpur-1, Panchagarh-1, Panchagarh-2, Thakurgaon-1, Thakurgaon-2, Thakurgaon-3 | Completed | |
| IRRIGATION | BHOLA IRRIGATION PROJECT, Ph-1 | JUL-82 JUN-91 | 6,307.97 5,271.57 | BHOLA | BHOLA SADAR, BURHANUDDIN, LALMOHAN | Bhola-1, Bhola-2, Bhola-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | IDA Aided BWDB small schmes | JUL-85 JUN-91 | 3,593.58 3,014.94 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Sirajganj IRDP | JUL-77 JUN-91 | 5,067.29 4,742.57 | PABNA, SIRAJGANJ | BHANGURA, CHATMOHAR, FARIDPUR, ROYGANJ, SHAHJADPUR, TARASH, ULLAH PARA | Pabna-3, Sirajganj-3, Sirajganj-4, Sirajganj-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Kangsa River | JUL-84 JUN-91 | 900.97 864.92 | NETROKONA | PURBADHALA | Netrokona-5 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Sakuchia Island(Polder 58/2) | JUL-87 JUN-91 | 1,139.65 976.07 | BHOLA | MANPURA | Bhola-4 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Polder 39/1-A | JUN-91 | 477.18 447.31 | BARGUNA | PATHARGHATA | Barguna-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Polder 52-53/A&B | JUN-91 | 1,095.28 937.09 | PATUAKHALI | GALACHIPA | Patuakhali-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Thakurkona | JUL-88 JUN-91 | 392.41 299.82 | NETROKONA | NETROKONA SADAR | Netrokona-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Hurasagar River | JUN-91 | 765.62 693.58 | SIRAJGANJ | SHAHJADPUR | Sirajganj-6 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Gurmar Haor | JUN-91 | 1,370.08 589.92 | SUNAMGANJ | DHARAMPASHA | Sunamganj-1 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Sonaimaral Haor | JUN-91 | 870.29 511.06 | SUNAMGANJ | DHARAMPASHA | Sunamganj-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Kamar Naogaon (ADB) | JUL-88 JUN-91 | 526.47 292.36 | TANGAIL | DELDUAR | Tangail-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder 55/4 | JUN-91 | 1,328.17 945.54 | PATUAKHALI | GALACHIPA | Patuakhali-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Aglar Chak | JUL-86 JUN-91 | 887.79 351.61 | DHAKA | NAWABGANJ | Dhaka-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Polder 43/2B | JUN-91 | 845.29 666.40 | PATUAKHALI | GALACHIPA | Patuakhali-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Gumti Project, Phase-1, FCD-3 | JUL-84 JUN-92 | 11,405.14 10,512.85 | CUMILLA | BURICHANG, DAUDKANDI, DEBIDWAR, MURADNAGAR | Cumilla-1, Cumilla-3, Cumilla-4, Cumilla-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Gangajuri Haor, Habiganj | JUL-86 JUN-92 | 1,956.49 1,821.50 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Paisarhat Ramsil, Barisal | JUL-86 JUN-92 | 866.92 1,199.63 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Tarail Pachuria,Pol-4&5,G'gonj | JUL-88 JUN-92 | 606.15 59.22 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | PABNA IRRIGATION PROJ, Phase1 | JUL-70 JUN-92 | 38,404.14 36,830.11 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Haijda Embankment, Netrokona | JUL-83 JUN-92 | 961.23 887.96 | NETROKONA | MOHANGANJ | Netrokona-4 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Keraniganj Irrigation Project | JUL-85 JUN-92 | 967.54 387.21 | DHAKA | KERANIGANJ | Dhaka-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Gograjala Irrigation Project | JUL-85 JUN-92 | 1,154.56 723.80 | CUMILLA | CHANDINA, DAUDKANDI | Cumilla-1, Cumilla-7 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Baram Haor, Sunamganj | JUL-86 JUN-92 | 463.10 474.90 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Nuruler Beel, Gaibandha | JUL-86 JUN-92 | 548.73 504.62 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Satdamua Katlar Beel,Gaibandha | JUL-87 JUN-92 | 441.63 432.46 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Upper Nagor River, Bogra | JUL-87 JUN-92 | 770.84 722.65 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | REP.& RECONT.OF FD,SYLHET DIST | JUL-90 JUN-92 | 273.00 272.70 | Completed | ||||
| FEASIBILITY STUDY | RIVER RESEARCH INSTITUTE | JUL-76 JUN-93 | 7,904.55 6,874.31 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Kalidaskhali Arpara | JUL-87 JUN-93 | 902.72 1,033.82 | Completed | ||||
| DRAINAGE AND IRRIGATION | Chenchuri Beel | JUL-84 JUN-93 | 601.50 551.05 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Kalkini South | JUL-84 JUN-93 | 375.51 417.37 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Tarail Panchuria, Polder-2 | JUL-86 JUN-93 | 774.21 523.00 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Baliakandi Modhukhali | JUL-88 JUN-93 | 438.91 367.95 | RAJBARI | RAJBARI SADAR | Rajbari-1 | Completed | |
| DRAINAGE AND IRRIGATION | Tangon Barrage | JUL-82 JUN-93 | 1,249.89 1,289.94 | PANCHAGARH | PANCHAGARH SADAR | Panchagarh-1 | Completed | |
| DRAINAGE AND IRRIGATION | Narayanganj Narsingdi (BLOCK-A1) Irrigation Project | JUL-88 JUN-93 | 11,390.02 10,335.50 | NARAYANGANJ | NARAYANGANJ SADAR | Narayanganj-5 | Completed | Download |
| FLOOD CONTROL AND DRAINAGE | Faridpur Area-1 | JUL-85 JUN-93 | 680.01 416.01 | FARIDPUR | FARIDPUR SADAR | Faridpur-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Bhutiar Beel | JUL-86 JUN-93 | 887.96 790.08 | KHULNA, NARAIL | KHULNA SADAR, NARAIL SADAR | Khulna-2, Narail-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Venda Beel | JUL-87 JUN-93 | 441.06 390.96 | SUNAMGANJ | SUNAMGANJ SADAR | Sunamganj-4 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Shakpaldia | JUL-89 JUN-93 | 291.40 179.26 | FARIDPUR | FARIDPUR SADAR | Faridpur-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Polder 43/2E | JUL-88 JUN-93 | 526.18 324.84 | PATUAKHALI | PATUAKHALI SADAR | Patuakhali-1 | Completed | |
| FLOOD CONTROL AND DRAINAGE | NAOGAON PROJECT, POL-1, FCD-3 | JUL-84 JUN-94 | 10,400.00 9,956.25 | Completed | ||||
| DRAINAGE AND IRRIGATION | Halda Irrign Extension, Chitt. | JUL-86 JUN-94 | 3,001.47 3,251.49 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Shila River, Mymensingh | JUL-84 JUN-94 | 870.97 711.34 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Upper Shila River, Mymensingh | JUL-86 JUN-94 | 710.87 735.40 | Completed | ||||
| DRAINAGE AND IRRIGATION | G.K. IRRIGATION REHAB. PROJECT | JUL-82 JUN-94 | 21,256.83 17,272.71 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Badalgachi, Naogaon | JUL-88 JUN-94 | 841.57 698.28 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Bibichini, Barguna | JUL-89 JUN-94 | 521.14 465.65 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Satkhira Kolaroa, Satkhira | JUL-89 JUN-94 | 545.28 406.33 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Chitra-Bhairab Proj. Jessore | JUL-90 JUN-94 | 1,035.54 802.82 | Completed | ||||
| BANK PROTECTION | Bhadra River Bank Prot.Khulna | JUN-94 | 25.00 23.50 | Completed | ||||
| TOWN PROTECTION | Godagari Rail Bazar Prot. Raj | JUL-92 JUN-94 | 450.00 399.75 | Completed | ||||
| TOWN PROTECTION | Hemayetpur-Singair-Manikganj | JUN-94 | 40.00 31.00 | Completed | ||||
| BANK PROTECTION | Ghagat River Prot. Rangpur | JUL-93 JUN-94 | 44.00 3.00 | Completed | ||||
| FLOOD CONTROL | Tangua Haor, Sunamganj | JUL-88 JUN-95 | 687.57 593.16 | Completed | ||||
| FLOOD CONTROL | Upper Nagar Valley, Rajshahi | JUL-88 JUN-95 | 720.18 618.13 | Completed | ||||
| FLOOD CONTROL | Tulshi Ganga, Naogaon | JUL-88 JUN-95 | 742.00 646.45 | Completed | ||||
| IRRIGATION | Polder 43/2F, Barguna | JUL-89 JUN-95 | 965.85 696.31 | Completed | ||||
| IRRIGATION | Polder 43/2D, Patuakhali | JUL-89 JUN-95 | 1,124.62 911.21 | Completed | ||||
| FLOOD CONTROL | Karotoa FC Project, Gaibandha | JUL-90 JUN-95 | 1,231.13 966.53 | Completed | ||||
| FLOOD CONTROL | Udgal Beel FC Proj. Sunamganj | JUL-90 JUN-95 | 674.54 387.86 | Completed | ||||
| FLOOD CONTROL | Joal Bhanga, Sunamganj | JUL-90 JUN-95 | 663.56 540.33 | Completed | ||||
| FLOOD CONTROL | Khai Haor, Sunamganj | JUL-90 JUN-95 | 325.38 402.43 | Completed | ||||
| TOWN PROTECTION | Muladi Town/Port Prot, Barisal | JUL-92 JUN-95 | 96.00 95.93 | Completed | ||||
| TOWN PROTECTION | Murad Bond Mazar Prot,Habiganj | JUL-92 JUN-95 | 76.15 73.15 | Completed | ||||
| TOWN PROTECTION | Fakirhat-Jatrpur Rd Prot.B-hat | JUL-92 JUN-95 | 28.70 26.96 | Completed | ||||
| TOWN PROTECTION | Patuakhali Town Protection | JUL-92 JUN-95 | 153.75 165.92 | Completed | ||||
| TOWN PROTECTION | Hemayetpur-Singair-Manikganj | JUL-93 JUN-95 | 40.00 47.75 | Completed | ||||
| TOWN PROTECTION | Tekerhat Bandar Prot,Madaripur | JUL-93 JUN-95 | 100.00 96.49 | Completed | ||||
| TOWN PROTECTION | Rd near Sreepur Bridge, Magura | JUL-94 JUN-95 | 103.00 100.00 | Completed | ||||
| TOWN PROTECTION | Naba Ganga Rvr at Magura Weir | JUL-93 JUN-95 | 206.00 150.00 | Completed | ||||
| TOWN PROTECTION | BDR camp area prot, Kaptai | JUL-94 JUN-95 | 63.00 50.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Polder 43/2C, Patuakhali | JUL-93 JUN-96 | 69.70 29.75 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Satla Bagda, Pol-3, Barisal | JUL-93 JUN-96 | 55.30 33.93 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Polder 65/A-3, Cox's Bazar | JUL-93 JUN-96 | 13.28 9.55 | Completed | ||||
| TOWN PROTECTION | Muladi Town/Port Prot, Barisal | JUL-92 JUN-96 | 96.00 125.93 | Completed | ||||
| TOWN PROTECTION | Godagari Rail Bazar Prot. Raj. | JUL-92 JUN-96 | 450.00 504.75 | Completed | ||||
| TOWN PROTECTION | Tala-Melakhola Prot, Satkhira | JUL-93 JUN-96 | 55.27 97.00 | Completed | ||||
| TOWN PROTECTION | Rangamati Town Prot. Rangamati | JUL-93 JUN-96 | 232.00 231.50 | Completed | ||||
| TOWN PROTECTION | Kumira-Fauzdarhat Prot. Ctg | JUL-93 JUN-96 | 170.00 157.00 | Completed | ||||
| TOWN PROTECTION | Gaibandha Town Protection | JUN-96 | 141.00 155.75 | Completed | ||||
| IRRIGATION | Naba Ganga Rvr at Magura Weir | JUN-96 | 206.00 206.00 | Completed | ||||
| TOWN PROTECTION | Nawabganj Health-complex prot | JUN-96 | 53.00 53.00 | Completed | ||||
| BANK PROTECTION | Sykhola-Gumani RBP, Serajganj | JUN-96 | 80.00 70.00 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Bamankhali-Barnali, Magura | JUL-88 JUN-97 | 1,629.31 1,213.70 | Completed | ||||
| BANK PROTECTION | GK IRRIGN PUMP STATION PROT | JUL-94 JUN-97 | 500.00 550.00 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | TEESTA BARRAGE PROJECT | JUL-60 JUN-98 | 96,875.00 96,207.01 | Completed | ||||
| BANK PROTECTION | RAISING & PROT OF EMBKT,POL-71 | JUL-94 JUN-98 | 1,203.77 1,227.27 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | DUTCH SWEDISH EIP, PH-4, GR-2 | JUL-90 JUN-98 | 3,637.85 3,506.25 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | CHAR DEV.& SETLEMENT PROJECT | JUL-94 JUN-98 | 2,552.60 2,324.78 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Kalikota Haor Project | JUL-94 JUN-98 | 753.72 753.83 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | TULSHI GANGA PROJECT | JUL-94 JUN-98 | 369.52 451.25 | Completed | ||||
| DRAINAGE AND IRRIGATION | TITAS RIVER RE-EXCAV PROJECT | JUL-94 JUN-98 | 561.23 562.50 | Completed | ||||
| IRRIGATION | BIP GRAVITATIONAL PILOT PROJ | JUL-94 JUN-98 | 237.12 288.00 | Completed | ||||
| BANK PROTECTION | TEESTA RB PROT, BAIRATI,NOHALI | JUL-94 JUN-98 | 995.63 1,013.32 | Completed | ||||
| FEASIBILITY STUDY | FS OF SW AREA WATER MANGT,FAP4 | JUL-94 JUN-98 | 761.00 624.66 | Completed | ||||
| IRRIGATION | LALUTIA IRRIGATION PROJECT | JUL-95 JUN-99 | 132.84 132.98 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | UPPER TULSHI GANGA FC&D PROJ | JUL-94 JUN-99 | 2,046.58 2,090.17 | Completed | ||||
| FLOOD CONTROL | FC EMBKT AT RB OF GUMTI RIVER | JUL-94 JUN-99 | 219.59 217.31 | Completed | ||||
| IRRIGATION | HALDA IRRIGATION EXTENSION | JUL-95 JUN-99 | 330.50 260.91 | Completed | ||||
| DRAINAGE | ARCHI RVR & BRANCH CNL REEXCAV | JUL-95 JUN-99 | 535.62 535.28 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | WDB DAMAGED STRUCTURES IN NB | JUL-95 JUN-99 | 3,636.59 3,269.86 | Completed | ||||
| FEASIBILITY STUDY | SURESWAR PROJECT (F.Study) | JUL-97 JUN-99 | 50.00 50.00 | Completed | ||||
| IRRIGATION | TEESTA BARRAGE FLOOD BYPASS | JUL-96 JUN-99 | 806.00 806.00 | Completed | ||||
| BANK PROTECTION | PROT OF G.K PUMP & FEEDER CANL | JUL-97 JUN-99 | 1,810.00 2,024.40 | Completed | ||||
| FLOOD CONTROL | RETIRED FC EMBKT IN PABNA IRDP | JUL-97 JUN-99 | 843.25 842.81 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | DUTCH SWEDISH EIP, PH-4, GR-1 | JUL-89 JUN-99 | 4,116.63 3,736.64 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | DUTCH SWEDISH EIP, PH-4, GR-3 | JUL-93 JUN-99 | 5,255.21 4,511.71 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | DUTCH-SWEDISH EIP, PH-F, GR-1 | JUL-96 JUN-99 | 2,262.64 1,101.45 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | DUTCH EIP, PH-F, GR-2 | JUL-96 JUN-99 | 1,922.70 1,506.65 | Completed | ||||
| IRRIGATION | BHOLA IRRIGATION PROJECT, PH-2 | JUL-92 JUN-00 | 12,676.00 12,312.16 | Completed | ||||
| TOWN PROTECTION | SEC.TOWN INTGR.FLD PROT. P-A&D | JUL-92 JUN-00 | 18,788.96 17,921.04 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | DUMKY LAUKATHI PROJECT | JUL-94 JUN-00 | 675.80 666.31 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | SMALL SCALE FC, DR & IRRIGN | JUL-95 JUN-00 | 2,320.94 2,288.20 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Makal Kandi Haor Project | JUL-95 JUN-00 | 346.15 340.15 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | COMPARTMENTL PILOT PROJ,FAP-20 | JUL-90 JUN-00 | 11,726.02 10,453.14 | Completed | ||||
| FEASIBILITY STUDY | FS OF KOBADAK RIVER RE-EXCAV | JUL-98 JUN-00 | 38.66 34.56 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | POLDER 55/3 | JUL-95 JUN-01 | 788.80 784.20 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Dekhar Haor FCD Project (FS PC-2) | JUL-97 JUN-01 | 113.97 111.08 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | FDR/98 OF N.N.I PROJECT | JUL-98 JUN-01 | 564.00 544.00 | Completed | ||||
| DRAINAGE | KALNI-KUSHIARA RV MGNT. PROJ. | JUL-99 JUN-01 | 305.55 243.00 | Completed | ||||
| BANK PROTECTION | RIVER BANK PROTN. PROJ.(FP-1) | JUL-95 JUN-02 | 76,345.00 74,522.85 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | KURIGRAM FC & IRRIGN, S. UNIT | JUL-95 JUN-02 | 1,720.00 1,612.49 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Dhaka Integrated Flood Protection Project, Part-A & D, FAP-8B | JUL-91 JUN-02 | 52,311.80 50,849.04 | Completed | Download | |||
| FLOOD CONTROL AND DRAINAGE | UPDA KHALI PROJECT | JUL-96 JUN-02 | 860.00 701.15 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | TARAIL-PANCHURIA FC,DR,IRR PH1 | JUL-96 JUN-02 | 2,397.00 2,313.77 | Completed | ||||
| TOWN PROTECTION | GAIBANDHA TOWN PROT. PROJECT | JUL-95 JUN-02 | 2,123.37 2,102.76 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | KENDUAR BEEL POLDER 36/1 EXT. | JUL-99 JUN-02 | 234.60 230.54 | Completed | ||||
| FEASIBILITY STUDY | FS OF FOUR FCD PROJ(PC-2) | JUL-98 JUN-02 | 90.91 90.06 | Completed | ||||
| DRAINAGE | MADHUMATI RVR DREDGING | JUL-99 JUN-02 | 895.35 884.17 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | JESSORE-KHULNA DR.REH PROJ,A&B | JUL-93 JUN-03 | 25,118.00 22,868.16 | Completed | ||||
| DRAINAGE | RE-EXCAVATION OF GORAI RIVER | JUL-96 JUN-03 | 32,809.00 25,984.00 | Completed | ||||
| TOWN PROTECTION | KHAGRACHARI TOWN PROTECTION(3) | JUL-98 JUN-03 | 998.00 923.63 | Completed | ||||
| FEASIBILITY STUDY | FS OF S.COMILLA & N.NOAKHALI | JUL-99 JUN-03 | 155.00 153.86 | Completed | ||||
| REHABILATATION | COASTAL EMBKT REHAB PROJ.PH-2 | JUL-95 JUN-04 | 49,803.00 47,371.22 | Completed | ||||
| TOWN PROTECTION | BHOLA TOWN PROTECTION | JUL-93 JUN-04 | 3,231.00 3,151.19 | Completed | ||||
| DRAINAGE | NOAKHALI KHAL RE-EXCAVATION | JUL-98 JUN-07 | 1,725.00 1,416.01 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | POLDER 50/51,BARABAISHDIA FCDR | JUL-98 JUN-07 | 2,496.00 2,420.64 | Completed | ||||
| DRAINAGE | SAGARKHALI BARABILA DR. PROJ. | JUL-99 JUN-07 | 8,721.00 7,878.78 | MAGURA | SREEPUR | Magura-1 | Completed | |
| TOWN PROTECTION | PADMA L/B PROT. PAKNARAYNPUR | JUL-00 JUN-07 | 13,995.00 13,484.15 | Completed | ||||
| TOWN PROTECTION | SALINITY PROT KUMIRA-SONACHARI | JUL-02 JUN-07 | 1,831.00 1,688.44 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | PROT. HASAIL, MUNSHIGONJ | JUL-05 JUN-07 | 1,200.00 1,139.99 | Completed | ||||
| TOWN PROTECTION | Protection of Fuclchari Head Quarter and Kamarjani Bazar from erosion of the River Jamuna | JUL-03 JUN-09 | 4,794.26 4,378.79 | GAIBANDHA | FULCHHARI, SAGHATA | Gaibandha-5 | Completed | |
| BANK PROTECTION | Embankment Construction Project From Rajabari to Baliaghata at Godagari Upazila under Rajshahi District | JUL-03 JUN-09 | 17,755.30 9,462.84 | RAJSHAHI | GODAGARI | Rajshahi-1 | Completed | |
| TOWN PROTECTION | Protection of Faridpur Toen and adjacent area from reosion of the river Padma in upazilla Faridpur Sadar and Charbhadrason under district Faridpur | JUL-03 JUN-09 | 12,199.16 11,783.64 | FARIDPUR | CHAR BHADRASAN, FARIDPUR SADAR | Faridpur-3, Faridpur-4 | Completed | |
| FEASIBILITY STUDY | Feasibility study of pilot program of Land reclamation from Bay of Bangal by Engineering and Biological Interventions | JUL-05 JUN-09 | 181.31 167.93 | Completed | ||||
| TOWN PROTECTION | Bemorta Project at Bagerhat Sadar & Kachua Upazilla in Bagerhat | JUL-05 JUN-09 | 1,000.62 774.26 | BAGERHAT | BAGERHAT SADAR | Bagerhat-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Drainage Improvement of Dhaka-Narayangonj-Demra (DND) Project | JUL-06 JUN-09 | 1,229.38 1,226.61 | DHAKA, NARAYANGANJ | DEMRA, JATRABARI, NARAYANGANJ SADAR, SHYAMPUR | Dhaka-4, Dhaka-5, Narayanganj-5 | Completed | |
| TOWN PROTECTION | Kadupur-Basantapur, Manikkona, Velkona and Moinpur Area protection project from erosion of the Kushiyara River of Upazila Golapganj & Fenchuganj under Sylhet District | JUL-06 JUN-09 | 1,099.55 868.74 | SYLHET | FENCHUGANJ, GOLAPGANJ | Sylhet-3, Sylhet-6 | Completed | |
| TOWN PROTECTION | Protection of Goali Chara, Kazirbazar Chara, Jangalia-Jugirgaon and Mahtabpur in Sadar Upazila under Sylhet District | JUL-06 JUN-09 | 336.78 247.04 | SYLHET | SYLHET SADAR | Sylhet-1 | Completed | |
| TOWN PROTECTION | Protection of Bhandarbari and Adjacent Area Under Dhunat Upazilla in Bogra District From Right Bank Erosion of the Jamuna River | JUL-06 JUN-09 | 2,298.00 2,028.55 | BOGURA | DHUNAT | Bogura-5 | Completed | |
| TOWN PROTECTION | Protection of Handloom Enriched Betil and Enayetpur Bazar Areas from the Erosion of Jamuna River in Belkuchi & chowhali upazilla under sirajganj | JUL-07 JUN-09 | 3,139.00 3,077.09 | SIRAJGANJ | BELKUCHI, CHAUHALI | Sirajganj-5 | Completed | |
| REHABILATATION | Urgent Rehabilitation of Pumping Facilities of G.K. Irrigation Project for Sustaining Rural Economic Development | JUL-00 JUN-09 | 19,525.31 17,946.51 | KUSHTIA | BHERAMARA | Kushtia-2 | Completed | |
| TOWN PROTECTION | River Bank Erosion Protection of the Most Vulnerable Part at Lalmohan Upazila under Bhola District | JUL-05 JUN-09 | 2,309.11 1,755.53 | BHOLA | LALMOHAN | Bhola-3 | Completed | |
| TOWN PROTECTION | Protection of Baguria of Gaibandha Sadar Upazila & Sayedpur Kanchipara, Balashighat of Fulchari Upazila | JUL-05 JUN-10 | 5,000.00 4,540.51 | GAIBANDHA | FULCHHARI, GAIBANDHA SADAR | Gaibandha-2, Gaibandha-5 | Completed | |
| DRAINAGE | Mitigation of Drainage Congestion in Polder No. 1 & 2 under Coastal Embankment project in Satkhira District | JUL-05 JUN-10 | 1,550.00 1,524.02 | SATKHIRA | SATKHIRA SADAR | Satkhira-2 | Completed | |
| TOWN PROTECTION | Bhola District Town Protection Project (Phase-2) | JUL-06 JUN-10 | 2,453.00 2,280.93 | BHOLA | BHOLA SADAR | Bhola-1 | Completed | |
| TOWN PROTECTION | Meghna-Tentulia River Bank Erosion Protection Project (Phase-2, Daulatkhan Area) | JUL-06 JUN-10 | 1,573.50 1,442.42 | BHOLA | DAULAT KHAN | Bhola-2 | Completed | |
| TOWN PROTECTION | Bank Protection work BNS Titumir Area from erosion of Bhairab River in Khulna District | JUL-07 JUN-10 | 1,429.00 1,427.79 | KHULNA | KHULNA SADAR | Khulna-2 | Completed | |
| TOWN PROTECTION | Protection of Coast Guard Station of the Sangu River at Raipur, Anowara, Chittagong | JUL-07 JUN-10 | 975.12 972.61 | CHATTOGRAM | ANOWARA | Chattogram-13 | Completed | |
| BANK PROTECTION | Protection of Tilokpur to Palidaha via Gouripur from the Erosion of the left Bank of River Padma in Upazila Lalpur under Natore District | JUL-07 JUN-10 | 2,368.24 1,893.91 | NATORE | LALPUR | Natore-1 | Completed | |
| TOWN PROTECTION | Protection of Panchgoan, Hasail-Banari and Dighirpar Union under Tongibari Upazila in Munshigonj District from the erosion of the River Padma | JUL-07 JUN-10 | 8,032.50 7,795.97 | MUNSHIGANJ | TONGIBARI | Munshiganj-2 | Completed | |
| TOWN PROTECTION | Protection of Brahmaputra River Right Bank at Bairagirhat and Chilamari Bandar in Uuoazila Chilamari under Kurigram District (Phase-1) | JUL-07 JUN-10 | 9,368.00 9,267.67 | KURIGRAM | CHILMARI | Kurigram-4 | Completed | |
| TOWN PROTECTION | Chandpur Town Protection Project (3rd Phase) | JUL-08 JUN-10 | 2,467.76 2,400.90 | CHANDPUR | CHANDPUR SADAR | Chandpur-3 | Completed | |
| DRAINAGE | Expansion of Activities of Chowddamader Beel Embankment & Khal Excavation Project | JUL-06 JUN-10 | 770.96 728.15 | BARISHAL, GOPALGANJ, MADARIPUR | AGAILJHARA, GAURNADI, KALKINI, KOTALIPARA | Barishal-1, Gopalganj-3, Madaripur-3 | Completed | |
| TOWN PROTECTION | Protection of Chandpur Irrigation Project From the Erosion of the meghna River (1st Phase, Revised) | JUL-06 JUN-10 | 4,480.42 4,296.08 | CHANDPUR | HAIM CHAR | Chandpur-3 | Completed | |
| IRRIGATION | Extension of Mohamaya Chara Irrigation Project Completion Report | JUL-06 JUN-10 | 2,011.41 1,716.20 | CHATTOGRAM | MIRSHARAI | Chattogram-1 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Integrated Planning for Sustainable Water Management (IPSWAM) | JUL-99 JUN-11 | 11,380.34 10,693.54 | BARGUNA, KHULNA, PATUAKHALI | AMTALI, BATIAGHATA, DUMURIA, GALACHIPA, PAIKGACHHA, PATUAKHALI SADAR | Barguna-1, Khulna-1, Khulna-5, Khulna-6, Patuakhali-1, Patuakhali-3 | Completed | |
| REHABILATATION | Rahabilitation of Coastal Polder Most at Risk | JUL-03 JUN-11 | 7,127.00 6,714.20 | BAGERHAT, BARGUNA, CHATTOGRAM, COX'S BAZAR, LAKSHMIPUR | BANSHKHALI, BARGUNA SADAR, COX'S BAZAR SADAR, RAMGATI, SANDWIP, SARANKHOLA | Bagerhat-4, Barguna-1, Chattogram-16, Chattogram-3, Cox's Bazar-3, Lakshmipur-4 | Completed | |
| BANK PROTECTION | Embankment construction project from Kazirhat to Satbaria in the Pabna District | JUL-05 JUN-11 | 3,422.97 3,348.48 | PABNA | BERA, SUJANAGAR | Pabna-1, Pabna-2 | Completed | |
| LAND RECLAMATION | Char Development and Settlement Project-3 (CDSP-3) | JUL-05 JUN-11 | 9,021.81 9,329.95 | LAKSHMIPUR, NOAKHALI | HATIYA, NOAKHALI SADAR, RAMGATI | Lakshmipur-4, Noakhali-4, Noakhali-6 | Completed | |
| TOWN PROTECTION | Narsingdi Town Protection Project | JUL-06 JUN-11 | 2,255.15 2,209.94 | NARSINGDI | NARSINGDI SADAR | Narsingdi-1 | Completed | |
| TOWN PROTECTION | Protection of Soilabari and adjacent areas of Sirajganj Town from the erosion of Jamuna River | JUL-07 JUN-11 | 25,479.00 20,576.40 | SIRAJGANJ | SIRAJGANJ SADAR | Sirajganj-2 | Completed | |
| TOWN PROTECTION | Construction of Embankment and other Ancillary work in Tannery Industrial Area under Savar Upazila under Dhaka District | JUL-07 JUN-11 | 2,014.50 1,577.02 | DHAKA | SAVAR | Dhaka-19 | Completed | |
| DRAINAGE | Re-excavation of Narod River, Musakhan River (Part) and Intake Channel of Charghat Regulator | JUL-08 JUN-11 | 1,333.66 1,064.18 | NATORE, RAJSHAHI | BAGATIPARA, CHARGHAT, NATORE SADAR, PUTHIA, SINGRA | Natore-1, Natore-2, Natore-3, Rajshahi-5, Rajshahi-6 | Completed | |
| FEASIBILITY STUDY | Feasibility Study/Survey for Integrated Water Management Project of Gungiajuri Hoar Area | JUL-09 JUN-11 | 186.42 171.95 | HABIGANJ | BAHUBAL, BANIACHONG, HABIGANJ SADAR, NABIGANJ | Habiganj-1, Habiganj-2, Habiganj-3 | Completed | |
| FEASIBILITY STUDY | Integrated Water Management Project of Polder 34/2 in Bagerhat District | JUL-09 JUN-11 | 164.98 141.40 | BAGERHAT | RAMPAL | Bagerhat-3 | Completed | |
| IRRIGATION | Kurigram Irrigation Project (North Unit) | JUL-06 JUN-11 | 10,997.50 1,469.23 | KURIGRAM | BHURUNGAMARI, NAGESHWARI | Kurigram-1 | Completed | |
| IRRIGATION | Kurigram Irrigation Project (South Unit) | JUL-06 JUN-11 | 20,779.90 1,522.18 | KURIGRAM, LALMONIRHAT | CHILMARI, KURIGRAM SADAR, LALMONIRHAT SADAR, RAJARHAT, ULIPUR | Kurigram-2, Kurigram-3, Kurigram-4, Lalmonirhat-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Khaliajuri Flood Control and Drainage Project | JUL-03 JUN-12 | 4,161.00 3,905.16 | KISHOREGANJ, NETROKONA, SUNAMGANJ | DHARAMPASHA, ITNA, JAMALGANJ, KHALIAJURI, MADAN | Kishoreganj-4, Netrokona-4, Sunamganj-1 | Completed | |
| BANK PROTECTION | Embankment Construction Project from Zianagar to Hularhat in Project District | JUL-05 JUN-12 | 3,284.00 3,251.67 | PIROJPUR | INDURKANI [ZIANAGAR], PIROJPUR SADAR | Pirojpur-1, Pirojpur-2 | Completed | |
| TOWN PROTECTION | Protection of Chapai Nawabganj Sadar and Shibganj Upazila from the erosion of the Padma River (1st Revised) | JUL-07 JUN-12 | 15,324.18 13,178.54 | CHAPAI NAWABGANJ | CHAPAI NABABGANJ SADAR, SHIBGANJ | Chapainawabganj-1, Chapainawabganj-3 | Completed | |
| TOWN PROTECTION | Patuakhali Town Protection Embankment Project | JUL-07 JUN-12 | 2,663.00 2,560.36 | PATUAKHALI | PATUAKHALI SADAR | Patuakhali-1 | Completed | |
| TOWN PROTECTION | Rajbari Town Protection Project | JUL-09 JUN-12 | 4,775.90 4,772.71 | RAJBARI | GOALANDA, RAJBARI SADAR | Rajbari-1 | Completed | |
| TOWN PROTECTION | Protection of Kalna Ferryghat from erosion of the Madhumati River at Kashiani Upazila in Goplaganj District and Madripur Town & afjacent area protection from eosion of the Arial Khan River Project | JUL-09 JUN-12 | 3,745.97 3,570.81 | GOPALGANJ, MADARIPUR | KASHIANI, MADARIPUR SADAR | Gopalganj-2, Madaripur-2 | Completed | |
| FEASIBILITY STUDY | Feasibility Study for West Gopalgonj Integrated Water Management Project | JUL-09 JUN-12 | 153.97 105.84 | GOPALGANJ | GOPALGANJ SADAR, KASHIANI, MUKSUDPUR | Gopalganj-1, Gopalganj-2 | Completed | |
| BANK PROTECTION | Protection of Chowhali Upazila district from the erosion of the River Jamuna | JUL-09 JUN-12 | 3,605.66 3,290.42 | SIRAJGANJ | CHAUHALI | Sirajganj-5 | Completed | |
| FEASIBILITY STUDY | Sureswar Flood Control, Drainage and Irrigation Project | JUL-09 JUN-12 | 156.00 140.13 | SHARIATPUR | BHEDARGANJ, DAMUDYA, GOSAIRHAT, NARIA, SHARIATPUR SADAR, ZANJIRA | Shariatpur-1, Shariatpur-2, Shariatpur-3 | Completed | |
| REHABILATATION | Rehabilitation and Strengthening of Sirajganj Hard Point (Revised) | JUL-10 JUN-12 | 7,145.12 6,453.69 | SIRAJGANJ | SIRAJGANJ SADAR | Sirajganj-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Muhuri Kahua Flood Control Drainage & Irrigation Project | JUL-05 JUN-12 | 13,929.39 13,749.41 | FENI | CHHAGALNAIYA, FENI SADAR, FULGAZI, PARSHURAM | Feni-1, Feni-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Dhepa-Punarbhaba Water management project | JUL-06 JUN-12 | 2,121.01 1,821.59 | DINAJPUR | BIRAL, KAHAROLE | Dinajpur-1, Dinajpur-2 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Dhepa River Left Bank FCDI project | JUL-10 JUN-12 | 2,285.63 1,551.24 | DINAJPUR | DINAJPUR SADAR, KAHAROLE | Dinajpur-1, Dinajpur-3 | Completed | |
| BANK PROTECTION | Protection of Teesta River left bank from Teesta Barrage to Chandimari (Phase-1) | JUL-08 JUN-13 | 15,061.45 12,858.69 | KURIGRAM | BHURUNGAMARI, KURIGRAM SADAR, NAGESHWARI | Kurigram-1, Kurigram-2 | Completed | |
| DRAINAGE | Rehabilitation of Bhutiar beel & barnal salimpur kolabashukhali flood control & drainage project in khulna district | JUL-07 JUN-13 | 1,881.89 1,881.67 | KHULNA, NARAIL | DIGHALIA, KALIA, RUPSA, TEROKHADA | Khulna-4, Narail-1 | Completed | |
| TOWN PROTECTION | Bhairab Bandar Protection Project | JUL-09 JUN-13 | 2,392.21 2,232.33 | KISHOREGANJ | BHAIRAB | Kishoreganj-6 | Completed | |
| IRRIGATION | Matamuhuri Irragation Project (Phase-2) | JUL-06 JUN-13 | 6,220.48 6,216.90 | COX'S BAZAR | CHAKARIA, PEKUA | Cox's Bazar-1 | Completed | |
| TOWN PROTECTION | River Bank Protection & Development and Town Protection Project (Phase-4) | JUL-08 JUN-15 | 19,133.81 16,654.59 | BARGUNA, BARISHAL, BHOLA, BOGURA, CHANDPUR, CHAPAI NAWABGANJ, CHATTOGRAM, COX'S BAZAR, CUMILLA, FARIDPUR, FENI, GAIBANDHA, JAMALPUR, JHALOKATHI, KHAGRACHHARI, KHULNA, KURIGRAM, LALMONIRHAT, MADARIPUR, MAGURA, MANIKGANJ, MOULVIBAZAR, MYMENSINGH, NATORE, NILPHAMARI, NOAKHALI, PABNA, PATUAKHALI, PIROJPUR, RAJBARI, RANGAMATI, RANGPUR, SATKHIRA, SUNAMGANJ, SYLHET, TANGAIL | AGAILJHARA, ASSASUNI, BAKERGANJ, BALAGANJ, BALIAKANDI, BARISHAL SADAR (KOTWALI), BAUPHAL, BHANGURA, BURHANUDDIN, CHANDANAISH, CHANDPUR SADAR, CHAPAI NABABGANJ SADAR, CHATMOHAR, COMPANIGANJ, COX'S BAZAR SADAR, DEBIDWAR, DIGHINALA, DIMLA, DOMAR, DUMKI, FARIDPUR SADAR, FENCHUGANJ, FENI SADAR, GABTALI, GAFFARGAON, GANGACHARA, GHIOR, GURUDASPUR, HATHAZARI, HATIBANDHA, JALDHAKA, JAMALGANJ, JAMALPUR SADAR, KALAPARA, KALIGANJ, KALIHATI, KAMALGANJ, KANAIGHAT, KARNAFULI, KAWKHALI (BETBUNIA), KISHOREGANJ, KOYRA, KULAURA, LOHAGARA, MADARIPUR SADAR, MADHUKHALI, MAHESHKHALI, MATHBARIA, MATIRANGA, MOHAMMADPUR, MURADNAGAR, NALCHITY, NANIARCHAR, NESARABAD (SWARUPKATI), PANCHHARI, PATGRAM, PATHARGHATA, PATIYA, PEKUA, PIROJPUR SADAR, RAJARHAT, RAJOIR, RAMU, RANGUNIA, RAOZAN, SATKANIA, SINGRA, SREEPUR, SUNAMGANJ SADAR, SUNDARGANJ, TITAS, ULIPUR, ZAKIGANJ | Barguna-2, Barishal-1, Barishal-5, Barishal-6, Bhola-2, Bogura-7, Chandpur-3, Chapainawabganj-3, Chattogram-12, Chattogram-13, Chattogram-14, Chattogram-15, Chattogram-5, Chattogram-6, Chattogram-7, Cox's Bazar-1, Cox's Bazar-2, Cox's Bazar-3, Cumilla-2, Cumilla-3, Cumilla-4, Faridpur-1, Faridpur-3, Feni-2, Gaibandha-1, Jamalpur-5, Jhalokathi-2, Khagrachhari, Khulna-6, Kurigram-2, Kurigram-3, Lalmonirhat-1, Lalmonirhat-2, Madaripur-2, Magura-1, Magura-2, Manikganj-1, Moulvibazar-2, Mymensingh-10, Natore-3, Natore-4, Nilphamari-1, Nilphamari-3, Nilphamari-4, Noakhali-5, Pabna-3, Patuakhali-1, Patuakhali-2, Patuakhali-4, Pirojpur-1, Pirojpur-3, Rajbari-2, Rangamati, Rangpur-1, Satkhira-3, Sunamganj-1, Sunamganj-4, Sylhet-2, Sylhet-3, Sylhet-5, Tangail-4 | Completed | |
| TOWN PROTECTION | Faridpur Town Protection Project | JUL-09 JUN-14 | 17,654.21 16,147.18 | FARIDPUR | FARIDPUR SADAR | Faridpur-3 | Completed | |
| TOWN PROTECTION | Protection of Faridpur FCD Project (Arca-l) from crosant of Padma River at Bakshipur-Sengram ares in Rajbari District, Bank protection of Nahoganga River at Mohajan Bazar area in Narail District and River bank erosinn protection of the Coral Rivier al Koksha and Kamarkhali Uporilla onder Kushtia District | JUL-09 JUN-14 | 9,835.05 8,583.65 | KUSHTIA, NARAIL, RAJBARI | KALIA, KHOKSA, KUMARKHALI, PANGSHA | Kushtia-4, Narail-1, Rajbari-2 | Completed | |
| TOWN PROTECTION | Protection of Chandpur Irrigation Project (Meghna River at Haimchar) | JUL-09 JUN-14 | 18,388.74 16,663.12 | BRAHMANBARIA, CHANDPUR | BANCHHARAMPUR, HAIM CHAR | Brahmanbaria-6, Chandpur-3 | Completed | |
| TOWN PROTECTION | Protection of Chandpur Irrigation Project (Meghna River at Ibrahimpur-Sakhua) | JUL-09 JUN-15 | 17,095.48 16,228.27 | CHANDPUR | CHANDPUR SADAR | Chandpur-3 | Completed | |
| BANK PROTECTION | River Bank Protection at tamaruddin and banglabazar of polder 73 (A+B) (Noakhali) | JUL-09 JUN-14 | 6,059.22 5,349.26 | NOAKHALI | HATIYA | Noakhali-6 | Completed | |
| BANK PROTECTION | Bank Protection work along the left bank of Madumati River at Fukra and along the both banks of MBR Channel at koligram and mankikdhaha in Gopalganj District | JUL-10 JUN-14 | 3,518.83 3,513.62 | GOPALGANJ | GOPALGANJ SADAR, KASHIANI, MUKSUDPUR | Gopalganj-1, Gopalganj-2 | Completed | |
| REHABILATATION | Rehabilitation Works of Teesta Main Canal and Related Structure under Command Area of Teesta Barrage Project (Phase-I) | JUL-12 JUN-14 | 1,464.50 1,246.50 | NILPHAMARI | DIMLA, JALDHAKA, KISHOREGANJ | Nilphamari-1, Nilphamari-3, Nilphamari-4 | Completed | |
| FEASIBILITY STUDY | Main River Flood and Bank Erosion Risk Management Program | JUL-12 JUN-14 | 1,569.69 978.80 | MANIKGANJ, PABNA, SIRAJGANJ | BERA, CHAUHALI, HARIRAMPUR, SHAHJADPUR, SHIBALAYA | Manikganj-1, Manikganj-2, Pabna-1, Sirajganj-5, Sirajganj-6 | Completed | |
| FEASIBILITY STUDY | Irrigation Management Improvement Investment Program (IMIIP) | JUL-12 JUN-14 | 698.16 659.65 | CHATTOGRAM, FENI | CHHAGALNAIYA, FENI SADAR, FULGAZI, MIRSHARAI, PARSHURAM, SONAGAZI | Chattogram-1, Feni-1, Feni-2, Feni-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Upper Surma-Kushiyara Project (3rd Revised) | JUL-01 JUN-14 | 14,458.46 11,025.36 | SYLHET | BEANI BAZAR, FENCHUGANJ, GOLAPGANJ, KANAIGHAT, SYLHET SADAR, ZAKIGANJ | Sylhet-1, Sylhet-3, Sylhet-5, Sylhet-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | New Dakatoa and Old Dakatia- Little Feni River Drainage Project | JUL-03 JUN-17 | 28,052.38 7,018.80 | CHANDPUR, CUMILLA, FENI, NOAKHALI | BARURA, CHANDPUR SADAR, CHAUDDAGRAM, COMPANIGANJ, CUMILLA ADARSHA SADAR, DAGANBHUIYAN, FARIDGANJ, FENI SADAR, HAJIGANJ, KACHUA, LAKSAM, NANGALKOT, SHAHRASTI, SONAGAZI | Chandpur-1, Chandpur-3, Chandpur-4, Chandpur-5, Cumilla-10, Cumilla-11, Cumilla-6, Cumilla-8, Cumilla-9, Feni-2, Feni-3, Noakhali-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Water Management Improvment Project (WMIP) | JUL-04 DEC-16 | 81,595.11 62,420.56 | BAGERHAT, BARGUNA, BARISHAL, BHOLA, BOGURA, CHAPAI NAWABGANJ, CHATTOGRAM, COX'S BAZAR, CUMILLA, DHAKA, DINAJPUR, FARIDPUR, FENI, GAIBANDHA, GAZIPUR, GOPALGANJ, HABIGANJ, JAMALPUR, JOYPURHAT, KHULNA, KISHOREGANJ, LAKSHMIPUR, MADARIPUR, MAGURA, MOULVIBAZAR, MYMENSINGH, NAOGAON, NARAYANGANJ, NETROKONA, PANCHAGARH, PATUAKHALI, RAJBARI, RAJSHAHI, RANGPUR, SATKHIRA, SIRAJGANJ, SYLHET, TANGAIL, THAKURGAON | AKKELPUR, ASSASUNI, BADALGACHHI, BAGERHAT SADAR, BAKERGANJ, BALAGANJ, BALIAKANDI, BANIACHONG, BANSHKHALI, BARGUNA SADAR, BAUPHAL, BETAGI, BHALUKA, BHOLA SADAR, BHOLAHAT, BIRGANJ, BOALMARI, BURHANUDDIN, CHAPAI NABABGANJ SADAR, CHAR FASSON, CHITALMARI, COX'S BAZAR SADAR, CUMILLA ADARSHA SADAR, DASHMINA, DAULAT KHAN, DEBHATA, DEBIGANJ, DHAMOIRHAT, DUMKI, FAKIRHAT, FATIKCHHARI, FULCHHARI, FULGAZI, GAIBANDHA SADAR, GALACHIPA, GODAGARI, GOMASTAPUR, GOPALGANJ SADAR, GOWAINGHAT, HARIPUR, HOSSAINPUR, JAINTIAPUR, JAMALPUR SADAR, KAHALOO, KALAPARA, KALIGANJ, KALIHATI, KALKINI, KARIMGANJ, KATIADI, KERANIGANJ, KISHOREGANJ SADAR, KOTALIPARA, KOYRA, KULAURA, KUTUBDIA, LAKSHMIPUR SADAR, LALMOHAN, LOHAGARA, MADARGANJ, MADARIPUR SADAR, MADHUKHALI, MAGURA SADAR, MAHADEBPUR, MAHESHKHALI, MANPURA, MELANDAHA, MIRZAGANJ, MOLLAHAT, MORRELGANJ, MUKTAGACHHA, MYMENSINGH SADAR, NACHOLE, NAGARKANDA, NAOGAON SADAR, NETROKONA SADAR, PABA, PAKUNDIA, PARSHURAM, PATNITALA, PATUAKHALI SADAR, PIRGACHHA, PIRGANJ, RAJOIR, RAMPAL, RANINAGAR, RUPGANJ, SALTHA, SARANKHOLA, SARISHABARI, SATKHIRA SADAR, SHALIKHA, SHIBGANJ, SHYAMNAGAR, SIRAJGANJ SADAR, SREEPUR, TALA, TANORE, TEKNAF, THAKURGAON SADAR, TRISHAL, TUNGIPARA, UKHIA, WAZIRPUR | Bagerhat-1, Bagerhat-2, Bagerhat-3, Bagerhat-4, Barguna-1, Barguna-2, Barishal-2, Barishal-6, Bhola-1, Bhola-2, Bhola-3, Bhola-4, Bogura-4, Chapainawabganj-1, Chapainawabganj-2, Chapainawabganj-3, Chattogram-15, Chattogram-16, Chattogram-2, Cox's Bazar-2, Cox's Bazar-3, Cox's Bazar-4, Cumilla-6, Dhaka-3, Dinajpur-1, Faridpur-1, Faridpur-2, Feni-1, Gaibandha-2, Gaibandha-5, Gazipur-3, Gazipur-5, Gopalganj-2, Gopalganj-3, Habiganj-2, Jamalpur-3, Jamalpur-4, Jamalpur-5, Joypurhat-2, Khulna-6, Kishoreganj-1, Kishoreganj-2, Kishoreganj-3, Lakshmipur-3, Madaripur-2, Madaripur-3, Magura-1, Magura-2, Moulvibazar-2, Mymensingh-11, Mymensingh-4, Mymensingh-5, Mymensingh-7, Naogaon-2, Naogaon-3, Naogaon-5, Naogaon-6, Narayanganj-1, Netrokona-2, Panchagarh-2, Patuakhali-1, Patuakhali-2, Patuakhali-3, Patuakhali-4, Rajbari-2, Rajshahi-1, Rajshahi-3, Rangpur-4, Rangpur-6, Satkhira-1, Satkhira-2, Satkhira-3, Satkhira-4, Sirajganj-2, Sylhet-2, Sylhet-4, Tangail-4, Thakurgaon-1, Thakurgaon-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Emargency 2007- Cyclon Recovery & Restoration Project (ECRRP) | JUL-08 DEC-18 | 75,050.00 18,648.76 | BARGUNA, PATUAKHALI, PIROJPUR | AMTALI, BAMNA, BARGUNA SADAR, BETAGI, BHANDARIA, DASHMINA, GALACHIPA, KALAPARA, MATHBARIA, PATHARGHATA, RANGABALI | Barguna-1, Barguna-2, Patuakhali-3, Patuakhali-4, Pirojpur-2, Pirojpur-3 | Completed | |
| RIVER DREDGING | Gorai River Restoration Project (Phase-2) | JUL-09 JUN-17 | 65,496.31 50,463.56 | KUSHTIA | KHOKSA, KUMARKHALI, KUSHTIA SADAR | Kushtia-3, Kushtia-4 | Completed | |
| TOWN PROTECTION | Charfession & Monpura Town protection project in Bhola district | JUL-09 JUN-17 | 16,804.59 4,234.21 | BHOLA | CHAR FASSON, MANPURA | Bhola-4 | Completed | |
| TOWN PROTECTION | Protection of shahbazpur gas field from erosion of the meghna river under Borhanuddin upazilla of Bhola District (Phase-2) | MAR-10 JUN-17 | 21,687.09 8,486.94 | BHOLA | BURHANUDDIN | Bhola-2 | Completed | |
| TOWN PROTECTION | Protection Of Left Bank of the Jamuna River From Bahadurabad Ghat to Futani Bazar in Dewangonj & Islampur Upazila, Pingna Bazar Area in Sharishabari Upazila And From Horindhara to Hargila in Islampur Upazila Under Jamalpur District (2nd Revised). | JUL-09 JUN-17 | 48,949.40 30,681.46 | JAMALPUR | DEWANGANJ, ISLAMPUR, SARISHABARI | Jamalpur-1, Jamalpur-2, Jamalpur-4 | Completed | |
| RIVER DREDGING | Capital (Pilot) Dredging of River system in Bangladesh | MAR-10 JUN-17 | 102,211.44 74,776.52 | JAMALPUR, SIRAJGANJ, TANGAIL | BELKUCHI, BHUAPUR, GOPALPUR, KALIHATI, SARISHABARI, SIRAJGANJ SADAR | Jamalpur-4, Sirajganj-2, Sirajganj-5, Tangail-2, Tangail-4 | Completed | |
| RIVER DREDGING | Buriganga River Restoration (New Dhaleswari-Pungli-Bangshi-Turag-Buriganga River system) Project (2nd Revised) | JUL-16 JUN-22 | 112,559.33 11,616.04 | DHAKA, GAZIPUR, TANGAIL | BASAIL, GAZIPUR SADAR, KALIAKAIR, KALIHATI, KERANIGANJ, MIRPUR, MIRZAPUR, MOHAMMADPUR, PALLABI, SAVAR, TANGAIL SADAR | Dhaka-13, Dhaka-14, Dhaka-16, Dhaka-19, Dhaka-3, Gazipur-1, Gazipur-3, Tangail-4, Tangail-5, Tangail-7, Tangail-8 | Completed | |
| RIVER DREDGING | Excavation of Chandana-Barasia River | JUL-10 JUN-15 | 5,946.37 4,504.86 | FARIDPUR, GOPALGANJ, RAJBARI | ALFADANGA, BALIAKANDI, BOALMARI, KASHIANI, MADHUKHALI, PANGSHA | Faridpur-1, Gopalganj-2, Rajbari-2 | Completed | |
| EQUIPMENT PURCHASE | বাংলাদেশের নদী ড্রেজিং-এর জন্য ড্রেজার ও আনুষাঙ্গিক যন্ত্রপাতি ক্রয় | JUL-10 JUN-14 | 130,988.00 19,787.13 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Rehabilitation of BWDB Infrastructures Damaged by Cyclone Aila in Coastal Area | JUL-10 JUN-15 | 37,754.61 30,401.08 | BAGERHAT, CHANDPUR, KHULNA, SATKHIRA | ASSASUNI, BAGERHAT SADAR, BATIAGHATA, CHITALMARI, DACOPE, DEBHATA, DIGHALIA, DUMURIA, FAKIRHAT, KACHUA, KALIGANJ, KHULNA SADAR, KOYRA, MOLLAHAT, MORRELGANJ, PAIKGACHHA, RAMPAL, RUPSA, SARANKHOLA, SATKHIRA SADAR, SHYAMNAGAR, TALA | Bagerhat-1, Bagerhat-2, Bagerhat-3, Bagerhat-4, Chandpur-1, Khulna-1, Khulna-2, Khulna-4, Khulna-5, Khulna-6, Satkhira-1, Satkhira-2, Satkhira-3, Satkhira-4 | Completed | |
| RIVER DREDGING | Re-excavation of langan bemalia & Balabhadra river under Bramanbaria & Habiganj District | NOV-10 JUN-15 | 4,974.18 639.65 | BRAHMANBARIA, HABIGANJ | LAKHAI, NASIRNAGAR | Brahmanbaria-1, Habiganj-3 | Completed | |
| TOWN PROTECTION | Protectin of the Right Bank of Jumana River at Sirajganj Sadar and Kazipur (1st Revised) | NOV-05 JUN-17 | 42,081.73 12,031.78 | SIRAJGANJ | KAZIPUR, SIRAJGANJ SADAR | Sirajganj-1, Sirajganj-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Rehabilitation and Strengthening of Embankment on both sides of Gumti River | JUL-10 JUN-15 | 6,780.52 4,391.52 | CUMILLA | BRAHMAN PARA, BURICHANG, CUMILLA ADARSHA SADAR, DEBIDWAR, MURADNAGAR, TITAS | Cumilla-2, Cumilla-3, Cumilla-4, Cumilla-5, Cumilla-6 | Completed | |
| TOWN PROTECTION | Protection of Shaghata Bazar and Adjacent Area in Kurigram | JUL-10 JUN-16 | 18,691.80 8,275.97 | GAIBANDHA, KURIGRAM | RAUMARI, SAGHATA | Gaibandha-5, Kurigram-4 | Completed | |
| TOWN PROTECTION | River Bank protective work of left bank erosion of the Padma river at different places in Sujanagar Upazilla and right bank erosion of Jamuna river from Nagarbari to Kazirhat in Bera Upazilla of Pabna district (1st Revised) | JUL-10 JUN-17 | 21,906.63 7,699.07 | PABNA | BERA, SUJANAGAR | Pabna-1, Pabna-2 | Completed | |
| EQUIPMENT PURCHASE | Procurement of 6 dregers and ancillary crafts for MoWR and MoS | AUG-10 SEP-14 | 23,782.30 0.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Kalni-Kushiyara River Management Project (2nd Revised) | APR-11 JUN-19 | 35,989.89 2,502.71 | HABIGANJ, KISHOREGANJ, MOULVIBAZAR, SUNAMGANJ, SYLHET | AJMIRIGANJ, AUSTAGRAM, BANIACHONG, BISHWANATH, DERAI, FENCHUGANJ, HABIGANJ SADAR, ITNA, JAGANNATHPUR, LAKHAI, MAULVIBAZAR SADAR, MITHAMAIN, NABIGANJ, NIKLI, SULLA, SYLHET SADAR | Habiganj-1, Habiganj-2, Habiganj-3, Kishoreganj-4, Kishoreganj-5, Moulvibazar-3, Sunamganj-2, Sunamganj-3, Sylhet-1, Sylhet-2, Sylhet-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Right Bank of Jamuna River at Antarpara, Daripara and Adjacent Area (Bogra) | NOV-10 JUN-16 | 11,770.00 8,120.57 | BOGURA | DHUNAT, SARIAKANDI | Bogura-1, Bogura-5 | Completed | |
| LAND RECLAMATION | Char Development and Settlement Project-4 (CDSP-4) (BWDB Part) | JAN-11 DEC-19 | 31,346.38 10,237.24 | CHATTOGRAM, NOAKHALI, SYLHET | COMPANIGANJ, HATIYA, SANDWIP, SUBARNACHAR | Chattogram-3, Noakhali-4, Noakhali-6, Sylhet-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Pre-monsoon Flood Protection and drainage improvement in Haor Areas | JUL-11 JUN-19 | 58,729.63 5,630.47 | HABIGANJ, KISHOREGANJ, MOULVIBAZAR, SUNAMGANJ, SYLHET | AUSTAGRAM, BAJITPUR, BANIACHONG, BEANI BAZAR, BISHWAMBARPUR, DERAI, DHARAMPASHA, DOWARABAZAR, GOLAPGANJ, JAGANNATHPUR, JAMALGANJ, KANAIGHAT, MAULVIBAZAR SADAR, NABIGANJ, SHANTIGANJ (DAKSHIN SUNAMGANJ), SREEMANGAL, SULLA, SYLHET SADAR, TAHIRPUR, ZAKIGANJ | Habiganj-1, Habiganj-2, Kishoreganj-4, Kishoreganj-5, Moulvibazar-3, Moulvibazar-4, Sunamganj-1, Sunamganj-2, Sunamganj-3, Sunamganj-4, Sunamganj-5, Sylhet-1, Sylhet-5, Sylhet-6 | Completed | |
| DRAINAGE | Removal of Drainage congestion from kobadak river basin (Phase-2) (1st revised) | JUL-11 JUN-15 | 28,611.50 5,373.31 | JASHORE, KHULNA, SATKHIRA | CHAUGACHHA, JASHORE SADAR, JHIKARGACHHA, KALAROA, KESHABPUR, MANIRAMPUR, PAIKGACHHA | Jashore-2, Jashore-3, Jashore-5, Jashore-6, Khulna-6, Satkhira-1 | Completed | |
| TOWN PROTECTION | Excavation of a Pilot Channel at the Downstream of Feni Regulator under Sonagazi Upazila | JUL-11 JUN-15 | 6,620.93 4,546.09 | CHATTOGRAM, FENI | MIRSHARAI, SONAGAZI | Chattogram-1, Feni-3 | Completed | |
| TOWN PROTECTION | Naogaon Town Protection Project | JUL-11 JUN-16 | 8,008.00 3,461.94 | NAOGAON | NAOGAON SADAR | Naogaon-5 | Completed | |
| DRAINAGE | Removal of Drainage Congestion From the beels adjacent to bhabodah area under Jessroe | JUL-12 JUN-16 | 11,586.58 6,866.18 | JASHORE | ABHAYNAGAR, JASHORE SADAR, KESHABPUR, MANIRAMPUR | Jashore-3, Jashore-4, Jashore-5, Jashore-6 | Completed | |
| TOWN PROTECTION | Protection of Right Bank Of the Jamuna River in Bogra | JAN-12 JUN-16 | 23,474.00 6,200.82 | BOGURA | DHUNAT, SARIAKANDI | Bogura-1, Bogura-5 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Integrated Water Management Project polder 34-2 | JUL-12 JUN-16 | 16,726.12 995.00 | BAGERHAT, KHULNA | BAGERHAT SADAR, BATIAGHATA, FAKIRHAT, MONGLA, RAMPAL | Bagerhat-1, Bagerhat-2, Bagerhat-3, Khulna-1 | Completed | |
| TOWN PROTECTION | Protection of alatuli area of Chapainawabganj district from the erosion of the padma river (2nd Revised) | SEP-12 JUN-18 | 28,011.80 1,622.32 | CHAPAI NAWABGANJ | CHAPAI NABABGANJ SADAR | Chapainawabganj-3 | Completed | |
| TOWN PROTECTION | Protection of sonahat bridge and bhurungamari madarganj road from the erosion of dudhkumar river at bhurungamari upazila & bank revetment work at left bank of teesta river from gunaigach to bazra senior madrasha at ulipur upazila in kurigram district (2nd revised). | JUL-12 JUN-17 | 5,480.27 1,898.04 | KURIGRAM | BHURUNGAMARI, ULIPUR | Kurigram-1, Kurigram-3 | Completed | |
| TOWN PROTECTION | Bhola District Town Protection Project (Phase-3) | NOV-12 JUN-16 | 10,328.83 3,704.80 | BHOLA | BHOLA SADAR | Bhola-1 | Completed | |
| TOWN PROTECTION | Protection of Louhajong upazila complex area under louhajong upazila in munshiganj district from the erosion of the river padma | JAN-13 DEC-15 | 2,447.00 1,297.20 | MUNSHIGANJ | LOHAJANG | Munshiganj-2 | Completed | |
| TOWN PROTECTION | Protection of the Left Bank of Padma River from Komorpur to Shara-Jhaudia in Ishwardi Upazila under Pabna District and Tilokpur to Gouripur in Lalpur Upazila under Natore District (1st revised). | JAN-13 JUN-17 | 22,604.91 58.10 | NATORE, PABNA | ISHWARDI, LALPUR | Natore-1, Pabna-4 | Completed | |
| TOWN PROTECTION | Protection of brahmaputra river right bank at bairagirhat and chilmari bandar area of chilmari & ulipur upazila in kurigram district (phase-2) (1st revised). | NOV-12 JUN-17 | 25,691.79 3,591.88 | KURIGRAM | CHILMARI, ULIPUR | Kurigram-3, Kurigram-4 | Completed | |
| OTHERS | Pani Bhaban Construction Project (1st Phase) (2nd Revised) | JUL-13 JUN-19 | 26,082.00 0.00 | DHAKA | TEJGAON | Dhaka-12 | Completed | |
| TOWN PROTECTION | Bank Protective Work along the left and right bank at different locations of Karnafuli River, Boa.chali & Raikhali Khal in Chittagong District. | JUL-13 JUN-17 | 7,198.61 149.60 | CHATTOGRAM | BOALKHALI, RAOZAN | Chattogram-6, Chattogram-8 | Completed | |
| TOWN PROTECTION | River bank protection of vulnerable part at lalmohan upazila under bhola district (Phase-2) | JUL-13 JUN-17 | 13,422.51 0.00 | BHOLA | LALMOHAN | Bhola-3 | Completed | |
| TOWN PROTECTION | Protection of both bank of barnai River at Kaliganj-Sharkutia & Kaliganj-Sadhanpur (Natore) | JUL-13 JUN-16 | 1,960.78 0.00 | NATORE | NATORE SADAR, SINGRA | Natore-2, Natore-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Blue Gold Programme (BWDB Component) (1st Revised) | JAN-13 JUN-22 | 60,336.90 5,106.20 | BARGUNA, KHULNA, PATUAKHALI, SATKHIRA | AMTALI, BATIAGHATA, DACOPE, DUMURIA, GALACHIPA, KALAPARA, KOYRA, PAIKGACHHA, PATUAKHALI SADAR, SATKHIRA SADAR | Barguna-1, Khulna-1, Khulna-5, Khulna-6, Patuakhali-1, Patuakhali-3, Patuakhali-4, Satkhira-2 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Coastal Embankment Improvement Project (Phase-1) | JUL-13 JUN-20 | 328,000.00 371.10 | BAGERHAT, BARGUNA, KHULNA, PATUAKHALI, PIROJPUR, SATKHIRA | BAGERHAT SADAR, BARGUNA SADAR, BHANDARIA, DACOPE, DUMURIA, GALACHIPA, KALAPARA, KOYRA, MATHBARIA, MORRELGANJ, PAIKGACHHA, PATHARGHATA, RAMPAL, SARANKHOLA, SHYAMNAGAR, TALA | Bagerhat-2, Bagerhat-3, Bagerhat-4, Barguna-1, Barguna-2, Khulna-1, Khulna-5, Khulna-6, Patuakhali-3, Patuakhali-4, Pirojpur-2, Pirojpur-3, Satkhira-1, Satkhira-4 | Completed | |
| FEASIBILITY STUDY | Environmental Impact Assessment (EIA) study of different BWDB projects to be Implemented under CCTF | AUG-13 DEC-14 | 199.16 50.00 | Completed | ||||
| IRRIGATION | Southwest Area Integrated Water Resousces Planning and Management Project (SWAIWRPMP) | APR-05 JUN-15 | 29,425.53 26,951.56 | CHATTOGRAM, JASHORE, KHULNA, NARAIL, SATKHIRA | ABHAYNAGAR, DACOPE, KALIA, KALIGANJ, LOHAGARA, NARAIL SADAR, SHYAMNAGAR | Chattogram-15, Jashore-4, Khulna-1, Narail-1, Narail-2, Satkhira-4 | Completed | |
| IRRIGATION | Teesta Barrage Project (Phase-2) Unit-1 (3rd Revised) | JUL-06 JUN-18 | 41,332.57 18,564.80 | DINAJPUR, NILPHAMARI, RANGPUR | BADARGANJ, KISHOREGANJ, PARBATIPUR, SAIDPUR, TARAGANJ | Dinajpur-5, Nilphamari-4, Rangpur-2 | Completed | |
| IRRIGATION | Re-excavation of Connecting Rivers, Development of Irrigation Facilities & Fish Culture Project of Gazner Beel Area under Sujanagar Upazila in Pabna District (BWDB Part) (3rd Revised) | JAN-10 JUN-19 | 43,926.84 5,652.45 | PABNA | BERA, SANTHIA, SUJANAGAR | Pabna-1, Pabna-2 | Completed | |
| IRRIGATION | Tarail-Pachuria Flood Control, Drainage and Irrigation project (Phase-2) | MAR-10 JUN-14 | 32,201.20 10,625.07 | GOPALGANJ | GOPALGANJ SADAR, KOTALIPARA, TUNGIPARA | Gopalganj-2, Gopalganj-3 | Completed | |
| IRRIGATION | Construction of Additional Pump station at Goranchatbari | APR-10 JUN-15 | 8,890.73 6,421.77 | DHAKA | PALLABI, RUPNAGAR | Dhaka-14, Dhaka-16 | Completed | |
| IRRIGATION | Surma River Bank Flood Control Drainage and Irrigation Project | JUL-11 JUN-15 | 4,728.00 2,795.89 | SYLHET | GOLAPGANJ, JAINTIAPUR, KANAIGHAT, SYLHET SADAR | Sylhet-1, Sylhet-4, Sylhet-5, Sylhet-6 | Completed | |
| IRRIGATION | Rehabilitation of Ganges Kobadak Irrigation project | SEP-12 JUN-16 | 22,368.75 6,347.00 | CHUADANGA, JHENAIDAH, KUSHTIA, MAGURA | ALAMDANGA, BHERAMARA, CHUADANGA SADAR, DAULATPUR, HARINAKUNDA, JHENAIDAH SADAR, KHOKSA, KUMARKHALI, KUSHTIA SADAR, MAGURA SADAR, MIRPUR, SHAILKUPA, SREEPUR | Chuadanga-1, Jhenaidah-1, Jhenaidah-2, Kushtia-1, Kushtia-2, Kushtia-3, Kushtia-4, Magura-1 | Completed | |
| IRRIGATION | খুলনা জেলার ভূতিয়ার বিল এবং বর্ণাল সলিমপুর কোলাবাসুখালী বন্যা নিয়ন্ত্রণ ও নিষ্কাশন প্রকল্প | OCT-13 JUN-18 | 28,190.16 599.40 | KHULNA, NARAIL | DIGHALIA, KALIA, RUPSA, TEROKHADA | Khulna-4, Narail-1 | Completed | |
| IRRIGATION | Integrated Flood Control Drainage and Irrigation Project Karatoa River (Dinapur) | JUL-13 JUN-15 | 2,554.91 700.00 | DINAJPUR | GHORAGHAT, NAWABGANJ | Dinajpur-6 | Completed | |
| RIVER DREDGING | Bhairab River Re-excavation Project | JUL-14 JUN-17 | 7,382.84 0.00 | MEHERPUR | MEHERPUR SADAR, MUJIB NAGAR | Meherpur-1 | Completed | |
| FEASIBILITY STUDY | Development Phase of Water Management Infrastructure in Bhola District (DWMIP) | JAN-13 JUN-15 | 1,529.02 1,257.04 | BHOLA | BHOLA SADAR, BURHANUDDIN, CHAR FASSON, DAULAT KHAN, LALMOHAN, TAZUMUDDIN | Bhola-1, Bhola-2, Bhola-3, Bhola-4 | Completed | |
| BANK PROTECTION | Protection of Ramgoti and Kamal Nagar Upazila and Adjacent Areas Under Lakshmipur District from the Continuing Erosion of Meghna River (Phase-l) | JUL-14 JUN-21 | 24,518.90 11,774.14 | LAKSHMIPUR | KAMALNAGAR, RAMGATI | Lakshmipur-4 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Flood and River Bank Erosion Risk Management Investment Program | JUL-14 JUN-18 | 82,856.00 4,355.60 | MANIKGANJ, SIRAJGANJ, TANGAIL | CHAUHALI, HARIRAMPUR, NAGARPUR, SHAHJADPUR, SHIBALAYA | Manikganj-1, Manikganj-2, Sirajganj-5, Sirajganj-6, Tangail-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Haor Flood Management and Livelihood Improvement Project (BWDB Part) | JUL-14 JUN-22 | 99,337.72 2,912.58 | BRAHMANBARIA, HABIGANJ, KISHOREGANJ, MYMENSINGH, NETROKONA, SUNAMGANJ | AJMIRIGANJ, ATPARA, AUSTAGRAM, BAHUBAL, BAJITPUR, BANCHHARAMPUR, BANIACHONG, BARHATTA, CHHATAK, DHARAMPASHA, HABIGANJ SADAR, HOSSAINPUR, ITNA, JAMALGANJ, KALMAKANDA, KARIMGANJ, KATIADI, KENDUA, KHALIAJURI, KISHOREGANJ SADAR, KULIAR CHAR, MADAN, MITHAMAIN, MOHANGANJ, NANDAIL, NETROKONA SADAR, NIKLI, PAKUNDIA, PURBADHALA, SHANTIGANJ (DAKSHIN SUNAMGANJ), SUNAMGANJ SADAR, TARAIL | Brahmanbaria-6, Habiganj-1, Habiganj-2, Habiganj-3, Kishoreganj-1, Kishoreganj-2, Kishoreganj-3, Kishoreganj-4, Kishoreganj-5, Kishoreganj-6, Mymensingh-9, Netrokona-1, Netrokona-2, Netrokona-3, Netrokona-4, Netrokona-5, Sunamganj-1, Sunamganj-3, Sunamganj-4, Sunamganj-5 | Completed | |
| BANK PROTECTION | Bank Revetment work at the left and right bank of Jamuneswary, Chcikly & Charalkata River in Kishoregonj, Taragonj & Badargonj Upazilla. | JAN-15 JUN-17 | 8,355.27 0.00 | NILPHAMARI, RANGPUR | BADARGANJ, KISHOREGANJ, SAIDPUR, TARAGANJ | Nilphamari-4, Rangpur-2 | Completed | |
| IRRIGATION | West Gopalganj integrated water management project | JUL-14 JUN-16 | 13,410.82 2,000.00 | GOPALGANJ | GOPALGANJ SADAR, KASHIANI, MUKSUDPUR | Gopalganj-1, Gopalganj-2 | Completed | |
| IRRIGATION | Irrigation Management Improvement Program (IMIP) (For Muhuri Irrigation Project) (3rd Revised) | JUL-14 JUN-24 | 56,269.00 1,714.54 | CHATTOGRAM, FENI | CHHAGALNAIYA, FENI SADAR, FULGAZI, MIRSHARAI, PARSHURAM, SONAGAZI | Chattogram-1, Feni-1, Feni-2, Feni-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Maliara-bakhkhine-vandergaon flood control drainage and irrigaion project (2 phase) | OCT-15 JUN-17 | 2,477.73 | CHATTOGRAM | PATIYA | Chattogram-12 | Completed | |
| BANK PROTECTION | Protective work along the Right Bank of Padma River at Philipnagar, Abed's ghat and Islampur area of Daulatpur upazilla under the District Kushtia (1" Revised). | MAY-15 JUN-17 | 8,680.76 | KUSHTIA | KUSHTIA SADAR | Kushtia-3 | Completed | |
| BANK PROTECTION | strengthening of dumping zone of protective work of jamalpur town protection project in jamalpur sadar upazila of jamalpur district (1st revised). | FEB-16 JUN-18 | 2,216.96 | JAMALPUR, SHERPUR | JAMALPUR SADAR, SHERPUR SADAR | Jamalpur-5, Sherpur-1 | Completed | |
| BANK PROTECTION | Bank protective work with cc block along the both bank of shialjani khal from 0.00m to2000.00m at mohangonj municipal area of mohangonj upazila in netrakona district (1 revised). | JUL-16 JUN-18 | 1,712.93 | NETROKONA | MOHANGANJ | Netrokona-4 | Completed | |
| BANK PROTECTION | Temporary Bank Protective Work along the Left Bank of The Padma River at West Narisha Bazar & Meghula Bazar at Dohar Upazila in Diala District (1st Revised) | MAY-16 JUN-18 | 1,934.78 | DHAKA | DOHAR | Dhaka-1 | Completed | |
| BANK PROTECTION | Protection of left bank of meghna river through bank revetment work at maniknagar of nabinagar upazila in brahmanbaria district. | JUL-15 JUN-18 | 3,649.38 | BRAHMANBARIA | NABINAGAR | Brahmanbaria-5 | Completed | |
| REHABILATATION | Rehabilitation of Kashimpur pump house under Manu River Irrigation Project | JUL-16 JUN-18 | 8,416.00 | MOULVIBAZAR | RAJNAGAR | Moulvibazar-3 | Completed | |
| BANK PROTECTION | Bank protection work on the right bank of the matamuhuri river near alikadam sena nibas, Bandarbhan (1st revised) | DEC-15 JUN-18 | 1,890.00 | BANDARBAN | ALIKADAM | Bandarban | Completed | |
| BANK PROTECTION | Bank protection work of Korotoya river at Nazirganj & Doikhata Chitmohol (former) in Upazila Boda, District Panchagarh. | JAN-17 JUN-18 | 2,435.74 | PANCHAGARH | BODA | Panchagarh-2 | Completed | |
| TOWN PROTECTION | Protection of the Rajshahi Cadet College and adjacent important establishment from the erosion of the Padma River. | JUL-15 JUN-18 | 8,678.66 | RAJSHAHI | CHARGHAT | Rajshahi-6 | Completed | |
| BANK PROTECTION | Protection of bank from crosion of Atrai River in 3(three) nos, area in Upazila-Patnitala and Re-excavation of Polashbari Khal in Upazila-Manda under Naogaon District (1" Revised). | MAY-16 JUN-18 | 2,143.34 | NAOGAON | MANDA, PATNITALA | Naogaon-2, Naogaon-4 | Completed | |
| BANK PROTECTION | Bank protective work including dredging of char along the left bank of the madhumati river at dignagar/pabanbeg bazar alfadanga upazila in faridpur district. | JAN-17 JUN-18 | 2,167.84 | FARIDPUR | ALFADANGA | Faridpur-1 | Completed | |
| BANK PROTECTION | Protection of the "Kuthibari" and adjacent areas of Great Poet Robindranath Tagore along the Right Bank of Padma River under the Kushtia District. | MAY-15 JUN-18 | 18,068.20 | KUSHTIA | KUMARKHALI | Kushtia-4 | Completed | |
| RIVER DREDGING | Dredging of the Padma River in connection with the Protection of the "Kuthibari" of Great Poet Robindranath Tagore and its adjacent area under Kushtia District (1st Revised). | MAR-17 JUN-18 | 2,511.49 | KUSHTIA | KUMARKHALI | Kushtia-4 | Completed | |
| BANK PROTECTION | Protective work on the right bank of bhairab river at a length of 460.00 M ar bus titumir. | JUL-16 JUN-18 | 1,716.10 | KHULNA | KHALISHPUR, KHULNA SADAR | Khulna-2, Khulna-3 | Completed | |
| BANK PROTECTION | Bank protective work along Left bank conservation project of Padma River from Aurangabad to Brahabazar Ghat in Dohar Upazila of Dhaka District | JUL-15 JUN-19 | 21,762.05 | DHAKA | DOHAR | Dhaka-1 | Completed | |
| DRAINAGE | Drainage System Development Project in Dhaka-Narayanganj-Demra (DND) Area (Phase-2) | JUL-16 JUN-24 | 129,991.17 | DHAKA, NARAYANGANJ | DEMRA, JATRABARI, KADAMTALI, NARAYANGANJ SADAR, SHYAMPUR | Dhaka-4, Dhaka-5, Narayanganj-5 | Completed | |
| BANK PROTECTION | Shibpur Flood Control, Drainage Irrigation Project under Shibpur Upazila in Narsingdi District | JAN-15 JUN-19 | 5,085.23 | NARSINGDI | SHIBPUR | Narsingdi-3 | Completed | |
| BANK PROTECTION | River Bank Protection Project along the left bank of the Jamuna River from Kaolibari Bridge to Shakharia (Varua Bot tola) in Gopalpur & Bhuanpur Upazila of Tangail District (1st Revised). | MAR-17 JUN-21 | 21,534.53 | TANGAIL | BHUAPUR, GOPALPUR | Tangail-2 | Completed | |
| BANK PROTECTION | River Bank Protection of Arjuna Area from the erosion of Jamuna River in Bhuanpur upazila of Tangail District (1st Revised). | OCT-17 JUN-22 | 32,085.91 | TANGAIL | BHUAPUR | Tangail-2 | Completed | |
| TOWN PROTECTION | Protection of Bhuapur-Tarakandi Road through Protection of Left Bank of Jamuna River in Sharishabari Upazila of Jamalpur District (1 Revised). | JUL-17 JUN-21 | 20,076.74 | JAMALPUR | SARISHABARI | Jamalpur-4 | Completed | |
| FLOOD CONTROL | Construction of Crossdam at Hargila for protection of left bank of Jamuna River in Islampur Upazila of Jamalpur district(1st Revised). | JAN-18 JUN-20 | 3,070.07 | JAMALPUR | ISLAMPUR | Jamalpur-2 | Completed | |
| FLOOD CONTROL | Strengthening of vulnerable locations of haizda embankment in mohangonj upazila under netrokona district. | MAR-17 JUN-21 | 4,699.41 | NETROKONA | MOHANGANJ | Netrokona-4 | Completed | |
| RIVER DREDGING | Re-excavation project of Karjan Canal and adjacent branch canals in Comilla district for the development of irrigation and drainage system | JUL-15 JUN-19 | 1,515.91 | CUMILLA | BARURA, CHANDINA, LAKSAM | Cumilla-7, Cumilla-8, Cumilla-9 | Completed | |
| DRAINAGE AND IRRIGATION | Old Dakatia-New Dakatia River Irrigation and Drainage Project in the district Cumilla (1st Revised). | OCT-17 JUN-22 | 4,989.46 | CUMILLA | CHAUDDAGRAM, CUMILLA ADARSHA SADAR, CUMILLA SADAR DAKSHIN, LAKSAM, LALMAI, NANGALKOT | Cumilla-10, Cumilla-11, Cumilla-6, Cumilla-9 | Completed | |
| RIVER DREDGING | Re-excavation of Titas River (Upper) under Brahmanbaria District (1st Revised) | SEP-15 JUN-23 | 13,500.37 | BRAHMANBARIA | AKHAURA, BIJOYNAGAR, BRAHMANBARIA SADAR, NABINAGAR, NASIRNAGAR, SARAIL | Brahmanbaria-1, Brahmanbaria-2, Brahmanbaria-3, Brahmanbaria-4, Brahmanbaria-5 | Completed | |
| BANK PROTECTION | River bank protection work from the erosion of meghna river at swarnadwip (jahizzar char) in hatyia and subornachar upazila of noakhali district. | JAN-18 JUN-20 | 8,862.36 | NOAKHALI | HATIYA, SUBARNACHAR | Noakhali-4, Noakhali-6 | Completed | |
| BANK PROTECTION | Protection project on the banks of the South Satar River under Chagalnaiya and Fulgazi upazilas of Feni district and the Erosion of left bank of the Muhuri River in Manipur area | JAN-18 JUN-19 | 1,933.75 | FENI | CHHAGALNAIYA, FULGAZI | Feni-1 | Completed | |
| REHABILATATION | Rehabilitation of BWDB infrastructures Damaged by Natural Disaster in the Coastal Area of Polder No. 64/1A, 64/1B & 64/1C at Banskhali Upazilla in Chattogram District (2nd Revised). | JUL-15 JUN-22 | 29,360.69 | CHATTOGRAM | BANSHKHALI | Chattogram-16 | Completed | |
| BANK PROTECTION | River bank protection works on both b of sangu & chandkhali river in chandanaish and satka upazillas of chittagong district | JUL-15 JUN-19 | 15,056.49 | CHATTOGRAM | CHANDANAISH, SATKANIA | Chattogram-14 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Rehabilitation of BWDB infrastructures for erosion Protection, Drainage and Irrigation improvement in the Coastal Area of Polder No. 61/1 (Sitakunda), 61/2 (Mirersarai) & 72 (Sandwip) in Chittagong District. | JUL-16 JUN-19 | 9,539.78 | CHATTOGRAM | MIRSHARAI, SANDWIP, SITAKUNDA | Chattogram-1, Chattogram-3, Chattogram-4 | Completed | |
| BANK PROTECTION | Rehabilitation of Erosion Prone area with slope protection work in Polder No-72, Sandwip, Chattogram (1st Revised). | JUL-17 JUN-22 | 21,930.83 | CHATTOGRAM | SANDWIP | Chattogram-3 | Completed | |
| REHABILATATION | Rehabilitation of Damaged polders under the district of cox`s bazar (2nd Revised) | JUL-15 JUN-21 | 36,220.82 | COX'S BAZAR | CHAKARIA, COX'S BAZAR SADAR, KUTUBDIA, MAHESHKHALI, PEKUA, TEKNAF | Cox's Bazar-1, Cox's Bazar-2, Cox's Bazar-3, Cox's Bazar-4 | Completed | |
| BANK PROTECTION | Re-construction of embankment with protective work in polder no. 68 of shahaparir dwip (sea-dyke) in upazila-teknaf & ukhiya, district-cox's bazar (2nd revised). | JUL-16 JUN-19 | | COX'S BAZAR | TEKNAF | Cox's Bazar-4 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Bakkhali River flood control, Drainage, Irrigation & Dredging Project (Phase-1) in Cox`s Bazar district (1st Revised) | OCT-16 JUN-21 | 19,543.95 | COX'S BAZAR | COX'S BAZAR SADAR, RAMU | Cox's Bazar-3 | Completed | |
| BANK PROTECTION | Project to protect the right bank of Teesta River from erosion in Gangachara and Rangpur Sadar Upazilas of Rangpur District | APR-16 JUN-19 | 16,883.80 | RANGPUR | GANGACHARA, RANGPUR SADAR | Rangpur-1, Rangpur-3 | Completed | |
| BANK PROTECTION | Riverbank conservation project along the left and right banks of the Dharla River in the Ghoshpara, Dayaltari and Bostari areas of former Bamboo Cutting Entente No. 119 under Patgram Upazila of Lalmonirhat district | JAN-17 JUN-19 | 2,472.00 | LALMONIRHAT | PATGRAM | Lalmonirhat-1 | Completed | |
| TOWN PROTECTION | Project to protect various structures in Sadar Upazila and Fulchhari Upazila, including mass graves, of Gaibandha district from erosion of the right bank of the Jamuna River | JUL-17 JUN-22 | 31,496.80 | GAIBANDHA | FULCHHARI, GAIBANDHA SADAR | Gaibandha-2, Gaibandha-5 | Completed | |
| TOWN PROTECTION | Project to protect the area from Sonakandi to Bulanpur, included in Rajshahi Metropolitan City, from erosion of the Padma River | JUL-16 JUN-19 | 28,690.89 | RAJSHAHI | PABA | Rajshahi-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Jobaibeel Flood Control, Drainage & Irrigation Project in Upazilla Shapahar and Porsha under Naogaon District (1st Revised). | SEP-16 JUN-20 | 4,040.08 | NAOGAON | PORSHA, SAPAHAR | Naogaon-1 | Completed | |
| TOWN PROTECTION | Protection of Singra Pourasava Area from Erosion of the River Atrai and Nagor in Natore District (1st Revised). | OCT-17 JUN-21 | 4,806.51 | NATORE | SINGRA | Natore-3 | Completed | |
| BANK PROTECTION | Construction project including conservation work on the right bank of the Jamuna River from Kurnibari to Chandanbaisha under Sariakandi Upazila of Bogra district | JUL-15 JUN-19 | 33,337.93 | BOGURA | SARIAKANDI | Bogura-1 | Completed | |
| TOWN PROTECTION | Protection of Khudbandhi, Singrabari and Shuvogacha area of Kazipur Upazila in Sirajganj District from erosion of the Jamuna River (1st Revised). | JUL-17 JUN-20 | 46,460.00 | SIRAJGANJ | KAZIPUR, SIRAJGANJ SADAR | Sirajganj-1, Sirajganj-2 | Completed | |
| RIVER DREDGING | Re-excavation of sureswar khal and drainage project (1st revised) | JUL-16 JUN-21 | 5,194.43 | MADARIPUR, SHARIATPUR | BHEDARGANJ, DAMUDYA, GOSAIRHAT, KALKINI, NARIA, SHARIATPUR SADAR, ZANJIRA | Madaripur-3, Shariatpur-1, Shariatpur-2, Shariatpur-3 | Completed | |
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Rajor Kotailipara flood control, Drainage & Irrigation (FCDI) project (1st Revised) | AUG-16 JUN-21 | 9,994.43 | GOPALGANJ, MADARIPUR | KOTALIPARA, RAJOIR | Gopalganj-3, Madaripur-2 | Completed | |
| TOWN PROTECTION | Project to protect Dhaka-Mawa-Bhanga-Khulna National Highway adjacent to Haji Shariatullah Bridge from erosion of Arial Khan River (1st Revised) | JUL-16 JUN-19 | 6,273.48 | MADARIPUR | SHIBCHAR | Madaripur-1 | Completed | |
| TOWN PROTECTION | Rajbari Town Protection (Phase-2) (1st Revised) | JUL-17 JUN-22 | 37,628.12 | RAJBARI | RAJBARI SADAR | Rajbari-1 | Completed | |
| RIVER DREDGING | Nobogonga River Re-excavation Project | JUL-17 JUN-19 | 4,104.23 | MAGURA | MAGURA SADAR | Magura-1 | Completed | |
| REHABILATATION | Rehabilitation of Satla-Bagda Project in Barishal District (1st Revised) | OCT-17 JUN-22 | 4,569.34 | BARISHAL | AGAILJHARA, GAURNADI, WAZIRPUR | Barishal-1, Barishal-2 | Completed | |
| TOWN PROTECTION | River Bank Protection Work for Protection of Tajumuddin Upazila Sadar in Bhola District from Erosion of The Meghna River (1st Revised) | JUL-16 JUN-21 | 60,938.09 | BHOLA | TAZUMUDDIN | Bhola-3 | Completed | |
| TOWN PROTECTION | Protection of Charfession Pourassava Town from the Erosion of Meghna River in Bhola District (1st Revised) | JUL-16 JUN-20 | 27,797.58 | BHOLA | CHAR FASSON | Bhola-4 | Completed | |
| TOWN PROTECTION | Protection of Ramneoaz Launchghat area of Monpura Upazila from the erosion of Meghna River and Ghosherhat Launchghat area of Charfession Upazila from the erosion of Tentulia River in Bhola District (1st Revised). | JUL-16 JUN-20 | 31,354.73 | BHOLA | CHAR FASSON, MANPURA | Bhola-4 | Completed | |
| TOWN PROTECTION | Protection of Lord Hardinge and Dholigournagar Bazar of Lalmohan Upazilla from the erosion of the Meghna River in Bhola District (1st Revised). | JUL-18 JUN-22 | 39,360.00 | BHOLA | LALMOHAN | Bhola-3 | Completed | |
| FLOOD CONTROL | Protection Work from Bokshi Launchghat to Baburhat Launchghat area from the Erosion of Tentulia River including Dredging Work and Flood Protection in Kukri-Mukri Island at Charfession Upazila under Bhola District (1st Revised). | JUL-18 JUN-22 | 48,574.48 | BHOLA | CHAR FASSON | Bhola-4 | Completed | |
| REHABILATATION | Rahabilitation of polder no. 36/1 in Bagerhat (2nd Revised) | OCT-15 JUN-22 | 20,154.36 | BAGERHAT, KHULNA | CHITALMARI, FAKIRHAT, MOLLAHAT, RUPSA | Bagerhat-1, Khulna-4 | Completed | |
| RIVER DREDGING | Re-excavation of 83 Rivers/Khals and Increase Navigation of Mongla-Ghasiakhali Channel in Bagerhat District (1st Revised). | DEC-16 JUN-22 | 18,794.16 | BAGERHAT | BAGERHAT SADAR, MONGLA, RAMPAL | Bagerhat-2, Bagerhat-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Rehabilitation of Bhutiar Beel & Barnal-Salimpur-Kolabashukhali Flood Control & Drainage Project in Khulna District (Phase-II) (2nd revision). | JAN-13 JUN-21 | 30,013.29 | KHULNA, NARAIL | DIGHALIA, KALIA, RUPSA, TEROKHADA | Khulna-4, Narail-1 | Completed | |
| RIVER DREDGING | Re-excavation of bhadra & salta river for removal of drainage congestion in khulna district | JUL-16 JUN-19 | 4,298.47 | KHULNA | DUMURIA | Khulna-5 | Completed | |
| DRAINAGE | Drainage improvement of Upper Bhadra river, Horihar river, Buri-Bhadra River & adjacent khals in Monirampur & Keshabpur Upazilla, District-Jessore (1" Revised) | MAR-18 JUN-21 | 5,380.88 | JASHORE | KESHABPUR, MANIRAMPUR | Jashore-5, Jashore-6 | Completed | |
| FEASIBILITY STUDY | Planning for Flood Management in Bangladesh | JAN-17 JUN-19 | 2,747.54 | Completed | ||||
| FEASIBILITY STUDY | Feasibility Study for Flood Control, Drainage & Irrigation System at Gowainghat in Sylhet District | OCT-17 JUN-19 | 292.00 0.00 | SYLHET | GOWAINGHAT | Sylhet-4 | Completed | |
| FEASIBILITY STUDY | Feasibility Study for ESIA for Resuscitation of Ichamoti River in Pabna District | OCT-17 JUN-19 | 326.83 | Completed | ||||
| FEASIBILITY STUDY | Technical Feasibility Study and Environmental & Social Impact Assessment (ESIA) of Embankment-cum-road and Water Management Systems for Economic Zone-4 at Sonadia-Ghotibhanga Islands, Moheshkhali, Coxsbazar | JAN-18 JUN-19 | 341.00 | COX'S BAZAR | MAHESHKHALI | Cox's Bazar-2 | Completed | |
| BANK PROTECTION | Bank Protective Work along the Left Bank of Padma River from Majhir Char-Narisha Bazar- Mokshedpur at Dohar Upazila in Dhaka District (1st Revised) | NOV-18 JUN-25 | 201,131.48 200,295.16 | DHAKA | DOHAR | Dhaka-1 | Completed | Download |
| DRAINAGE | Drainage Improvement of Dhaka-Narayangonj- Demra (DND) Project (Phase-2) (1st Revised) | SEP-16 JUN-24 | 129,991.17 96,022.25 | DHAKA, NARAYANGANJ | DEMRA, JATRABARI, KADAMTALI, NARAYANGANJ SADAR, SHYAMPUR | Dhaka-4, Dhaka-5, Narayanganj-5 | Completed | |
| BANK PROTECTION | Bachamara, Bahadurpur and Dhulsura areas of Manikganj district are protected from river erosion (1st Revised) | JUN-21 JUN-23 | 5,551.21 5,508.76 | MANIKGANJ | DAULATPUR, GHIOR, SHIBALAYA | Manikganj-1 | Completed | |
| RIVER DREDGING | Re-excavation of Arialkha River, Haridoya River, Brahmaputra River, Paharia River Meghna Barnch River and Old Brahmaputra Branch River Project under Narsingdi District (1st Revised) | AUG-17 JUN-23 | 90,341.76 85,805.62 | NARAYANGANJ, NARSINGDI | ARAIHAZAR, BANDAR, BELABO, MANOHARDI, NARSINGDI SADAR, PALASH, ROYPURA, SHIBPUR, SONARGAON | Narayanganj-2, Narayanganj-3, Narayanganj-5, Narsingdi-1, Narsingdi-2, Narsingdi-3, Narsingdi-4, Narsingdi-5 | Completed | |
| BANK PROTECTION | Protection From River Erosion of Shitalakshya River at Taragonj Bazar & Adjoining Area of Durgapur Union under Kapasia Upazila in Gazipur District | APR-22 JUN-24 | 3,079.30 1,095.02 | GAZIPUR | KAPASIA | Gazipur-4 | Completed | |
| BANK PROTECTION | Land Development, Wave Protection and River Bank Protection for Mithamoin Cantonment at Upazilla:, Mithamoin, District: Kishoreganj | JAN-19 JUN-24 | 35,034.33 32,813.29 | KISHOREGANJ | MITHAMAIN | Kishoreganj-4 | Completed | |
| BANK PROTECTION | Detailed Feasibility Study for Identifying Erosion Vulnerability and Protection of Proposed Economic Zone Construction at Bhuapur Upazila in Tangail District | OCT-21 JUN-22 | 282.38 | TANGAIL | BHUAPUR | Tangail-2 | Completed | |
| RIVER DREDGING | Re-Excavation of Titas River (Lower Titas) at Titas and Homna Upazilla in Cumilla District (1st Revised) | AUG-20 JUN-24 | 7,885.15 4,247.39 | CUMILLA | HOMNA, TITAS | Cumilla-2 | Completed | |
| BANK PROTECTION | Bank Protection along the Both Bank of Surma River at Dashgram, Mahtabpur and Rajapur Porgana Bazar Area of Sylhet Sadar and Bishwnath Upazila of Sylhet District (1st Revised) | DEC-19 JUN-24 | 13,504.13 9,158.50 | SYLHET | BISHWANATH, SYLHET SADAR | Sylhet-1, Sylhet-2 | Completed | |
| BANK PROTECTION | Protective Work along the right bank of Surma river at Dowarabazar Upazila Complex, Laxmibazar and Betura in Upazila Dowarabazar and Chatak in Sunamganj District | JUN-20 JUN-24 | 19,167.23 12,805.29 | SUNAMGANJ | CHHATAK, DOWARABAZAR | Sunamganj-5 | Completed | |
| OTHERS | Feasibility Study for Integrated Water Resource Management & Development of Polder no- 72 under Sandwip upazila in Chattogram District. | FEB-22 JUN-23 | 361.00 | CHATTOGRAM | SANDWIP | Chattogram-3 | Completed | |
| DRAINAGE | Projects for improvement of water logging problem and erosion prevention of Khutakhali union under Chakaria upazilla of Cox's Bazar district. (1st Revised) | JUN-21 JUN-23 | 2,073.40 1,592.17 | COX'S BAZAR | CHAKARIA | Cox's Bazar-1 | Completed | |
| BANK PROTECTION | River Bank Protective work & Dredging at the left bank of Brahmaputra River from Ghughumari to Fuluar char of Roumari Upazila and from Rajibpur upazila sadar (Member Para) to Mohonganj Bazar of Rajibpur Upazila in Kurigram District. (1st Revised) | AUG-19 JUN-25 | 46,435.21 | KURIGRAM | CHAR RAJIBPUR, RAUMARI | Kurigram-4 | Completed | Download |
| BANK PROTECTION | Protection of Goghat and adjacent area including Khanabari from the Right Bank erosion of the Jamuna River At Gaibandha Sadar and Sundargonj Upazilla in Gaibhandha District (1st Revised) | AUG-20 JUN-24 | 40,175.96 24,118.42 | GAIBANDHA | GAIBANDHA SADAR, SUNDARGANJ | Gaibandha-1, Gaibandha-2 | Completed | |
| BANK PROTECTION | Bank protective work & Re-excavation of Small River, Khal, Water Reservoir and Removing water logging in Upazila Pirgonj under District Rangpur. (1st Revised) | NOV-21 DEC-24 | 19,037.67 17,142.67 | RANGPUR | PIRGANJ | Rangpur-6 | Completed | Download |
| BANK PROTECTION | Straitening of Charalkata River and Bank Protection work of Buri Teesta River in Nilphamari District. (1st Revised) | JUL-21 JUN-24 | 16,918.41 12,680.72 | NILPHAMARI | JALDHAKA, KISHOREGANJ, NILPHAMARI SADAR | Nilphamari-2, Nilphamari-3, Nilphamari-4 | Completed | |
| BANK PROTECTION | River bank Protection at Dhepa, Punarbhaba and Tangon river in Dinajpur district. | OCT-21 DEC-23 | 18,005.32 7,925.86 | DINAJPUR | BIRAL, BOCHAGANJ | Dinajpur-2 | Completed | |
| BANK PROTECTION | Protection of Charbagdanga and Shajahanpur Area in Sadar Upazila of Chapainawabganj District from the Erosion of the Padma District (1st Revised) | JUL-20 JUN-25 | 60,385.27 58,921.68 | CHAPAI NAWABGANJ | CHAPAI NABABGANJ SADAR | Chapainawabganj-3 | Completed | Download |
| BANK PROTECTION | Rehabilitation of 3 nos. Project in Upazilla-Dhamoirhat, Patnitala & Mohadevpur, District Naogaon and Bank Protection Project Including Dredging of Atrai River. | AUG-20 JUN-24 | 17,636.41 11,034.04 | NAOGAON | DHAMOIRHAT, MAHADEBPUR, PATNITALA | Naogaon-2, Naogaon-3 | Completed | |
| BANK PROTECTION | Riverbank Protective work along the Right Bank of Jamuna River from Munsigonj to Khanpara and Kazirhat to Rajdhordia in Bera Upazila of Pabna District (1st Revised) | AUG-20 JUN-25 | 43,771.18 41,611.47 | PABNA | BERA | Pabna-1 | Completed | |
| BANK PROTECTION | Protection of Shingrabari, Patagram & Baokhola from erosion of Jamuna river at Upazila-Kazipur, District-Sirajganj | DEC-20 JUN-25 | 55,476.82 37,895.77 | SIRAJGANJ | KAZIPUR | Sirajganj-1 | Completed | |
| BANK PROTECTION | Protection of Right Bank of padma River at Naria is Janjira Upazilla Shariatpur District (1st Revised) | FEB-18 JUN-23 | 141,719.06 140,316.10 | SHARIATPUR | NARIA, ZANJIRA | Shariatpur-1, Shariatpur-2 | Completed | |
| BANK PROTECTION | Protection from erosion of Right Bank of Padma Branch River at Nowapara and Left Bank of Padma River at Charatra of Naria Upazila in Shariatpur District (1st Revised) | DEC-19 JUN-24 | 59,652.82 54,487.20 | SHARIATPUR | NARIA | Shariatpur-2 | Completed | |
| BANK PROTECTION | Protection of The Right and Left Bank of Kirtinasha River at Shariatpur District (1st Revised) | DEC-21 JUN-25 | 35,787.76 34,054.97 | MADARIPUR, SHARIATPUR | KALKINI, NARIA, SHARIATPUR SADAR | Madaripur-3, Shariatpur-1, Shariatpur-2 | Completed | Download |
| BANK PROTECTION | West Gopalganj Integrated Water Management Project (2nd Phase) (1st Revised) | JUN-21 DEC-24 | 14,772.59 12,854.22 | GOPALGANJ | GOPALGANJ SADAR, KASHIANI, MUKSUDPUR | Gopalganj-1, Gopalganj-2 | Completed | Download |
| BANK PROTECTION | Bank Protective Work & dredging in Arial Khan River at Shibchar Upazila of Madaripur District (1st Revised) | FEB-20 JUN-25 | 40,428.24 38,028.92 | MADARIPUR | SHIBCHAR | Madaripur-1 | Completed | Download |
| DRAINAGE | Kumar River Re-excavation (1st Revised) | DEC-16 JUN-23 | 21,324.91 20,539.36 | FARIDPUR, GOPALGANJ | BHANGA, BOALMARI, FARIDPUR SADAR, MUKSUDPUR, NAGARKANDA, SALTHA | Faridpur-1, Faridpur-2, Faridpur-3, Faridpur-4, Gopalganj-1 | Completed | |
| DRAINAGE | Bank Protective Work & Dredging in Gorai River (2nd Revised) | NOV-18 JUN-25 | 65,496.31 65,215.92 | KUSHTIA | KHOKSA, KUMARKHALI, KUSHTIA SADAR | Kushtia-3, Kushtia-4 | Completed | Download |
| BANK PROTECTION | River Bank Protection Work to Protect Charbaria Area from the Erosion of Kirtonkhola River at Barisal Sadar Upazila in Barisal District | NOV-17 JUN-23 | 37,098.62 35,024.38 | BARISHAL | BARISHAL SADAR (KOTWALI) | Barishal-5 | Completed | |
| BANK PROTECTION | River Bank Protection Work From Erosion of Arial Khan River at Honabad Bazar, Launch Ghat and Adjacent area in Gouronadi Upazilla of Barisal District. | APR-21 JUN-23 | 4,184.55 3,945.75 | BARISHAL | GAURNADI | Barishal-1 | Completed | |
| BANK PROTECTION | Rehabilitation of Coastal Polder No:62 (Patenga), 63/1A (Anwara) & 63/1B (Anwara and Patia) in Chittagong District (2nd Revised) | OCT-16 JUN-24 | 57,723.92 48,653.31 | CHATTOGRAM | ANOWARA, PATENGA | Chattogram-11, Chattogram-13 | Completed | |
| BANK PROTECTION | System Dredging/Re-dredging and bank protective work of Bangali-Korotua-Fuljur-Hurasagor River (1st Revised) | JAN-19 JUN-25 | 233,041.18 157,277.00 | BOGURA, GAIBANDHA, SIRAJGANJ | DHUNAT, GOBINDAGANJ, KAMARKHANDA, ROYGANJ, SAGHATA, SARIAKANDI, SHAHJADPUR, SHERPUR, SONATOLA, ULLAH PARA | Bogura-1, Bogura-5, Gaibandha-4, Gaibandha-5, Sirajganj-2, Sirajganj-3, Sirajganj-4, Sirajganj-6 | Completed | Download |
| OTHERS | Coastal Embankment Improvement Project Phase-1 (CEIP-1) in Satkhira, Khulna, Bagerhat, Pirojpur, Barguna and Patuakhali District (2nd Revised) | DEC-23 DEC-23 | 328,000.00 266,748.12 | Completed | ||||
| OTHERS | Irrigation Management Improvement Project (For Mohuri Irrigation) (3rd Revised) | JUL-14 JUN-24 | 56,269.00 44,770.57 | CHATTOGRAM, FENI | CHHAGALNAIYA, FENI SADAR, FULGAZI, MIRSHARAI, PARSHURAM, SONAGAZI | Chattogram-1, Feni-1, Feni-2, Feni-3 | Completed | |
| OTHERS | Miresarai Bangladesh Economic Zone area (BEZA) Flood Control, Road Cum Embankment Protection & Drainage Project in Chittagong District (2nd Revised) | JAN-17 JUN-25 | 163,691.19 162,076.55 | CHATTOGRAM | MIRSHARAI | Chattogram-1 | Completed | |
| BANK PROTECTION | Protraction of the Both Bank of Halda River by Bank Protective Work at Different Locations in Hathazari & Rauzan Upzaila in Chittagong District (2nd Revised) | MAY-17 JUN-23 | 34,974.98 34,970.55 | CHATTOGRAM | HATHAZARI, RAOZAN | Chattogram-5, Chattogram-6 | Completed | |
| BANK PROTECTION | Bank Protection Work of the Sangu and Dalu Rivers in Satkania and Lohagara Upazilas of Chittagong District (2nd Revised) | FEB-18 JUN-25 | 34,360.29 25,414.33 | CHATTOGRAM | LOHAGARA, SATKANIA | Chattogram-14, Chattogram-15 | Completed | Download |
| BANK PROTECTION | River Bank Protection work of Rangunia and Buhalkhali Upzila in Chittagonj District and Kaptai Upzila in Rangamati CHT District from erosion of the Karnafuli, Isamati river and Shilok (1st Revised) | NOV-18 JUN-25 | 41,594.13 41,416.87 | CHATTOGRAM, RANGAMATI | BOALKHALI, KAPTAI, RANGUNIA | Chattogram-7, Chattogram-8, Rangamati | Completed | Download |
| BANK PROTECTION | Bank Protective Work and Dredging along the Right Bank of Padma River in Upazilla-Charbhadrasion , Dist- Faridpur (1st Revised) | OCT-18 JUN-23 | 33,209.72 32,997.32 | FARIDPUR | CHAR BHADRASAN | Faridpur-4 | Completed | |
| BANK PROTECTION | Bill re-excavation and waterlogging project at Mahishkhocha in Aditmari Upazila of Lalmonirhat District | MAR-22 JUN-24 | 4,934.95 3,221.42 | LALMONIRHAT | ADITMARI | Lalmonirhat-2 | Completed | |
| BANK PROTECTION | Rehabilitation of Dinajpur City Protection Project and Dhepa and Garveshwari River System Dredging/Excavation Project adjacent to Dinajpur City (1st Revisd) | AUG-20 JUN-25 | 34,022.58 31,208.06 | DINAJPUR | DINAJPUR SADAR | Dinajpur-3 | Completed | Download |
| RIVER DREDGING | Bhairav River Basin Dewatering and Sustainable Water Management Development Project (1st Revised) | DEC-16 JUN-23 | 27,912.75 22,813.09 | CHUADANGA, JASHORE | ABHAYNAGAR, BAGHER PARA, CHAUGACHHA, DAMURHUDA, JASHORE SADAR, JIBAN NAGAR | Chuadanga-2, Jashore-2, Jashore-3, Jashore-4 | Completed | |
| LAND RECLAMATION | Flood and Riverbank Erosion Risk Management Investment Program (FRERMIP)-Project 2 (2nd Revised) | MAR-22 JUN-25 | 123,429.28 123,429.08 | Completed | Download | |||
| BANK PROTECTION | Protection from Erosion of Jamuna River at Pakerdaha & Balijhuri of Madarganj Upazila of Jamalpur Districts and at Jamthal of Sariakandi Upazila of Bogura District J19 (1st Revised) | APR-20 JUN-25 | 57,441.00 49,502.17 | BOGURA, JAMALPUR | MADARGANJ, SARIAKANDI | Bogura-1, Jamalpur-3 | Completed | Download |
| BANK PROTECTION | Bank Protection of the left bank of the Meghna River from Barikandi to Dharabhanga M.P Bundh & re-excavation of Jamuna Khal at Nabinagar Upazila in Brahmanbaria District (1st Revised) | NOV-19 JUN-23 | 7,211.13 6,472.13 | BRAHMANBARIA | NABINAGAR | Brahmanbaria-5 | Completed | |
| LAND RECLAMATION | Water Logging, Flood Control & Irrigation of Noakhali Area (1st Revised in Process) | NOV-16 JUN-23 | 36,496.56 36,450.95 | NOAKHALI | BEGUMGANJ, COMPANIGANJ, KABIRHAT, NOAKHALI SADAR | Noakhali-3, Noakhali-4, Noakhali-5 | Completed | |
| BANK PROTECTION | Protection of Proposed Economic Zone and Development of Reclaimed Land from Jamuna River in Sirajgonj District (1st Revised) | FEB-18 JUN-23 | 63,617.63 58,443.02 | SIRAJGANJ | SIRAJGANJ SADAR | Sirajganj-2 | Completed | |
| DRAINAGE | Project 0f Re-excavation of Khal to Removal The Drainage Congestion in Begumgonj, Chatkhil, Senbag & Sonaimuri Upazilla of Noakhali District (1st Revised Process) | DEC-20 JUN-23 | 6,117.81 5,643.87 | NOAKHALI | BEGUMGANJ, CHATKHIL, SENBAGH, SONAIMURI | Noakhali-1, Noakhali-2, Noakhali-3 | Completed | |
| BANK PROTECTION | Protection of Harina Ferryghat Area in Chandpur District and Charbairabi Katakhali Bazar Area form the Erosion of the Mehana River (1st Revised) | SEP-17 JUN-23 | 19,048.17 16,648.25 | CHANDPUR | CHANDPUR SADAR, HAIM CHAR | Chandpur-3 | Completed | |
| IRRIGATION | Rehabilitation of Char-Bagadi Pump house & Hazimara Regulator of Chandpur Irrigation Project (2nd Revised) | NOV-18 DEC-23 | 414.69 414.68 | CHANDPUR, LAKSHMIPUR | CHANDPUR SADAR, ROYPUR | Chandpur-3, Lakshmipur-2 | Completed | |
| LAND RECLAMATION | Haor Flood Management and Livelihood Improvement project (BWDB Part) (3rd Revised) | NOV-14 JUN-24 | 99,736.24 93,650.56 | Completed | ||||
| BANK PROTECTION | Baghrua and Karnpur villages in Sadar and Barhatta upazilas of Netrokona district were spared from the collapse of the Kangsh river. | MAR-23 JUN-25 | 4,701.07 4,488.20 | NETROKONA | BARHATTA, NETROKONA SADAR | Netrokona-2 | Completed | Download |
| OTHERS | Pilot Geocell Protection Project on 2.00 KM Length of Submerged Dam at Lalur Goala and Saheb Nagar Place of Shanir Haor under Jamalganj and Tahirpur Upazilas of Sunamganj District. | MAR-23 JUN-24 | 3,823.00 3,343.78 | SUNAMGANJ | JAMALGANJ, TAHIRPUR | Sunamganj-1 | Completed | Download |
| BANK PROTECTION | Conservation of river bank from Khaspukuria of Chauhali Upazila of Sirajganj District to Char-Salimabad to protect the left bank of Yamuna River from erosion. | APR-23 JUN-24 | 4,659.84 375.00 | SIRAJGANJ | CHAUHALI | Sirajganj-5 | Completed | |
| OTHERS | Support to Southwest Area Integrated Water Resources Planning and Management Project Additional Financing in c/w Ensuing Project in Tungipara & Kotalipara Upazila under Gopalganj District. | NOV-22 DEC-23 | 864.00 0.00 | GOPALGANJ | KOTALIPARA, TUNGIPARA | Gopalganj-3 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Preventive work to protect the infrastructures built on canals in Hatia upazila of Noakhali district from the Meghna river breach. | JUN-26 | 37,804.54 | NOAKHALI | HATIYA | Noakhali-6 | Completed | |
| FLOOD CONTROL AND DRAINAGE | Protection of traditional buildings including Kumudini Hospital, Bharateshwari Homes under Kumudini Welfare Trust from the erosion of Lauhjung River under Mirzapur Upazila of Tangail District. | JUN-23 JUN-25 | 4,516.30 3,433.06 | TANGAIL | MIRZAPUR | Tangail-7 | Completed | Download |
| BANK PROTECTION | Re-excavation of Karatoa river and slope protection work on the right bank of Bogra District Commissioner's office and adjacent areas (1st Revised) | NOV-23 JUN-25 | 4,710.85 4,503.54 | BOGURA | BOGURA SADAR, SHAJAHANPUR | Bogura-6, Bogura-7 | Completed | Download |
| BANK PROTECTION | Bank protection work from the continuous erosion of atrai river at different places of khansama upazila in dinajpur district (1st revised). | OCT-18 JUN-21 | 5,568.84 | DINAJPUR | KHANSAMA | Dinajpur-4 | Completed | |
| TOWN PROTECTION | Protection of Important Government Infrastructures of Khulna City from the erosion of Bhairab and Rupsha River (1st Revised). | OCT-18 JUN-21 | 2,995.51 | KHULNA | KHULNA SADAR | Khulna-2 | Completed | |
| REHABILATATION | Feasibility Study for Re-excavation of Shuvadya Khal along with Development and Protection of its both Banks at Keraniganj Upazila in Dhaka District | JUN-20 JUN-21 | 322.50 | DHAKA | KERANIGANJ | Dhaka-3 | Completed | |
| OTHERS | Feasibility Study for the Development and Management of Karnafuli River Basin (with Halda River) | SEP-19 JUN-21 | 497.00 | Completed | ||||
| OTHERS | Feasibility Study for Collection of Detail Information of Land Acquisition and Land Availability on "Dhaka Circular Route: Eastern Bypass" Project | JUL-20 JUN-21 | 489.00 | Completed | ||||
| STUDY | Feasibility Study for Restoration of Sangu and Matamuhuri River Basin | AUG-19 MAY-21 | 495.00 | BANDARBAN, CHATTOGRAM, COX'S BAZAR | ALIKADAM, ANOWARA, BANSHKHALI, CHAKARIA, CHANDANAISH, SATKANIA, THANCHI | Bandarban, Chattogram-13, Chattogram-14, Chattogram-16, Cox's Bazar-1 | Completed | |
| RIVER DREDGING | Feasibility Study for Re-excavation of New Dakatia River in Cumilla and Chandpur District | AUG-20 JUN-21 | 321.00 | Completed | ||||
| BANK PROTECTION | River bank protective work with cc block along the left Bank of dhaleswari river fro1m km 10.920 to 13.050 = 2.130 km to protect the embankment, gach kumulli, baropakia & ghonapara in upazila delduar & nagorpur, dist-tangail. | JAN-17 JUN-21 | 12,489.05 | TANGAIL | DELDUAR, NAGARPUR | Tangail-6 | Completed | |
| REHABILATATION | Re-excavation of Canals for irrigation in Coastal Polders under Barguna Districts (1st Revised). | APR-18 JUN-21 | 6,117.92 | BARGUNA | AMTALI, BAMNA, BARGUNA SADAR, BETAGI, PATHARGHATA, TALTALI | Barguna-1, Barguna-2 | Completed | |
| BANK PROTECTION | Construction of Embankment and Slope Protection at Joydharkandi and Telikandi Area under Sarail Upazila in Brahmanbaria District (1st Revised). | OCT-18 JUN-21 | 2,985.70 | BRAHMANBARIA | SARAIL | Brahmanbaria-2 | Completed | |
| BANK PROTECTION | Protection of Left Bank of Jamuna River in between Kulkandi Hard Point and Guthail Hardpoint at Belgacha Union of Islampur Upazila in District-Jamalpur. (1st Revised). | JUL-17 JUN-21 | 25,366.03 | JAMALPUR | JAMALPUR SADAR | Jamalpur-5 | Completed | |
| BANK PROTECTION | Protection of langolmora and jagotjibanpur area under chagolnaiya & feni sadar upazila of feni district from the erosion of right bank of the feni river. | JUL-19 JUN-21 | 4,681.40 | FENI | CHHAGALNAIYA, FENI SADAR | Feni-1, Feni-2 | Completed | |
| BANK PROTECTION | River Bank Protection & Re-excavation of Jamuneswari, Ghagot and Korotoya River in Upazilla Mithapukur, Pirgacha, Pirgonj & Rangpur Sadar under District Rangpur (1st Revised). | SEP-18 JUN-21 | 15,008.30 | RANGPUR | MITHA PUKUR, PIRGACHHA, PIRGANJ, RANGPUR SADAR | Rangpur-3, Rangpur-4, Rangpur-5, Rangpur-6 | Completed | |
| BANK PROTECTION | River Bank protection work along the left Bank of Ichamati River at Nangla under Polder No.03 in Satkhira District. | JAN-19 JUN-21 | 1,700.79 | SATKHIRA | DEBHATA | Satkhira-3 | Completed | |
| OTHERS | Rehabilitation and drainage improvement of polder no. 64/2A (puichari part) of puichari union under banskhali upazilla of chittagong district. | JUL-18 JUN-21 | 1,128.96 | CHATTOGRAM | BANSHKHALI | Chattogram-16 | Completed | |
| TOWN PROTECTION | Protection of Shaheberchar village & adjacent area from left bank erosion of old Brahmaputra River at Hossainpur Upazilla under Kishoreganj District. | FEB-19 JUN-21 | 4,860.75 | KISHOREGANJ | HOSSAINPUR | Kishoreganj-1 | Completed | |
| BANK PROTECTION | Re-excavation of Bhubaneswar River in Bhandaria Upazila of Pirojpur District and Protection of Various Establishments/Assets from Erosion of Pona River and Bhubaneswar River (1st Revised) | JUL-18 JUN-22 | 3,398.56 | PIROJPUR | BHANDARIA | Pirojpur-2 | Completed | |
| BANK PROTECTION | Embankment construction project around Char Algi Union under Gafargaon Upazila of Mymensingh district (1st revised) | JAN-19 JUN-22 | 5,005.91 | MYMENSINGH | GAFFARGAON | Mymensingh-10 | Completed | |
| REHABILATATION | Canal re-excavation and crop transportation system development project within Dingapota Haor in Mohanganj Upazila of Netrokona District (1st revised) | JUL-20 JUN-22 | 5,349.19 | NETROKONA | MOHANGANJ | Netrokona-4 | Completed | |
| BANK PROTECTION | Arial Khan River Bank Conservation and Dredging Project in Faridpur District (1st Revised) | MAR-18 JUN-22 | 33,047.57 | FARIDPUR | BHANGA, SADARPUR | Faridpur-4 | Completed | |
| OTHERS | Project to protect Ulania-Gobindapur area of Mehendiganj Upazila, Barisal district from erosion of Meghna River (1st revised) | APR-18 JUN-22 | 38,419.27 | BARISHAL | MEHENDIGANJ | Barishal-4 | Completed | |
| OTHERS | Tulshiganga, Chhota Jamuna, Chiri and Harabati River Re-Dredging Project in Joypurhat District (1st Revised) | MAR-19 JUN-22 | 13,647.44 | JOYPURHAT | AKKELPUR, JOYPURHAT SADAR, KHETLAL, PANCHBIBI | Joypurhat-1, Joypurhat-2 | Completed | |
| BANK PROTECTION | Bank protection project to protect the Rahmatkhali canal in Sadar Upazila of Lakshmipur district and the Dakatia river in Raipur Upazila from erosion (1st revised) | JUL-18 JUN-22 | 4,027.71 | LAKSHMIPUR | LAKSHMIPUR SADAR, ROYPUR | Lakshmipur-2, Lakshmipur-3 | Completed | |
| BANK PROTECTION | Bank conservation and flood control project of Halda River and Dhurong Canal in Fatikchhari and Hathazari Upazilas of Chittagong District | OCT-18 JUN-22 | 15,676.90 | CHATTOGRAM | FATIKCHHARI, HATHAZARI | Chattogram-2, Chattogram-5 | Completed | |
| BANK PROTECTION | Conservation Project of the Left Bank of Meghna River at Rajapur in Sarail Upazila of Brahmanbaria District (2nd Revised) | JUL-18 JUN-23 | 4,555.60 | BRAHMANBARIA | SARAIL | Brahmanbaria-2 | Completed | |
| REHABILATATION | Project to protect the Koyala Canal from erosion in Bahadurpur Village, Kazir Char Union No. 7, Muladi Upazila, Barisal District | JAN-18 JUN-20 | 1,080.90 | BARISHAL | MULADI | Barishal-3 | Completed | |
| OTHERS | Feasibility Study for Protection & Development of Cox’sbazar Sea Beach | JUL-18 JUN-20 | 498.50 | Completed | ||||
| STUDY | Feasibility Study for Protection & Development of Kuakata Sea Beach | JUL-19 JUN-20 | 455.62 | Completed | ||||
| OTHERS | Feasibility Study for Providing Irrigation Facilities through Construction of Hydraulic Elevator Dam (HED) across Maeinee River at Dighinala, Khagrachari; Shrimai Khal at Patiya, Chattogram & Kasalang River at Sajek Valley, Rangamati | MAY-19 DEC-19 | 469.55 | Completed | ||||
| OTHERS | Post Project evaluation of 10 BWDB Project | JAN-18 MAR-20 | 344.00 | Completed | ||||
| STUDY | Detailed Feasibility Study for Char Stabilization and Livelihood Development Project in the Jamuna River (Pilot Study Kawakhola Char) | JUN-22 JUN-24 | 490.00 | JAMALPUR, SIRAJGANJ, TANGAIL | BHUAPUR, KAZIPUR, SARISHABARI, SIRAJGANJ SADAR | Jamalpur-4, Sirajganj-1, Sirajganj-2, Tangail-2 | Completed | |
| OTHERS | Detailed Study for Restoration and Development of Wate Resoürces Management System of Polder 31 under Dacop Uazila in Khulna District | AUG-22 JUN-24 | 437.00 | KHULNA | DACOPE | Khulna-1 | Completed | |
| STUDY | Feasibility Study for Integrated and Sustainable Development of Water, Environment, Ecology and Biodiversity in Borni Baor area | FEB-23 JUN-24 | 230.00 | GOPALGANJ | GOPALGANJ SADAR, TUNGIPARA | Gopalganj-2, Gopalganj-3 | Completed | |
| STUDY | Feasibility Study for Integrated Water Resource Management for the Left Bank of Jamuna River Sy (Phase-1) | MAY-22 APR-24 | 481.14 | JAMALPUR | DEWANGANJ, ISLAMPUR, MADARGANJ, SARISHABARI | Jamalpur-1, Jamalpur-2, Jamalpur-3, Jamalpur-4 | Completed | |
| STUDY | Feasibility Study for Integrated Water Resource Management & Development of Polder no- 73/1(A+B) & 73/2 under Hatiya upazila in Noakhali District. | JUL-22 JUN-24 | 380.00 | NOAKHALI | HATIYA | Noakhali-6 | Completed | |
| STUDY | Feasibility Study for Sustainable River Management in Panchagarh and Thakurgaon District | SEP-22 JUN-24 | 497.76 | DINAJPUR, PANCHAGARH, THAKURGAON | BALIADANGI, BIRGANJ, BODA, CHIRIRBANDAR, DEBIGANJ, TENTULIA, THAKURGAON SADAR | Dinajpur-1, Dinajpur-4, Panchagarh-1, Panchagarh-2, Thakurgaon-1, Thakurgaon-2 | Completed | |
| STUDY | Feasibility Study for the Management of the Mahananda River in Chapainawabganj District and Padma River Basin in Chapainawabganj, Rajshahi and Natore District. | SEP-22 DEC-23 | 481.25 | CHAPAI NAWABGANJ, RAJSHAHI | CHAPAI NABABGANJ SADAR, GODAGARI | Chapainawabganj-3, Rajshahi-1 | Completed | |
| STUDY | Feasibility study for integrated water resources management and development of Naf River Estuary and Land Development of Shahparir Dwip | JUN-22 JUN-23 | 332.00 | Completed | ||||
| FLOOD CONTROL | Feasibility Study for the Management ofthe Brahmaputra and Jinjiram River Basins through Flood Control, Drainage Facility and Bank Protection in Kurigram District. | MAR-22 JUN-23 | 498.99 | Completed | ||||
| OTHERS | Feasibility Study for Integrated Water Resources Management and Development of Surma-Kushiyara River Basin in Sylhet District. | MAY-22 JUN-23 | 369.00 | Completed | ||||
| OTHERS | Feasibility Study for Surface Water Retention in Hurasagor River System and Flood Risk Management of Jamuna River in Sirajganj District | MAY-22 JUN-23 | 482.60 | Completed | ||||
| DRAINAGE | RE-EXCAV OF RIVER/KHAL, PART-A | JUL-96 JUN-99 | 16.26 1.75 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | IDA Aided Appurtenant structre | JUL-80 JUN-88 | 9,994.45 8,767.85 | Completed | ||||
| FLOOD CONTROL | Construction of Combined Water Control Structure over Punarbhaba River for Supplementary Irrigation during Drought at Gouripur under Sadar Upazila in Dinajpur District. (2nd Revised). | OCT-16 JUN-21 | 6,296.80 | Completed | ||||
| FLOOD CONTROL | CHAR DEV & SETTLEMENT PROJ-2 | JUL-99 JUN-05 | 8,334.00 7,807.54 | Completed | ||||
| FEASIBILITY STUDY | N.EAST REGIONAL STUDY, FAP-6 | JUL-90 JUN-97 | 4,515.31 4,883.21 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | IDA AIDED SMALL SCALE FCD&I-2 | JUL-87 JUN-96 | 21,937.83 20,810.09 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | SMALL SCALE FC,DR,IRRIGN, PH-2 | JUL-97 JUN-06 | 19,710.03 18,094.72 | Completed | ||||
| STUDY | INTG COASTAL ZONE MANAGEMENT | JUL-02 JUN-06 | 2,129.00 1,794.88 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | BARNAI PROJECT, FCD-4 | JUL-86 JUN-96 | 8,344.32 8,286.33 | Completed | ||||
| BANK PROTECTION | চট্টগ্রাম জেলার হাটহাজারী ও রাউজান উপজেলায় হালদা নদীর উভয় তীরের ভাঙ্গন হতে বিভিন্ন এলাকা রক্ষাকল্পে তীর সংরক্ষণ কাজ প্রকল্প | JAN-17 DEC-19 | | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | POLDER 59/2 EXTENSION | JUL-99 JUN-04 | 1,459.00 1,391.77 | Completed | ||||
| STUDY | Detailed Study for Riverbank Erosion Prediction and Sustainable Mitigation Strategies for the Medium Rivers in Bangladesh | MAY-22 JUN-24 | 388.00 | Completed | ||||
| TOWN PROTECTION | পদ্মা নদীর ভাংগন হতে মানিকগঞ্জ জেলার অতি ঝুকিপূর্ণ হরিরামপুর উপজেলা সদর রক্ষা প্রকল্প | JUL-06 JUN-08 | 2,310.00 2,206.20 | Completed | ||||
| BANK PROTECTION | Bangshi River Bank Prot.Balia | JUN-94 | 77.03 80.06 | Completed | ||||
| STUDY | Feasibility Study for the Management of the Padma River Basin and Rehabilitation of Pabna Irrigation and Rural Development Project in Pabna District. | JUN-22 DEC-23 | 442.57 | Completed | ||||
| STUDY | Feasibility Study for Integrated Water Resources Management of Different Upazilas under Brahmanbaria District. | OCT-22 JUN-23 | 404.00 | Completed | ||||
| BANK PROTECTION | LEFT BANK PRO. OF DHALESWARI | JUL-03 JUN-05 | 707.00 660.67 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Dutch Aided FDR | JUL-89 JUN-90 | 879.65 785.51 | Completed | ||||
| OTHERS | An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions. | MAY-21 DEC-22 | 496.50 | Completed | ||||
| TOWN PROTECTION | নোয়াখালী জেলার কোম্পানীগঞ্জ উপজেলায় পোল্ডার নং ৫৯/৩সি এর আওতাভূক্ত চর এলাহী ইউনিয়নে চর নেংটায় জরুরী প্রতিরক্ষামূলক কাজ | JUL-05 JUN-08 | 1,497.00 505.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | KHOWAI RIVER PROJECT | JUL-95 JUN-05 | 3,371.00 3,085.45 | Completed | ||||
| STUDY | NE REGIONAL STUDY, FAP-6 | JUL-99 JUN-04 | 9,355.00 9,086.57 | Completed | ||||
| STUDY | Construction of Necessary Residential, Administrative and Other Physical Infrastructure at BWDB Establishments. | JUN-21 JUN-22 | 497.03 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | KURIGRAM FCDI N.UN. PH-I | JUL-95 JUN-06 | 3,486.37 3,335.09 | Completed | ||||
| FEASIBILITY STUDY | PROC OF EQUIP & MAT FOR FDR | JUL-99 JUN-00 | 2,674.00 2,511.52 | Completed | ||||
| STUDY | ADV. MODELLING | JUL-05 JUN-07 | 302.00 289.87 | Completed | ||||
| TOWN PROTECTION | সিরাজগঞ্জ জেলায় যমুনা নদী হতে পুনরুদ্ধারকৃত ভূমির উন্নয়ন এবং প্রস্তাবিত অর্থনৈতিক অঞ্চল রক্ষা প্রকল্প | JAN-18 JUN-20 | | Completed | ||||
| BANK PROTECTION | টাঙ্গাইল জেলার দেলদুয়ার উপজেলাধীন ধলেশ্বরী নদীর বাম তীরবর্তী গাছ-কুমুল্লী বারপানিয়া এবং নাগরপুর উপজেলার ঘোনাপাড়াসহ বাবুপুর-লাউহাটি প্রকল্প এলাকায় নদী তীর সংরক্ষণ প্রকল্প | JAN-17 JUN-19 | | Completed | ||||
| FEASIBILITY STUDY | FS OF SMALL RVR.(LOOP-CUT)PC-2 | JUL-00 JUN-02 | 205.00 103.09 | Completed | ||||
| STUDY | SOUTH-WEST AREA INT. W.R.M.P | JUL-03 JUN-05 | 652.00 532.63 | Completed | ||||
| REHABILATATION | কক্সবাজার জেলার বাংলাদেশ-মায়ানমার এ সীমান্ত নিরাপত্তা উন্নত করার জন্য উখিয়া ও টেকনাফ উপজেলায় নাফ নদী বরাবর পোল্ডারসমূহ (৬৭/এ, ৬৭, ৬৭/বি এবং ৬৮) পূনর্বাসন প্রকল্প | OCT-17 JUN-20 | | Completed | ||||
| FLOOD CONTROL | REHAB & RECONST.OF CEP, PART-C | JUL-91 JUN-97 | 30,964.65 30,738.40 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | MATAMUHURI IRRIGATION PROJECT | JUL-00 JUN-05 | 2,013.00 1,997.13 | Completed | ||||
| BANK PROTECTION | মেঘনা নদীর ভাংগন হতে ভোলা জেলার সদর উপজেলাধীন রাজাপুর ও পূর্ব ইলিশা ইউনিয়ন রক্ষার্থে তীর সংরক্ষণ প্রকল্প | DEC-15 JUN-20 | | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | ROAD HBB,ZIA X TO RLY.GHAT | JUL-91 JUN-93 | 155.00 155.00 | Completed | ||||
| TOWN PROTECTION | PROT OF SHIKALBAHA KHAL | JUL-99 JUN-03 | 999.00 971.03 | Completed | ||||
| BANK PROTECTION | নওগাঁ জেলার আত্রাই নদীর ডান তীরে বাঁধ নির্মাণ | JUL-01 JUN-08 | 3,224.00 2,846.50 | Completed | ||||
| FEASIBILITY STUDY | PROCU. OF DREDGER & EQUIP. | JUL-99 JUN-01 | 10,710.75 8,272.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | নোয়াখালী এলাকার জলাবদ্ধতা নিরসনকল্পে বন্যা নিয়ন্ত্রণ ও নিষ্কাশন ব্যবস্থার উন্নয়ন প্রকল্প | JUL-16 JUN-21 | | Completed | ||||
| BANK PROTECTION | চট্টগ্রাম জেলার লোহাগড়া ও সাতকানিয়া উপজেলায় সাঙ্গু এবং ডলু নদীর তীর সংক্ষণ প্রকল্প | OCT-17 JUN-20 | | Completed | ||||
| TOWN PROTECTION | যমুনা নদীর ভাঙ্গন হইতে জামালপুর জেলার অন্তর্গত ইসলামপুর উপজেলার উলিয়া বাজার রক্ষার্থে তীর সংরক্ষণ উপ-প্রকল্প | JUL-05 JUN-08 | 798.00 712.33 | Completed | ||||
| FEASIBILITY STUDY | FLOOD ACTION PLAN COORDINATION | JUL-89 JUN-96 | 2,846.00 1,548.38 | Completed | ||||
| TOWN PROTECTION | শাহবাজপুর গ্যাস ফিল্ড রক্ষা প্রকল্প | JUL-05 JUN-08 | 1,791.00 1,733.44 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | SYSTEM REHABILITATION PROJECT | JUL-90 JUN-99 | 31,583.00 31,280.29 | Completed | ||||
| FEASIBILITY STUDY | EGIS SUPPORT PROJ FOR PRE-WATR | JUL-95 JUN-97 | 604.00 827.73 | Completed | ||||
| BANK PROTECTION | Border River Bank Protection and Development Project (Phase 2) | JUL-17 JUN-20 | | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | IDA AIDED FDR, PH-2 | JUL-87 JUN-93 | 33,561.93 34,378.29 | Completed | ||||
| STUDY | EWS STUDY PROJECT | JUL-04 JUN-07 | 188.00 89.99 | Completed | ||||
| STUDY | Feasibility Study for Rehabilitation of Barisal Irrigation Project (BIP) | AUG-21 JUN-22 | 495.64 | Completed | ||||
| FEASIBILITY STUDY | Feasibility Study and Detailed Engineering of Ganges Barrage | JUL-04 JUN-16 | 4,557.93 4,200.33 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | ADB AIDED FLOOD DAMAGE REHAB | JUL-87 JUN-92 | 13,632.36 13,188.33 | Completed | ||||
| FLOOD CONTROL | REGULATOR ON MANASH & ALAI RVR | JUL-92 JUN-97 | 1,175.95 1,115.05 | Completed | ||||
| IRRIGATION | FDR/98,TEESTA BARR. PROJ,PH-1 | JUL-98 JUN-03 | 9,270.00 9,254.33 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | BARAL BASIN DEVELOPMENT PROJ | JUL-94 JUN-05 | 3,721.00 2,474.19 | Completed | ||||
| DRAINAGE | ভৈরব রিভার বেসিন এলাকার জলাবদ্ধতা দূরীকরণ ও টেকসই পানি ব্যবস্থাপনা উন্নয়ন প্রকল্প | JUL-16 JUN-21 | | Completed | ||||
| RIVER DREDGING | Kumar River Re-excavation Project | JUL-16 DEC-19 | | Completed | ||||
| TOWN PROTECTION | ফেণী নদীর ভাঙ্গন হতে শুক্কুরবাড়ীয়ার হাট ও করের হাট রক্ষাকরণ প্রকল্প | JUL-06 JUN-08 | 998.00 724.42 | Completed | ||||
| DRAINAGE | RE-EXCAV OF RIVER/KHAL, PART-B | JUL-96 JUN-00 | 163.63 109.90 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | MADHUMATI NABAGANGA PROJ,FCD-3 | JUL-84 JUN-94 | 6,713.66 6,632.54 | Completed | ||||
| TOWN PROTECTION | কীর্তনখোলা নদীর ভাঙ্গন হইতে বরিশাল জেলার সদর উপজেলাধীন চরবাড়িয়া এলাকা রক্ষা প্রকল্প | JUL-17 JUN-20 | | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Sharifpur FC project | JUL-94 JUN-95 | 200.00 50.00 | Completed | ||||
| FEASIBILITY STUDY | Dredger & Attendant Plant | JUL-80 JUN-85 | 2,555.00 4,740.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | চট্টগ্রাম জেলার মিরশ্বরাই উপজেলায় বাংলাদেশ অর্থনৈতিক অঞ্চল (বেজা) বন্যা নিয়ন্ত্রণ সড়ক কাম বেড়ী বাঁধ প্রতিরক্ষা ও নিষ্কাশন প্রকল্প | JUL-16 JUN-20 | | Completed | ||||
| CLIMATE CHANGE | Bangladesh Weather and Climate Services Regional Project (BWCSRP) Component-B : Strengthening Hydrological Information Services and Early Warning Systems (SHISEWS) | JUL-16 JUN-21 | | Completed | ||||
| STUDY | SURVEY & INVEST OF NEW PROJECT | JUL-97 JUN-06 | 1,044.00 1,001.18 | Completed | ||||
| DRAINAGE AND IRRIGATION | SALINITY PROT.IN NAZIRPUR AREA | JUL-94 JUN-04 | 1,976.00 1,927.22 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | DUTCH SWEDISH EIP, PH-3, GR-3 | JUL-88 JUN-99 | 4,670.70 4,321.96 | Completed | ||||
| FEASIBILITY STUDY | FS OF MATAMUHURI IRRIGN PROJ | JUL-94 JUN-97 | 60.00 65.61 | Completed | ||||
| OTHERS | Bangladesh Weather and Climate Services Regional Project (BWCSRP) Component-B : Strengthening Hydrological Information Services and Early Warning Systems (SHISEWS) (2nd Revised) | JUL-17 JUN-24 | 34,569.96 20,675.12 | Completed | ||||
| OTHERS | Development of Smart Project Monitoring and Management Information System (SPMMIS) | JUL-15 JUN-17 | 196.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | SOUTH WEST FDR PROJ. (PART-D) | JUL-00 JUN-05 | 7,310.00 6,949.27 | Completed | ||||
| FEASIBILITY STUDY | EGIS SUPPORT PROJECT, (EGIS-2) | JUL-96 JUN-02 | 4,234.05 3,778.84 | Completed | ||||
| FEASIBILITY STUDY | বাংলাদেশ পানি উন্নয়ন বোর্ডের নতুন প্রকল্পের সম্ভাব্যতা সমীক্ষা (পিসি-২) | JUL-05 JUN-08 | 1,177.00 985.05 | Completed | ||||
| BANK PROTECTION | MATAMUHURI RIVER RB PROTECTION | JUL-95 JUN-03 | 559.00 507.32 | Completed | ||||
| REHABILATATION | Emaergency Disaster Damage Rehabilitation (Sector) Project-2007 | JUL-07 JUN-11 | 32,669.00 31,152.21 | Completed | ||||
| OTHERS | Strengthening Hydrological Information Services and Early Warning Systems (Component-B) | JAN-16 JUN-17 | 667.83 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | CHAR DEV & SETTLEMENT, PH-2 | JUL-97 JUN-99 | 913.98 947.58 | Completed | ||||
| FEASIBILITY STUDY | M/STUDY, GROYAN & RIVER PROT | JUL-94 JUN-97 | 121.00 142.89 | Completed | ||||
| FEASIBILITY STUDY | MACRO-ECONOMIC ANALYSIS, PH-2 | JUL-96 JUN-97 | 39.00 0.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | COMPLETED PROJECT, FDR/98 | JUL-99 JUN-03 | 10,000.00 3,054.74 | Completed | ||||
| DRAINAGE | RE-EXCV. OF KOBATAK RVR. | JUL-00 JUN-06 | 2,577.00 2,490.23 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | POLDER 55/2E | JUL-96 JUN-05 | 1,922.00 1,749.08 | Completed | ||||
| STUDY | STUDY OF SEC.TOWN PROT PH-2 | JUL-02 JUN-04 | 621.00 405.00 | Completed | ||||
| FEASIBILITY STUDY | RIVER SURVEY PROGRAMME, FAP-24 | JUL-91 JUN-00 | 5,475.00 4,888.17 | Completed | ||||
| TOWN PROTECTION | BANK PROT.OF SURMA RVR. | JUL-00 JUN-06 | 1,910.00 1,901.03 | Completed | ||||
| IRRIGATION | CAD OF TEESTA BARRAGE | JUL-98 JUN-04 | 9,663.00 9,554.79 | Completed | ||||
| DRAINAGE | FOOD FOR WORK, EXPN-10,RD PROG | JUL-96 JUN-01 | 14,087.53 11,736.33 | Completed | ||||
| OTHERS | Southwest Area Integrated Water Resources Planning & Management (2nd Phase) (2nd Revised) | JUL-15 JUN-23 | 51,531.84 | Completed | ||||
| STUDY | FLOOD FORECASTING & WARNING | JUL-00 JUN-05 | 2,727.00 1,899.34 | Completed | ||||
| STUDY | Detailed Study for East Gopalganj Integrated Water Resources Management Project | APR-22 JUN-23 | 355.00 | Completed | ||||
| FLOOD CONTROL | বরিশাল জেলা সদরের সাথে মেহেন্দিগঞ্জ উপজেলা সদরের যোগাযোগ ও ভূমি পুনরুদ্ধারের জন্য মাসকাটা নদীর উপর ক্রসড্যাম নির্মাণ | JUL-17 JUN-19 | | Completed | ||||
| BANK PROTECTION | সুরমা নদীর তীর সংরক্ষণ প্রকল্প ফেজ-২ | JUL-05 JUN-08 | 2,371.00 2,238.11 | Completed | ||||
| REHABILATATION | Feasibility for re-excavation of small & medium khals-beels in the country | SEP-18 JUN-20 | 498.00 | Completed | ||||
| FEASIBILITY STUDY | NATIONAL & REGIONAL MATH MODL | JUL-97 JUN-00 | 189.75 189.27 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | REHAB/DAMAGE/IRRG STRUC. OF SZ | JUL-98 JUN-00 | 278.68 272.00 | Completed | ||||
| FEASIBILITY STUDY | HYDRO. SURVEY & INVESTIGATION | JUL-91 JUN-96 | 8,263.31 9,068.26 | Completed | ||||
| BANK PROTECTION | পঞ্চগড় জেলার বোদা উপজেলাধীন সাবেক নাজিরগঞ্জ ও দইখাতা ছিটমহল এলাকায় করতোয়া নদীর বাম তীর বরাবর নদী তীর সংরক্ষণ কাজ প্রকল্প | JAN-17 JUN-19 | | Completed | ||||
| BANK PROTECTION | BANK PROT. AT TAJUMUDDIN,BHOLA | JUL-03 JUN-06 | 3,409.00 3,382.44 | Completed | ||||
| REHABILATATION | এডিপি সহায়তায় ২০০৪ সালের বন্যায় জরুরী ক্ষয়ক্ষতি পুনর্বাসন প্রকল্প (পার্ট-ডি) | JUL-04 JUN-08 | 28,078.00 26,234.31 | Completed | ||||
| STUDY | Updating Feasibility Study for Kurigram Irrigation Project (North & South Unit) | JUN-21 JUN-22 | 498.60 | Completed | ||||
| STUDY | WATER SECTOR IMPROV. PROJECT | JUL-97 JUN-04 | 589.00 460.56 | Completed | ||||
| TOWN PROTECTION | নদী সংরক্ষণ ও উন্নয়ন এবং শহর সংরক্ষণ প্রকল্প (২য় পর্যায়) | JUL-98 JUN-08 | 23,538.00 21,889.39 | Completed | ||||
| TOWN PROTECTION | BANK PROT.&DEV OF BURIGANGA RV | JUL-00 JUN-06 | 6,631.00 6,147.93 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | POLDER 71 | JUL-99 JUN-06 | 2,626.00 2,622.04 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | ADB AIDED FDR/98 | JUL-98 JUN-00 | 6,778.75 7,402.00 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | MONU-KHOAI-KUSHIARA-DOLAI,PC-2 | JUL-00 JUN-03 | 131.00 119.77 | Completed | ||||
| FEASIBILITY STUDY | COMPUTERIZN OF PLANNING WING | JUL-96 JUN-99 | 10.00 10.00 | Completed | ||||
| STUDY | Investigation of Morphological Processes at Downstream of Bangabandhu (Jamuna) Bridge and Erosion Control with Environmental and Social Impact Assessment (ESIA) along Left Bank of Jamuna River at Manikganj District. | DEC-21 MAR-23 | 431.04 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | Hail Haor Remaining Works Project | JUL-94 JUN-96 | 255.00 255.00 | Completed | ||||
| BANK PROTECTION | সীমান্ত নদী সংরক্ষণ ও উন্নয়ন প্রকল্প | JUL-98 JUN-08 | 31,405.00 26,008.90 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | 1995 FLOOD DAMAGE REHB. | JUL-98 JUN-02 | 2,989.78 2,982.10 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | POLDER-69 EXTENSION | JUL-96 JUN-05 | 2,026.00 1,959.55 | Completed | ||||
| FEASIBILITY STUDY | FS OF PRIORITY RIVER DREDGING | JUL-98 JUN-00 | 101.50 111.42 | Completed | ||||
| RIVER DREDGING | চাঁপাইনবাবগঞ্জ জেলার সদর উপজেলায় মহানন্দা নদী ড্রেজিং ও রাবার ড্যাম নির্মাণ প্রকল্প | OCT-17 JUN-20 | | Completed | ||||
| STUDY | Detailed Feasibility Study for Rehabilitation of Chandpur Town Protection Project | OCT-21 JUN-22 | 496.00 | Completed | ||||
| LAND RECLAMATION | Estuary Development Programme (EDP) | JUL-02 JUN-11 | 7,353.22 2,434.19 | Completed | ||||
| FLOOD CONTROL | Secondary Towns Integrated Flood Protection (Phase-2) | JUL-04 JUN-13 | 51,973.11 51,387.28 | Completed | ||||
| REHABILATATION | চট্টগ্রাম জেলার উপকূলীয় এলাকায় পোল্ডার নং- ৬২ (পতেঙ্গা), পোল্ডার নং- ৬৩/১এ (আনোয়ারা), পোল্ডার নং- ৬৩/১বি (আনোয়ারা ও পটিয়া) পুনর্বাসন প্রকল্প | MAY-16 JUN-20 | | Completed | ||||
| BANK PROTECTION | PREVN OF JAMUNA-BANGALI MERGER | JUL-03 JUN-06 | 12,513.37 11,943.81 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | IDA & WFP AIDED FDR/98 | JUL-98 JUN-02 | 15,720.00 14,679.68 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | RETD.EMBK.&SLUICE,POLDER 56/57 | JUL-01 JUN-06 | 2,970.40 2,340.01 | Completed | ||||
| FEASIBILITY STUDY | FS OF MUHURI-KAHUA FC PROJECT | JUL-94 JUN-97 | 40.00 55.00 | Completed | ||||
| BANK PROTECTION | চট্টগ্রাম জেলার বোয়ালখালী উপজেলাধীন চরণদ্বীপ ও কুদুরখিল এলাকা সংলগ্ন কর্নফুলী নদীর বাম তীর সংরক্ষণ প্রকল্প | JUL-06 JUN-08 | 1,293.00 916.14 | Completed | ||||
| TOWN PROTECTION | মেঘনা নদীর ভাঙ্গন হতে চাঁদপুর জেলার হরিণা ফেরীঘাট এলাকা এবং চরভৈরবী এলাকার কাটাখাল বাজার রক্ষা প্রকল্প | JUL-17 JUN-20 | | Completed | ||||
| IRRIGATION | SUNDALPUR IRRIGATION PROJECT | JUL-98 JUN-04 | 833.00 825.45 | Completed | ||||
| TOWN PROTECTION | CHANDPUR TOWN PROT PROJECT | JUL-97 JUN-07 | 10,880.00 10,132.44 | Completed | ||||
| FEASIBILITY STUDY | FS OF ATRAI RVR RGT BANK(PC-2) | JUL-97 JUN-00 | 20.00 17.53 | Completed | ||||
| IRRIGATION | COMMAND AREA DEVELOPMENT | JUL-95 JUN-03 | 27,577.00 26,811.30 | Completed | ||||
| FEASIBILITY STUDY | NATIONAL WATER MANAGEMNT PLAN | JUL-97 JUN-02 | 5,736.00 4,965.93 | Completed | ||||
| STUDY | Feasibility Study for Integrated Water Resources Management of Haor Areas in Sunamganj District | MAY-22 JUN-23 | 371.00 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | AMIRPUR-BHANDERCOT BALIADANGA | JUL-98 JUN-05 | 2,088.00 2,044.23 | Completed | ||||
| STUDY | FAP-21 MONITORING & TRAINING | JUL-03 JUN-06 | 964.00 738.08 | Completed | ||||
| STUDY | Feasibility Study for Mathematical Model Study for Integrated Development and Sustainable Management Plan of Shabazpur Channel of Lower Meghna River. | NOV-22 JUN-23 | 496.06 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | Balali Padmasree Irrigation | JUL-85 JUN-94 | 412.79 390.37 | Completed | ||||
| BANK PROTECTION | Bangali Nadi prot at Hindukani | JUL-94 JUN-95 | 106.00 96.00 | Completed | ||||
| TOWN PROTECTION | PROT AT KAOWAMARA BHU-TARA RD | JUL-04 JUN-06 | 887.00 858.34 | Completed | ||||
| FEASIBILITY STUDY | S.W SIMULATION MODELLING,PH-3 | JUL-93 JUN-97 | 1,952.00 1,820.15 | Completed | ||||
| TOWN PROTECTION | PROT. OF BARISAL KIRTANKHOLA | JUL-05 JUN-07 | 1,618.00 798.55 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | SOMESWARI RVR.HAZARD MANAGMNT | JUL-99 JUN-05 | 1,938.00 1,446.34 | Completed | ||||
| FEASIBILITY STUDY | Feasibility Study in Connection with Construction of Water Treatment Plant for Ponding Area of Goran-Chatbari Pump House, Dhaka | OCT-17 JUN-19 | | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | 2ND SMALL SCALE FC,DR,IRRGN | JUL-97 JUN-99 | 381.92 365.97 | Completed | ||||
| TOWN PROTECTION | নদী সংরক্ষণ ও উন্নয়ন এবং শহর সংরক্ষণ প্রকল্প (৩য় পর্যায় ) | JUL-99 JUN-08 | 32,580.00 31,414.35 | Completed | ||||
| STUDY | Feasibility Study for Water Resources Management in the Kirtonkhola-Shugandhya-Bishkhali River System. | JUN-22 JUN-24 | 455.00 | Completed | ||||
| FEASIBILITY STUDY | FS OF MATAMUHURI IRRIGN PROJ | JUL-94 JUN-96 | 60.00 57.50 | Completed | ||||
| STUDY | Feasibility Study for Augmentation, Conservation and Wise Use of Surface Water Resources through Dredging of the Upstream of Teesta Barrage and Bank Protection Work of the Teesta River in Kurigram District. | FEB-22 JUN-23 | | Completed | ||||
| REHABILATATION | South-West Area Integrated Water Resources Planning & Management Project (Phase-2) | JUL-15 JUN-22 | | Completed | ||||
| TOWN PROTECTION | MYMENSING TOWN RVBANK PROT PRJ | JUL-01 JUN-06 | 2,444.00 2,430.66 | Completed | ||||
| DRAINAGE AND IRRIGATION | BARA BILA BEEL PROJECT | JUL-94 JUN-96 | 284.42 275.00 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | ক্ষুদ্রায়তন বন্যা নিয়ন্ত্রণ, নিস্কাশন ও সেচ প্রকল্প (মুরাদনগর) | JUL-05 JUN-08 | 2,191.00 1,024.15 | Completed | ||||
| BANK PROTECTION | Bangshi River prot at Chaughat | JUN-96 | 30.00 34.50 | Completed | ||||
| FEASIBILITY STUDY | MEGHNA ESTUARY STUDY, FAP-5B | JUL-95 JUN-99 | 3,357.00 2,864.62 | Completed | ||||
| BANK PROTECTION | BANK PROTECTN & RTPP,FAP-21/22 | JUL-90 JUN-02 | 18,364.00 18,301.48 | Completed | ||||
| IRRIGATION | POST DRAUGHT REH OF DTW PROJ | JUL-94 JUN-96 | 137.44 128.00 | Completed | ||||
| TOWN PROTECTION | RV.PROT.TR & TOWN PROT PH-I | JUL-96 JUN-04 | 36,265.00 34,867.00 | Completed | ||||
| FEASIBILITY STUDY | FFW SYSTEM DEVELOPMENT | JUL-89 JUN-96 | 4,420.42 4,352.00 | Completed | ||||
| BANK PROTECTION | Re-excavation of small rivers, khals & water-bodies in 64 Districts (Phase-I) (2nd Revised) | NOV-18 JUN-24 | 227,954.61 | Completed | ||||
| BANK PROTECTION | BANK PROT MEGHNA-TENTULIA,PH-I | JUL-03 JUN-06 | 2,118.98 2,080.50 | Completed | ||||
| STUDY | Feasibility Study for the Protection of Sheikh Hasina Cantonment Area from the Erosion of Karkhana, Bighai and Payra Rivers in Barisal District | JAN-22 JUN-22 | 237.05 | Completed | ||||
| FEASIBILITY STUDY | MODER.OF ACCOUNTING PROC, PH-2 | JUL-97 JUN-03 | 979.98 949.70 | Completed | ||||
| FLOOD CONTROL | FC Embankment along Left bank of Manu River (2nd Phase) | JUL-94 JUN-96 | 252.40 270.00 | Completed | ||||
| FLOOD CONTROL | REHAB OF BHUAPUR TARAKANDI | JUL-99 JUN-06 | 1,094.00 1,087.14 | Completed | ||||
| FEASIBILITY STUDY | TOPOGRAPHIC MAPPING, FAP-18 | JUL-90 JUN-97 | 3,205.55 2,621.22 | Completed | ||||
| STUDY | Feasibility Study for the Management of Karatoa River System and Rehabilitation of FCD Projects on Both Bank of Nagar River in Bogura District. | APR-22 MAY-23 | 499.39 | Completed | ||||
| DRAINAGE | DAMUDDA CHANNAL DREDGING PROJ | JUL-97 JUN-99 | 130.54 95.78 | Completed | ||||
| BANK PROTECTION | SPUR AT HASNAPARA, C. BAISHA | JUL-01 JUN-06 | 9,087.00 8,538.80 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | EIP FDR-1998 | JUL-99 JUN-02 | 2,867.71 2,206.95 | Completed | ||||
| BANK PROTECTION | শরীয়তপুর জেলার জাজিরা ও নড়িয়া উপজেলায় পদ্মা নদীর ডান তীর রক্ষা প্রকল্প | OCT-17 JUN-21 | | Completed | ||||
| STUDY | Development Innovation Approaches to Management of Major Irrigation System (DIAMMIS) | JUL-09 JUN-11 | 607.38 507.30 | Completed | ||||
| FLOOD CONTROL, DRAINAGE AND IRRIGATION | কমান্ড এরিয়া উন্নয়ন প্রকল্প (২য় পর্যায়) | JUL-06 JUN-08 | 790.00 555.95 | Completed | ||||
| STUDY | MODR OF MOWR FIN. MANAGEMENT | JUL-02 JUN-06 | 1,320.00 1,239.70 | Completed | ||||
| STUDY | Feasibility Study for Integrated Water Resources Management and Development of Kutubdia and Matarbari Island | JAN-22 JUN-23 | 426.51 | Completed | ||||
| BANK PROTECTION | Jamuna Meghna River Erosion Mitigation Project (JMREMP) | JUL-02 JUN-11 | 43,353.00 42,712.63 | Completed | ||||
| BANK PROTECTION | জামালপুর জেলার ইসলামপুর উপজেলায় অবস্থিত কুলকান্দি ও গুঠাইল হার্ডপয়েন্টের মধ্যবর্তী বেলগাছা এলাকাটি যমুনা নদীর ভাঙ্গন হতে রক্ষা প্রকল্প | JUL-17 JUN-19 | | Completed | ||||
| BANK PROTECTION | Protection of Embankment (from km 29.462 to km 39.000) Polder No. 56/57 from erosion of the Meghna River at Daulatkhan & Borhanuddin Upazilla in Bhola District (1" Revised) | JAN-16 JUN-20 | 55,063.90 | Completed | ||||
| FEASIBILITY STUDY | STUDY FOR JAMUNA-MEGHNA ERROSN | JUL-01 JUN-02 | 713.00 614.56 | Completed | ||||
| REHABILATATION | DTW REP & REHAB PROJ. DINAJPUR | JUL-95 JUN-04 | 3,387.00 2,307.67 | Completed | ||||
| STUDY | FS&M.STUDY OF GOMOTI EMBKT. | JUL-00 JUN-04 | 151.00 131.00 | Completed | ||||
| DRAINAGE | JURI RIVER RE-EXCAVATION | JUL-04 JUN-06 | 457.00 397.42 | Completed | ||||
| STUDY | Feasibility Study for Conservation and Use of Rainwater through Construction of Environment Friendly Water Reservoir at Khoia Chhara and Govaniya Chhara of Mirsharai Upazila and Kumira Chhara of Sitakunda Upazila under Chattogram district. | NOV-21 JUN-23 | 489.00 | Completed | ||||
| CLIMATE CHANGE | Climate Smart Agricultural Water Management Project (CSAWMP) | JAN-17 JUN-18 | 558.15 | Completed | ||||
| FEASIBILITY STUDY | FLOATING PUMP FOR G.K PROJ(FS) | JUL-94 JUN-97 | 38.77 32.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | RAMSHIL-KAPULABARI FC,DR PROJ | JUL-97 JUN-04 | 2,378.00 2,326.00 | Completed | ||||
| STUDY | FS FOR IMPRV OF FC& WARNING S. | JUL-02 JUN-04 | 742.65 704.68 | Completed | ||||
| BANK PROTECTION | Bank Prot.Yusufpur to Sardah | JUL-91 JUN-93 | 300.00 255.20 | Completed | ||||
| DRAINAGE | EXPN. OF FFW SERVICE,FAP-10 | JUL-94 JUN-99 | 3,251.00 1,225.74 | Completed | ||||
| IRRIGATION | POST DRAUGHT REH OF DTW PROJ | JUL-94 JUN-97 | 137.44 138.00 | Completed | ||||
| FLOOD CONTROL AND DRAINAGE | REHAB & RECONST.OF CEP, PART-A | JUL-90 JUN-92 | 727.00 727.00 | Completed | ||||
| BANK PROTECTION | PROT OF TEESTA LEFT BANK | JUL-98 JUN-06 | 4,333.41 4,324.85 | Completed | ||||
| RIVER DREDGING | নরসিংদী জেলার অন্তর্ভুক্ত আড়িয়াল খাঁ নদী, হাড়িদোয়া নদী, ব্রহ্মপুত্র নদ, পাহাড়িয়া নদী, মেঘনা শাখা নদী ও পুরাতন ব্রহ্মপুত্র শাখা নদ পুনঃখনন প্রকল্প | JUL-17 JUN-21 | | Completed | ||||
| DRAINAGE AND IRRIGATION | South Comilla-North Noakhali Comprensive Drainage and Irragation Project | JUL-05 JUN-10 | 29,848.22 1,802.46 | Completed | ||||
| STUDY | Environmental Impact Assessment (EIA) study of 30 different BWDB projects to be Implemented under CCTF | AUG-13 DEC-15 | 198.05 | Completed | ||||